0% found this document useful (0 votes)
2K views2 pages

Document Numbering System

The document provides information on the numbering structure for project documents. It includes the project identifier, package, structure/infrastructure, discipline, document type, sequence number, sub-sequence number, and revision. The sequence number starts at 0001 for each numbering type, while the sub-sequence number is used for drawings to identify each sheet number with two digits. It also lists examples of project packages, structures/infrastructures, and common document types.

Uploaded by

Tomi Kazuo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views2 pages

Document Numbering System

The document provides information on the numbering structure for project documents. It includes the project identifier, package, structure/infrastructure, discipline, document type, sequence number, sub-sequence number, and revision. The sequence number starts at 0001 for each numbering type, while the sub-sequence number is used for drawings to identify each sheet number with two digits. It also lists examples of project packages, structures/infrastructures, and common document types.

Uploaded by

Tomi Kazuo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Document Numbering Structure: Illustrates the framework for understanding the document numbering structure with categories like project identifier, sequence number, and revision.
  • Structure/Infrastructure List: Lists various structural and infrastructure items along with their descriptions in a table format.

Project Project Structure/ Discipline Document Sequence Sub-sequence

Identifier Package Infrastructure Type Number Number Revision

PDS 3B TF CIV GN 0001 NN Z

Sequence Number Sub-Sequence Number


Project Identifier
Starting at 0001 for each Used only for drawings to
PDS Project Downstream numbering Type. identify each sheet number. It
is consisted of two digits

Project Package

2B Tank Farm
2C Pipe Rack, Water Tank, and Retaining Document Type Revision Number
Wall GN General
2D Water Tank Discipline Code DS Data Sheet 0 Issued Approved for Use /
FO Form Construction / Design
Others Subject to approval CIV Civil Work MS Method Statement 1, 2, 3... Re-issued for Use /
ELE Electrical OB Objectives (Management, Construction / Design
HSE Health, Safety and Environment Quality, HSE, ENV and etc) Z As-Built
INS Instrument PL Management/ Organization
Structure/Infrastructure MEC Mechanical Plan The revision number does not form a part
PIP Piping RG Register of the actual document number.
BID Bio Diesel PQU Project Quality RP Report
DRA Drainage COM Pre-commissioning – SC Schedule
PUH Pump House Commissioning SK Diagram/Sketches
POW Power Plant SP Specification
REF Refinery and Fractionation Others Subject to approval SW Scope of Work
TAF Tank Farm WI Work Instruction
UNT Unloading Truck XL Drawing/Lay-outs
UTB Utility Building
WEB Weight Bridge Others Subject to approval

Others Subject to approval


*Add number for numbering structure/inf

Figure 1 – Document Numbering Structure


Structure/Infrastructure Complete List

No ID Description
1 BID Bio Diesel
2 DRA Drainage
3 FEN Fence
4 JET Jetty
5 PUH Pump House
6 PIR Pipe Rack
7 POW Power Plant
8 REF Refinery and Fractionation
9 TAF Tank Farm
10 UNT Unloading Truck
11 UTB Utility Building
12 WEB Weight Bridge
13 WAT Water Tank
14 WTP Water Treatment Plant
15 WWT Waste Water Treatment Plant

Structure/Infrastructure 
 
BID 
Bio Diesel 
DRA 
Drainage 
PUH   Pump House 
POW 
Power Plant 
REF 
Refinery and Fractionati
Structure/Infrastructure Complete List 
 
 
 
 
 
 
 
 
 
 
 
 
No 
ID 
Description 
1 
BID 
Bio Diesel 
2 
DRA 
Drainage