Professional Documents
Culture Documents
Ceragon FibeAir IP10 Manual PDF
Ceragon FibeAir IP10 Manual PDF
FibeAir RFU-C
Installation Guide
Registered TradeMarks
Ceragon Networks® , FibeAir® and CeraView® are registered trademarks of Ceragon Networks
Ltd.
Other names mentioned in this publication are owned by their respective holders.
TradeMarks
CeraMapTM, ConfigAirTM, PolyViewTM, EncryptAirTM, CeraMonTM, EtherAirTM, and MicroWave
FiberTM, are trademarks of Ceragon Networks Ltd.
Other names mentioned in this publication are owned by their respective holders.
Statement of Conditions
The information contained in this document is subject to change without notice.
Ceragon Networks Ltd. shall not be liable for errors contained herein or for incidental or
consequential damage in connection with the furnishing, performance, or use of this document or
equipment supplied with it.
Information to User
Any changes or modifications of equipment not expressly approved by the manufacturer could
void the user’s authority to operate the equipment and the warranty for such equipment.
Packing.............................................................................................................................. 1-17
Before turning on the equipment, make sure that the fiber optic
! cable is intact and is connected to the transmitter.
The use of optical devices with the equipment will increase eye
! hazard.
电子信息产品有毒有害物质申明
Electronic Information Products Declaration of Hazardous/Toxic Substances
危害物质
Hazardous Substance
成分名称
六价铬 多溴二苯醚
Component 铅 汞 镉 多溴联苯
Hexavalent Polybrominated
Lead Mercury Cadmium Chromium (Cr Polybrominated Diphenyl Ethers
(Pb) (Hg) (Cd) VI) Biphenyls (PBB) (PBDE)
单板 / 电路模块
Comply Comply Comply Comply Comply Comply
PCB/Circuit
Modules
结构件
Comply Comply Comply Comply Comply Comply
Mechanical Parts
电缆
Comply Comply Comply Comply Comply Comply
Cables
Précautions de sécurité
Vergewissern Sie sich vor dem Einschalten der Anlage, dass das faseroptische
! Kabel unbeschädigt und mit dem Sender verbunden ist.
Durch den Einsatz optischer Geräte zusammen mit der Anlage erhöht sich das
! Gesundheitsrisiko für die Augen.
Beachten Sie beim Arbeiten mit FibeAir IDU das folgende Stromschlag- und
! Gefahrenrisiko: Durch Abtrennen einer Stromquelle wird nur ein
Stromversorgungsmodul abgetrennt. Um die Einheit vollständig zu isolieren,
trennen Sie alle Stromversorgungen ab.
Required Tools
The following tools are required for the RFU-C installation:
Socket key wrench metric set
Adjustable wrench
RFU-C
1. If needed, change the antenna polarization by rotating the RFU-C in accordance with the relevant antenna
installation guide.
5. Mount the RFU-C on the antenna according to the system configuration, and make sure that the twist is set
for the desired polarization (horizontal or vertical).
1. If needed, change the antenna polarization according to the relevant antenna installation guide.
2. Spread grease on the two O-rings supplied with the kit and place them in their locations.
3. Mount the twist on the coupler according to the relevant antenna polarization (as shown in the illustrations
below), using four screws and washers supplied with the kit.
7. Spread grease on the O-rings supplied with the holder coupler kit.
8. Place one O-ring on each side of the coupler.
9. Remove the sticker from both RFU-C antenna interfaces.
10. Mount both RFU-Cs on the holder coupler.
11. For each RFU-C, insert four screws and washers, and tighten them, as shown in the following illustration.
8. Place the O-ring in the other end of the flexible waveguide flange groove.
9. Mount the flexible waveguide on the antenna, and tighten the screws and washers.
6-13 GHz
15-38 GHz
2. Mount the coupler holder on the Ceragon remote mount device using the screws and washers supplied with
the kit.
7. For each RFU-C, insert four screws and washers, and tighten them.
10. Mount the flexible waveguide on the Ceragon coupler, and tighten the screws and washers.
11. Spread grease on the O-ring supplied with the flexible waveguide.
12. Place the O-ring in the other end of the flexible waveguide flange groove.
13. Mount the flexible waveguide on the antenna, and tighten the screws and washers.
Notes:
1. The antenna interface is always the RFU-C interface.
2. If other antennas are to be used, an adaptor with a 0.1 dB loss should be considered.
Loss (dB)
Item
6-8 GHz 11 GHz 13-15 GHz 18-32 GHz 38 GHz
Secondary Coupler 6 6 6 6 6
Twist 0 0 0 0 0
An adapter is used for the direct mount, as shown in the following illustration.
RFU-C to
Nokia
FlexiHopper
Antenna
Adapter
RFU-C can be mounted directly for all frequencies (6-38 GHz) using the following antenna types (for integrated
antennas, specific antennas PNs are required):
For remote mount installations, the following flexible waveguide flanges should be used (millimetric). The
same antenna type (integrated) as indicated above can be used (recommended).
Other antenna types using the flanges listed in the table below may be used.
If a different antenna type (CPR flange) is used, a flange adaptor is required. Please contact your Ceragon
representative for details.
Transportation
The equipment should be prepared for public transportation. The cargo must be kept dry during transportation,
in accordance with ETS 300 019-1-2, Class 2.3.
It is recommended that the equipment be transported to the installation site in its original packing case.
If intermediate storing is required, the packed equipment must be stored in a dry and cool environment, and out
of direct sunlight, in accordance with ETS 300 019-1-1, Class 1.2.
Inspection
Check the packing lists and verify that the correct equipment part numbers and quantities are found in the
packages that arrived.
General
This chapter provides Ceragon's recommended Acceptance and Commissioning Procedure for FibeAir
RFU-C. Acceptance and commissioning should be performed after initial setup is complete.
The purpose of this procedure is to verify correct installation and operation of the installed link and the
interoperability with customer end equipment.
The Site Acceptance Procedure is a checklist that summarizes the installation requirements of the site at
which the products were installed.
The commissioning tests cover the required configuration information that should be recorded, and the tests
that should be performed on the radio link in 1+0, 1+1 and 2+0 configurations.
Note: RFU-C works together with two types of indoor units. For SDH/SONET, the RFU works with the
FibeAir 1500R indoor unit. For Ethernet, RFU-C works with the FibeAir IP-10 indoor unit.
1. SITE INFORMATION
Customer:
Radio model:
Site name:
Site code:
Radio link code:
Site address:
2. ANTENNA MOUNTING
8. IN-DOOR UNIT
IDU is securely mounted to the rack OK
IDU is located in a properly ventilated environment OK
IDU fans are functional and air flow to the fans is not
OK
disrupted
IDU and rack are grounded as per site specifications OK
Traffic cables and connections are properly terminated as
OK
per manufacturer/cable instructions
All cabling is secured, tidy, and visibly labeled OK
1. Antenna Mounting
Mounting pole is of sufficient height to clear local obstructions, such as parapets, window cleaning
gantries, and lift housings.
Mounting Pole is of sufficient height, and is safely positioned, so as not to cause a safety hazard. No
person should be able to walk in front of, or look directly into the path of the microwave radio beam.
Where possible, the pole should be away from the edge of the building.
Mounting pole is secure and perpendicular. A pole that is not perpendicular may cause problems
during antenna alignment.
Mounting pole is grounded as per site specifications. All operators and site owners have specific
requirements regarding the grounding of installations. As a minimum, typical requirements are such
that any metal structure must be connected to the existing lightning protection ground of the building.
Where it extends beyond the 45 degree cone of protection of existing lightning conductors, additional
lightning protectors should be installed.
Antenna is grounded as per site specifications. See the third point in the Antenna Mounting section
above.
Antenna sway braces are fitted and installed correctly, where applicable. Typically, for an antenna of
1.2 m or larger, an extra sway brace is fitted to the mounting frame of the antenna. This sway brace
should not be mounted to the same pole as the antenna, but should be installed directly back to the
tower or an alternative point.
Antenna Water Drain Plugs are fitted and removed, where appropriate. Some antennas have moisture
drain plugs installed at various points around the antenna. The purpose of these plugs is to allow any
moisture that forms on the inside of the antenna or radome to drip out and prevent a pool within the
antenna. Only the plugs at the bottom of the antenna, after installation, should be removed. All other
plugs should be left in position.
The RFU is grounded as per installation instructions. See the third point in the Antenna Mounting
section above.
The RFU polarization is as per link requirements and matches the polarization of the antenna.
4. Indoor Unit
The main traffic connections are correctly terminated and crimped as per cable and connector
manufacturer instructions. All fiber optic patch leads should be routed carefully and efficiently, using
conduits to prevent damage to the cables.
All other user terminations are secure and correctly terminated.
All labeling is complete as per site requirements. Labeling is specific to each customer. At a site with
only one installation, labeling may be unnecessary. However, at sites with multiple installations,
correct and adequate labeling is essential for future maintenance operations.
Typical labeling requirements include:
Antenna labels - for link identity and bearing
RFU labels - for link identity, frequency, and polarization
Coax cable labels - for link identity, close to the RFU, IDU, and either end of any joint
IDU labels - for link identity
Commissioning Test
The following tests should be performed on each installed link.
Link Verification
“Radio” LED on the IDM front panel is green, indicating the radio link is up.
Received Signal Level (RSL) is up to +/- 4 dB from the expected (calculated) level at both ends of the
link.
Radio Bit Error Rate (BER) is 10E-11 or higher.
If working with ATPC, ATPC is operating as expected (RSL = reference level).
After connecting test equipment or end equipment to the line interfaces, all LEDs on the front panel of
the IDM are green.
155 Mbps Interface - connect SDH/SONET/ATM test equipment to the 155 Mbps interface
and verify error-free operation for at least 1 hour. Use a physical or software loop at the far
end.
FE/GbE Interface - connect a Packet Analyzer to the Fast Ethernet interface and verify error-
free operation (no packet loss) for at least 1 hour. Use a physical loop at the far end.
2 Mbps/1.5 Mbps - connect PDH test equipment to the E1/T1 interface and verify error-free
operation for at least 1 hour. Use a physical or software loop at the far end.
Interoperability Verification
Connect customer end equipment to the line interfaces, and verify correct operation.
Further interoperability tests should be performed in accordance with the specific requirements of the
connected end equipment.
Install CeraView element manager software on the PC, and launch the program.
Verify that you can manage the link and that you are able to perform changes to the link configuration
(frequency channel, Tx power, system name, time & date, etc.) via CeraView.
Verify that CeraView reports the correct parameters when performing the above.
Verify that there are no active alarms on the link.
If the management station is located at a remote site (Network Operation Center), verify that the
management station can manage the link and receive traps.
Loopback Operation
Perform line loopback, IDU loopback, RFU loopback, and Remote loopback, and verify that the
system operates accordingly.
Commissioning Tests
The following tests should be performed on each installed link.
Link Verification
The following steps should be repeated for each of the four RFU combinations (Primary-Primary, Primary-
Secondary, Secondary-Primary, Secondary-Secondary).
“Radio” LED on the IDM front panel is green, indicating the radio link is up.
Received Signal Level (RSL) is up to +/- 4 dB from the expected (calculated) level at both ends of the
link.
After connecting test equipment or end equipment to the line interfaces, all LEDs on the front panel of
the IDM are green.
155 Mbps interface - connect SDH/SONET/ATM test equipment to the 155 Mbps interfaces
using splitters, and verify error-free operation for at least 1 hour. Use physical loop between
the splitters at the far end.
FE, GbE interface - connect a Packet Analyzer to the Fast Ethernet interfaces using an FE
splitter, and verify error-free operation (no packet loss) for at least 1 hour. Use a physical loop
at the far end.
2 Mbps/1.5 Mbps - connect PDH test equipment to the E1/T1 interfaces using splitters, and
verify error-free operation for at least 1 hour. Use a physical loop between the splitters at the
far end.
Define each of the N channels as preferred (one at a time) for errorless switching to the +1 channel. The
regular channel supports hitless switching to the +1 channel.
Connect SDH/SONET/ATM test equipment to the 155 Mbps interfaces using splitters. Use physical
loop between the splitters at the far end. Verify that there are no alarms.
Perform the following switching tests from one IDM to the other, and verify the system switches
automatically.
- Power: power off the active IDM
- Radio: disconnect the coax cable of the active IDM
- Line: disconnect the 155 Mbps line input of the active IDM
- Management: force a switch using CeraView
For diversity configurations, verify that each receiver is receiving its own signal, and then mute the
active RFU. Verify that the receiver at the far end still receives from the diversity path. Verify that
there are no errors in the test equipment.
Connect a Packet Analyzer to the Fast Ethernet interfaces using splitters. Use a physical loop between
the splitters at the far end. Verify no alarms exist.
Perform the following switching tests from one IDM to the other, and verify the system switches
automatically.
- Power: power off the active IDM
- Radio: disconnect the coax cable of the active IDM
- Management: force a switch using CeraView
Connect PDH test equipment to the interfaces using splitters. Use a physical loop between the splitters
at the far end. Verify no alarms exist.
Perform the following switching tests from one IDM to the other, and verify the system switches
automatically.
- Power: power off the active IDM
- Radio: disconnect the coax cable of the active IDM
- Management: force a switch using CeraView
Interoperability Verification
Connect the customer end equipment to the line interfaces and verify correct operation.
Further interoperability tests should be performed in accordance with the specific requirements of the
connected end equipment.
Install CeraView element manager software on the PC and launch the program.
Verify that you can manage the link and that you are able to perform changes to the link configuration
(frequency channel, Tx power, system name, time & date, etc.) via CeraView.
Verify that CeraView reports the correct parameters when performing the above.
If the management station is located a t a remote site (Network Operation Center), verify that the
management station can manage the link and receive traps.
The purpose of the commissioning tests is to verify correct and proper operation of the product.
Important! Since operation of the XPIC system depends on correct installation, make sure the guidelines for
XPIC system installation provided below are followed correctly.
1. Install the dual polarization antenna and point it in the direction of the other site.
2. Install the two RFUs on a dual polarization antenna using the appropriate mounting kit, and mark the
RFUs with V and H respectively.
1. Install two cables between the RFUs and the drawers (IDMs). Note that cable length difference should
not exceed 10 meters.
2. Mark the cables with V and H respectively, and make sure V is connected to the right drawer and H is
connected to the left drawer.
Antenna Alignment
1. Power up drawer V on both ends of the link and configure it to the desired frequency channel and
maximum power.
2. Align the antennas, one at a time, until expected RSL is achieved. Make sure the achieved RSL is no
more than +/-4 dB from the expected level.
Polarization Alignment
Polarization alignment is required to verify that the antenna feeds are adjusted, to ensure that the antenna
XPD (Cross Polarization Discrimination) is achieved.
where:
5. If XPI is less than 25 dB, adjust the feed polarization by opening the polarization screw and gently
rotating the feed to minimize the RSLXPOL.
Note that polarization alignment is not always possible since the RSLXPOL may fall below the
sensitivity threshold of the RFU.
It is also recommended to try to maximize the XPI as much as possible, by aligning the polarization.
Before operating in XPIC configuration, each of the links (V and H) should be commissioned individually in
order to verify its proper operation.
1 Power up only drawer V at both ends and verify its frequency channel and Tx power configuration.
2 Verify that the RSL is no more than +/-4 dB from the expected level.
3 Run BER stability test on the link for at least 15 minutes to ensure error-free operation.
4 Power up only drawer H at both ends and verify its frequency channel and Tx power configuration.
5 Verify that the RSL is no more than +/-4 dB from the expected level.
6 Run BER stability test on the link for at least 15 minutes to ensure error-free operation.
1 Using the XPIC cable, connect the two RFUs at each end to the TNC connectors. Make sure
the cable is no longer than 3 meters.
2 Configure the drawers to work in XPIC mode.
3 Verify that the RSL at all four RFUs is no more than +/-4 dB from the expected level.
4 Verify that no alarms exist (if a 155 Mbps line is connected).
5 Run BER stability test on each of the 155 Mbps links for at least 1 hour to ensure error-free
operation.
Note: In a 2+2 configuration, repeat each step above for each of the four coupled RFU combinations.
1 Disconnect the IDU-RFU cable for each of the drawers (one at a time), and verify that the other
link is operating.
2 Disconnect the XPIC cable and check that the relevant alarms are generated.
3 Power down each of the drawers and verify that the other link is operating.
4 Swap the V and H cables and check that the relevant alarm is generated.
5 Mute and then un-mute one RFU at a time and verify that the other link is operating.
Note: In a 2+2 configuration, repeat each step above for each of the four coupled RFUs connected to the two
standby IDUs.
2+2 Verification
Perform the tests specified in Switching Tests in the 1+1 Commissioning Procedure section earlier in this
guide.
In this case, the switch will be from a main IDU connected to the main V and main H RFUs, to the
secondary IDU connected to the coupled V and coupled H RFUs.
The Commissioning Log gathers all relevant information regarding the installed link and contains a checklist
of all recommended commissioning tests.
Maintaining the Commissioning Log is important for tracking your installations, and to provide essential
data for Ceragon Networks.
Upon completing the Commissioning Log, send the log to Ceragon support center at support@ceragon.com.
1. GENERAL INFORMATION
Customer:
Radio model:
Configuration:
Radio link code:
Site 1 name & add:
Site 2 name & add:
IDC model:
Wayside channel:
IDC p/n:
IDC s/n:
SW IDC:
Drawer model
Main channel
Drawer p/n
Drawer s/n
Modem s/n
FW Mux:
FW Modem:
Cfg Modem:
RFU model:
RFU p/n:
RFU Main s/n:
SW RFU:
Tx frequency (MHz):
Rx frequency (MHz):
Link ID:
Tx power (dBm):
ATPC on/off:
ATPC ref level:
RFU polarization:
Site 1 Drawers Site 2 Drawers
4. ANTENNA
Right / Left Right / Left
Antenna model:
Antenna size:
Manufacturer:
Mounting type:
Mounting losses:
Site 1 Drawers Site 2 Drawers
5. LINK PARAMETERS Right / Left Right / Left
Link distance:
Rain zone:
Expected RSL (dBm):
Expected Diversity RSL (dBm):
RSL Main (dBm):
RSL Diversity (dBm):
Deviation from exp?
RSL ≤4 dB?
Front panel LEDs: All green All green All green All green
Line loopback: Pass Pass Pass Pass
IDU loopback: Pass Pass Pass Pass
RFU loopback: Pass Pass Pass Pass
Radio BER: Pass Pass Pass Pass
STM-1 test: Pass Pass Pass Pass
Fast Ethernet test: Pass Pass Pass Pass
8 x E1/T1 test: Pass Pass Pass Pass
E3/DS3 test: Pass Pass Pass Pass
Wayside E1 test: Pass Pass Pass Pass
Wayside Eth test: Pass Pass Pass Pass
XPIC test: Pass Pass Pass Pass
Switching test: Pass Pass Pass Pass
All RFU-Cs (6-38 GHz) support 7-56 MHz bands (for capacities of from 10 to 500 Mbps).
The following table lists the frequency bands, sub-bands, and duplex spacing supported by RFU-C.
For a detailed list of the low frequency channels, see the appendix at the end of this document.
TR Tx Low Tx High
Frequency Channel
Spacing/Block MHz MHz
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 5955.00 1 6195.00
2 5995.00 2 6235.00
3 6035.00 3 6275.00
240
4 6075.00 4 6315.00
5 6115.00 5 6355.00
6 6155.00 6 6395.00
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 5945.20 1 6197.24
2 5974.85 2 6226.89
3 6004.50 3 6256.54
4 6034.15 4 6286.19
252.04
5 6063.80 5 6315.84
6 6093.45 6 6345.49
7 6123.10 7 6375.14
8 6152.75 8 6404.79
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 5935.32 1 6187.36
2 5945.2 2 6197.24
3 5955.08 3 6207.12
4 5964.97 4 6217.01
5 5974.85 5 6226.89
6 5984.73 6 6236.77
7 5994.62 7 6246.66
8 6004.5 8 6256.54
9 6014.38 9 6266.42
10 6024.27 10 6276.31
11 6034.15 11 6286.19
12 6044.03 12 6296.07
252.04
13 6053.92 13 6305.96
14 6063.8 14 6315.84
15 6073.68 15 6325.72
16 6083.57 16 6335.61
17 6093.45 17 6345.49
18 6103.33 18 6355.37
19 6113.22 19 6365.26
20 6123.1 20 6375.14
21 6132.98 21 6385.02
22 6142.87 22 6394.91
23 6152.75 23 6404.79
24 6162.63 24 6414.67
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 5955.00 1 6215.00
2 6015.00 2 6275.00
260
3 6075.00 3 6335.00
4 6135.00 4 6395.00
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 5941.00 1 6207.00
2 5969.00 2 6235.00
3 5997.00 3 6263.00
4 6025.00 4 6291.00
266
5 6053.00 5 6319.00
6 6081.00 6 6347.00
7 6109.00 7 6375.00
8 6137.00 8 6403.00
ITU-R F.384-7
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 6460.00 1 6800.00
2 6500.00 2 6840.00
3 6540.00 3 6880.00
4 6580.00 4 6920.00
340
5 6620.00 5 6960.00
6 6660.00 6 7000.00
7 6700.00 7 7040.00
8 6740.00 8 7080.00
FCC 101.147(k7)
Center Center
T/R n
Frequency n (H) Frequency
Separation (L)
MHz MHz
1 6545 1 6715
170 2 6555 2 6725
3 6565 3 6735
4 6585 4 6745
5 6595 1 6755
6 6605 2 6765
7 6615 3 6775
8 6625 4 6785
9 6635 5 6795
160 10 6645 6 6805
11 6655 7 6815
12 6665 8 6825
13 6675 9 6835
14 6685 10 6845
15 6695 11 6855
16 6705 12 6865
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7442 1 7596
2 7470 2 7624
154A 3 7498 3 7652
4 7526 4 7680
5 7554 5 7708
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7456 1 7610
2 7484 2 7638
154B 3 7512 3 7666
4 7540 4 7694
5 7568 5 7722
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7138.5 1 7299.5
2 7226 2 7387
161
3 7428 3 7589
4 7526 4 7687
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7442 1 7687
2 7470 2 7715
3 7498 3 7743
4 7526 4 7771
245
5 7554 5 7799
6 7582 6 7827
7 7610 7 7855
8 7638 8 7883
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7138.5 1 7299.5
2 7166.5 2 7327.5
3 7194.5 3 7355.5
4 7222.5 4 7383.5
5 7250.5 5 7411.5
11 7145.5 11 7306.5
12 7173.5 12 7334.5
13 7201.5 13 7362.5
161A 14 7229.5 14 7390.5
21 7152.5 21 7313.5
22 7180.5 22 7341.5
23 7208.5 23 7369.5
24 7236.5 24 7397.5
31 7159.5 31 7320.5
32 7187.5 32 7348.5
33 7215.5 33 7376.5
34 7243.5 34 7404.5
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7263.5 1 7424.5
2 7291.5 2 7452.5
3 7319.5 3 7480.5
4 7347.5 4 7508.5
5 7375.5 5 7536.5
11 7270.5 11 7431.5
12 7298.5 12 7459.5
13 7326.5 13 7487.5
161B 14 7354.5 14 7515.5
21 7277.5 21 7438.5
22 7305.5 22 7466.5
23 7333.5 23 7494.5
24 7361.5 24 7522.5
31 7284.5 31 7445.5
32 7312.5 32 7473.5
33 7340.5 33 7501.5
34 7368.5 34 7529.5
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7438.5 1 7599.5
2 7466.5 2 7627.5
3 7494.5 3 7655.5
4 7522.5 4 7683.5
5 7550.5 5 7711.5
11 7445.5 11 7606.5
12 7473.5 12 7634.5
13 7501.5 13 7662.5
161C 14 7529.5 14 7690.5
21 7452.5 21 7613.5
22 7480.5 22 7641.5
23 7508.5 23 7669.5
24 7536.5 24 7697.5
31 7459.5 31 7620.5
32 7487.5 32 7648.5
33 7515.5 33 7676.5
34 7543.5 34 7704.5
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7563.5 1 7724.5
2 7591.5 2 7752.5
3 7619.5 3 7780.5
4 7647.5 4 7808.5
5 7675.5 5 7836.5
11 7570.5 11 7731.5
12 7598.5 12 7759.5
13 7626.5 13 7787.5
161D 14 7654.5 14 7815.5
21 7577.5 21 7738.5
22 7605.5 22 7766.5
23 7633.5 23 7794.5
24 7661.5 24 7822.5
31 7584.5 31 7745.5
32 7612.5 32 7773.5
33 7640.5 33 7801.5
34 7668.5 34 7829.5
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7435 1 7596
2 7463 2 7624
161I 3 7491 3 7652
4 7519 4 7680
5 7547 5 7708
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7428 1 7589
2 7456 2 7617
161J 3 7484 3 7645
4 7512 4 7673
5 7540 5 7701
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7498 1 7659
161K 2 7526 2 7687
3 7554 3 7715
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7457 1 7625
2 7485 2 7653
168B 3 7513 3 7681
4 7541 4 7709
5 7569 5 7737
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7428 1 7610
2 7456 2 7638
182 3 7484 3 7666
4 7512 4 7694
5 7540 5 7722
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7121 1 7317
2 7149 2 7345
196 3 7177 3 7373
4 7205 4 7401
5 7233 5 7429
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7442 1 7687
2 7470 2 7715
3 7498 3 7743
4 7526 4 7771
245
5 7554 5 7799
6 7582 6 7827
7 7610 7 7855
8 7638 8 7883
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7926 1 8192
2 7954 2 8220
3 7982 3 8248
4 8010 4 8276
266
5 8038 5 8304
6 8066 6 8332
7 8094 7 8360
8 8122 8 8388
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7747.70 1 8059.02
2 7777.35 2 8088.67
3 7807.00 3 8118.32
4 7836.65 4 8147.97
311.32A
5 7866.30 5 8177.62
6 7895.95 6 8207.27
7 7925.60 7 8236.92
8 7955.25 8 8266.57
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 7732.875 1 8044.195
2 7762.525 2 8073.845
3 7792.175 3 8103.495
4 7821.825 4 8133.145
311.32B
5 7851.475 5 8162.795
6 7881.125 6 8192.445
7 7910.775 7 8222.095
8 7940.425 8 8251.745
Center Center
T/R n n
Frequency Frequency
Separation (L) (H)
MHz MHz
1 8293 1 8412
2 8307 2 8426
3 8321 3 8440
119
4 8335 4 8454
5 8349 5 8468
6 8363 6 8482
IDU
Installation
Guide
Registered TradeMarks
Ceragon Networks® , FibeAir® and CeraView® are registered trademarks of Ceragon Networks
Ltd.
Other names mentioned in this publication are owned by their respective holders.
TradeMarks
CeraMapTM, ConfigAirTM, PolyViewTM, EncryptAirTM, CeraMonTM, EtherAirTM, and MicroWave
FiberTM, are trademarks of Ceragon Networks Ltd.
Other names mentioned in this publication are owned by their respective holders.
Statement of Conditions
The information contained in this document is subject to change without notice.
Ceragon Networks Ltd. shall not be liable for errors contained herein or for incidental or
consequential damage in connection with the furnishing, performance, or use of this document or
equipment supplied with it.
Information to User
Any changes or modifications of equipment not expressly approved by the manufacturer could
void the user’s authority to operate the equipment and the warranty for such equipment.
General.................................................................................................................. 1-1
Before turning on the equipment, make sure that the fiber optic
! cable is intact and is connected to the transmitter.
The use of optical devices with the equipment will increase eye
! hazard.
电子信息产品有毒有害物质申明
Electronic Information Products Declaration of Hazardous/Toxic Substances
危害物质
Hazardous Substance
成分名称
六价铬 多溴二苯醚
Component 铅 汞 镉 多溴联苯
Hexavalent Polybrominated
Lead Mercury Cadmium Chromium (Cr Polybrominated Diphenyl Ethers
(Pb) (Hg) (Cd) VI) Biphenyls (PBB) (PBDE)
单板 / 电路模块
Comply Comply Comply Comply Comply Comply
PCB/Circuit
Modules
结构件
Comply Comply Comply Comply Comply Comply
Mechanical Parts
电缆
Comply Comply Comply Comply Comply Comply
Cables
Précautions de sécurité
Vergewissern Sie sich vor dem Einschalten der Anlage, dass das faseroptische
! Kabel unbeschädigt und mit dem Sender verbunden ist.
Durch den Einsatz optischer Geräte zusammen mit der Anlage erhöht sich das
! Gesundheitsrisiko für die Augen.
Beachten Sie beim Arbeiten mit FibeAir IDU das folgende Stromschlag- und
! Gefahrenrisiko: Durch Abtrennen einer Stromquelle wird nur ein
Stromversorgungsmodul abgetrennt. Um die Einheit vollständig zu isolieren,
trennen Sie alle Stromversorgungen ab.
Site Requirements
Must be located indoors.
Available power source of -48 VDC, and the site must comply with National Electric Code (NEC)
standards.
In addition, since the IDU will be connected to the RFU, when considering a site, it is important to check for
current and future obstacles on the roof or tower. Possible future obstacles may include trees, new buildings,
window cleaners on the roof, snow that may accumulate in front of the antenna, etc. The site should be
accessible to certified personnel only.
Note about Heat Dissipation: The IP-10 IDU overall heat dissipation is 25W max (~85 BTU/h).
Note about Antenna Location: As with any type of construction, a local permit may be required before
installing an antenna. It is the owner’s responsibility to obtain any and all permits.
Pre-Installation
Packing
The equipment is packed at the factory, and sealed moisture-absorbing bags are inserted.
Transportation
y The equipment is prepared for public transportation. The cargo must be kept dry during transportation,
in accordance with ETS 300 019-1-2, Class 2.3.
y It is recommended to transport the equipment to the installation site in its original packing case.
y If intermediate storage is required, the packed equipment must be stored in dry and cool conditions and
out of direct sunlight, in accordance with ETS 300 019-1-1, Class 1.2.
Check the packing lists, and ensure that the correct part numbers and quantities of components arrived.
Unpack the contents and check for damaged or missing parts. If any part is damaged or missing, contact your
local distributor.
Installation Requirements
Required Tools
Philips screwdriver (for mounting the IDU to the rack and grounding screw)
Crimping tool for ground cable lug crimping (optional: if alternative grounding cable is used).
Cables
In addition to the tools mentioned above, the interface connectors and their pin-outs, can be found in the
following sections in this guide:
Restricted Access Area: DC powered equipment should only be installed in a Restricted Access Area.
Installation Codes: The equipment must be installed according to country national electrical codes. For
North America, equipment must be installed in accordance to the US National Electrical Code, Articles 110-
16, 110-17 and 110-18, and the Canadian Electrical Code, Section 12.
Overcurrent Protection: A readily accessible Listed branch circuit overcurrent protective device, rated 15 A,
must be incorporated in the building wiring.
CAUTION: This equipment is designed to permit connection between the earthed conductor of the DC
supply circuit and the earthing conductor at the equipment.
Grounded Supply System: The equipment shall be connected to a properly grounded supply system. All
equipment in the immediate vicinity shall be grounded the same way, and shall not be grounded elsewhere.
Local Supply System: The DC supply system is to be local, i.e. within the same premises as the equipment.
Disconnect Device: A disconnect device is not allowed in the grounded circuit between the DC supply source
and the frame/grounded circuit connection.
IP-10 follows in the tradition of Ceragon's Native2, which allows your network to benfit from both native
TDM and native Ethernet using the same radio. Flexible bandwidth sharing between the TDM and Ethernet
traffic ensures optimal throughput for all your media transfer needs.
IP-10 features a flexible design capable of addressing all network migration scenarios. With its Native2
capability for optimal traffic delivery, and modular architecture for all sites (Tail, Chain, Agg3, Agg2), this
state-of-the-art radio platform offers the best approach to IP migration for advanced networks.
With the widest capacity range (10-500 Mbps) for all capacity needs, advanced Adaptive Code Modulation for
the best spectrum utilization, and a scalable system that ensures future-proof network expansion, IP-10 is the
ideal solution for risk-free migration.
Some of the important points that place IP-10 at the top of the wireless IP market include:
Supports throughputs of from 10 to 500 Mbps per radio carrier (QPSK to 256 QAM)
In addition, using unique Adaptive Code & Modulation (ACM), your network benefits from non-stop,
dependable capacity deliverance.
The FibeAir IP-10 IDU is installed in a standard 19" ETSI rack as shown in the following illustration.
As shown in the illustration, four screws, supplied with the installation kit, are used to secure the IDU to the
rack.
Single
Point
Stud
Grounding
Wire
A grounding wire is connected below the IDU-RFU interface using a single screw with two washers.
• Connector and connection surfaces must be plated. Bare conductors must be be coated with antioxidant
before crimp connections are made to the screws.
• FibeAir provides a ground for each IDU, via a one-hole mounted lug onto a single-point stud. The stud
must be installed using a UL-listed ring tongue terminal, and two star washers for anti-rotation.
• The ampacity of the conductor connecting the IDU frame to the DC return conductor is equal to, or
greater than, the ampacity of the associated DC return conductor.
• Recommended: Availability of a UPS (Uninterrupted Power Source), battery backup, and emergency
power generator.
• Whether or not the power source provides constant power (i.e., power is secured on weekends or is shut
off frequently and consistently).
• The power supply must have grounding points on the AC and DC sides.
Caution!
The user power supply GND must be connected to the positive pole in the IDU power supply. Any other
connection may cause damage to the system!
Note: For a 1+1 system, a protection panel is used, as described in Appendix C - Protection Information.
Interface Descriptions
The following photo shows the different IDU ports and their functions.
Terminal console
Ethernet wayside
External alarms
Note: The Fast Ethernet interface channels can be logically configured for either Fast Ethernet traffic, or
protection, wayside, or management traffic.
Important! Make sure that the inner pin of the connector does not exceed the edge of the connector.
y For connectors or signals labeled TX, the signals are sent from FibeAir.
y For connectors or signals labeled RX, the signals are sent to FibeAir.
Wavelength: 850 nm
Receptacle: MSA compliant, SFP (Small Form Factor Pluggable Ports)
Connector: LC
Max Segment Length: 220 m (1351 ft), 500 m (1650 ft)
Cable Type: For Max Segment = 220 m: 62.5 µm MMF
For Max Segment = 500 m: 50 µm MMF
Wavelength: 1350 nm
Receptacle: MSA compliant, SFP (Small Form Factor Pluggable Ports)
Connector: LC
Max Segment Length: 550 m (1805 ft), 5000 m (16404 ft)
Cable Type: For Max Segment = 550 m: 62.5 µm MMF, 50 µm MMF
For Max Segment = 5000 m: 10 µm SMF
Connector: RJ-45
Max Segment Length: Up to 100 m (328 ft) per IEEE802.3
Cable Type: Compatible with shielded and unshielded twisted pair category 5 cables.
Optional 16xE1/T1
Connector MDR 69-pin
Used with: Twisted pair
Interface Type E1/T1
Number of ports 16 per unit (optional)
Timing mode: Retimed
Framing Unframed (full transparency)
Coding E1: HDB3
T1: AMI/B8ZS
Range: 5m
Line Impedance 120 Ω/100 Ω balanced. Optional module for 75 Ω unbalanced
Compatible Standards ITU-T G.703, G.736, G.775, G.823, G.824, G.828, ITU-T I.432, ETSI ETS 300
147, ETS 300 417, ANSI T1.105, T1.102-1993, T1.231, Bellcore GR-253-core,
TR-NWT-000499
10/100BaseT (Ethernet)
Protection
Out-of-Band Management
Asynchronous RS-232
Asynchronous V-11
General
This appendix provides pin-outs for FibeAir IDU connectors, including the following:
y Protection/Wayside/Management Connector
y Power Connector
y 16 x E1/T1 Connector
RELAY_1_N
7 Output Relay #1, normally open pin
O
RJ-45 Male
Connector Signal
Pin
1
Twisted Pair, Out - Tx
2
3
Twisted Pair, In - Rx
6
4
Not Connected
5
7
Not Connected
8
-48V (return 0V
current)
Note that right/left refers to viewing the panel from the front.
16 x E1/T1 Connector
The 16 x E1/T1 connector is a SCSI 68-pin connector.
Label on the
Pin # Signal Type
Twisted Pair
1 OUT - TIP1
Ch1 Tx TWISTED PAIR
35 OUT - RING1
2 OUT - TIP2
Ch2 Tx TWISTED PAIR
36 OUT - RING2
3 OUT - TIP3
Ch3 Tx TWISTED PAIR
37 OUT - RING3
4 OUT - TIP4
Ch4 Tx TWISTED PAIR
38 OUT - RING4
5 OUT - TIP5
Ch5 Tx TWISTED PAIR
39 OUT - RING5
6 OUT - TIP6
Ch6 Tx TWISTED PAIR
40 OUT - RING6
7 OUT - TIP7
Ch7 Tx TWISTED PAIR
41 OUT - RING7
8 OUT - TIP8
Ch8 Tx TWISTED PAIR
42 OUT - RING8
9 OUT - TIP9
Ch9 Tx TWISTED PAIR
43 OUT - RING9
10 OUT - TIP10
Ch10 Tx TWISTED PAIR
44 OUT - RING10
11 OUT - TIP11
Ch11 Tx TWISTED PAIR
45 OUT - RING11
12 OUT - TIP12
Ch12 Tx TWISTED PAIR
46 OUT - RING12
RJ-45
Female
Signal
Connector
Pin
1
Twisted Pair (Tx & Rx)
2
3
Twisted Pair (Tx & Rx)
6
4
Twisted Pair (Tx & Rx)
5
7
Twisted Pair (Tx & Rx)
8
RJ-45
Female
Signal
Connector
Pin
1
Twisted Pair, Out - Tx
2
3
Twisted Pair, In - Rx
6
4
Not Connected
5
7
Not Connected
8
Asynchronous Asynchronous
Pin I/O
RS-232 V11
1 NC UC_TXD_P Out
2 NC UC_TXD_N Out
3 NC NC NC
GND GND CO
4
Signal Ground Signal Ground M
UC_RS232_TXD
5 NC Out
Transmitted Data
UC_RS232_RXD
6 NC In
Received Data
7 NC UC_RXD_P In
8 NC UC_RXD_N In
General
This appendix provides information about the FibeAir IP-10 protection equipment.
As shown in the illustration above, the protection panel (in the middle) provides the ports used to link the two
IP-10 units for protection switching when a system fault occurs.
User
16xE1/T1 IDU #1 User FE
Open-Ended 4 x FE Open-Ended
IDU #1 MDR Connector Straight Cross RJ-45
16xE1/T1 RJ-45 Connector
MDR Connector Connectors
IDU #2
User
IDU #2 4 x FE
Optical GbE
16xE1/T1 Straight
LC/LC
MDR Connector RJ-45
Connector
Connectors
Part Numbers
The part numbers for the MDR cables are as follows:
Optical splitter used for GbE 1+1 systems (see the following section):
AO-0038-0
AO-0039-0
AO-0059-0
AO-0060-0
Optical
Splitter
Cables
Part Number Marketing Model Marketing Description
WA-0242-1 X-WSC-E1/T1 E1/T1 WSC x-ed cable
WA-0246 IDU-EXT-ALARMS-CBL-2.5m IDU External Alarms open cable 2.5m
WA-0259 CBL-16E1-CB-120-75 16E1 cable MDR/2xDB44 5m to CB-120-75
WA-0275 IDU-UC-CBL-2m User channel cable 2m D-type 9 pin male
WA-0276-0 IP10-CBL-16IO-PROT-0.6m IP-10 16 I/O port protection cable straight 0.6m
WA-0277-0 IP10-CBL-16IO-5M IP-10 16 I/O port cable open 5M
WA-0278-0 IP-10-CBL-16IO-10M IP-10 16 I/O port cable open 10M
WA-0284-0 IP10-CBL-16IO-XED-0.6m IP-10 16 I/O port crossed cable 0.6m
WA-0309-0 IP-10-CBL-16IO-25M IP-10 16 I/O port cable open 25M
Panels
Part Number Marketing Model Marketing Description
EN-0254-0 IP10-ETH-16E1-PROT-PANEL IP-10 Eth + 16E1 protection panel
EN-0256-0 IP10-ETH-16T1-PROT-PANEL IP-10 Eth + 16T1 protection panel
EN-0258-0 IP10-16E1-PROT-PANEL IP-10 16E1 protection panel
EN-0259-0 IP10-16T1-PROT-PANEL IP-10 16T1 protection panel
EN-0262-0 IP10-ETH-PROT-PANEL IP-10 Eth only protection panel
Optical Cables
Part Marketing
Marketing Model Item Description
Number Description
Pairs of Fiber Patchcord Single mode- LC/SC,
Duplex Optical
OP-SM-CBL-LC-SC- Length:15M, Duplex PVC 2mm cable, with LC
AO-0033-0 Cable LC-SC
DPLX 15M connector type on one end and SC connector on
SM 15M
the other end.
Pairs of Fiber Patchcord Single mode- LC/SC,
Duplex Optical
OP-SM-CBL-LC-SC- Length:3M, Duplex PVC 2mm cable, with LC
AO-0035-0 Cable LC-SC
DPLX 3M connector type on one end and SC connector on
SM 3M
the other end.
Duplex Optical
OP-SM-CBL-LC-SC- DUPLEX LC-SC (Tx TO Tx) SM 9/125 YELLOW
AO-0041-0 Cable LC-SC
DPLX 1M COLOR R-9D-1-P, 13MM, 1M
SM 1m
Duplex Optical DUPLEX FIBER OPTIC MM PATCH CORD
OP-MM-CBL-LC-
AO-0044-0 Cable LC-SC WITH LC/UPC-SC/UPC (Tx TO Tx) 62.5/125,
SC-DPLX 2M
MM 2M ORANGE COLOR, 2M, 3MM O.D.
Duplex Optical DUPLEX FIBER OPTIC MM PATCH CORD
OP-MM-CBL-LC-
AO-0045-0 Cable LC-SC WITH LC/UPC-SC/UPC (Tx TO Tx) 62.5/125,
SC-DPLX 10M
MM 10M ORANGE COLOR, 10M, 3MM O.D.
Duplex Optical DUPLEX FIBER OPTIC MM PATCH CORD
OP-MM-CBL-LC-
AO-0048-0 Cable LC-LC WITH LC/UPC-LC/UPC (Tx TO Tx) 62.5/125
LC-DPLX 0.5M
MM 0.5M ORANGE COLOR, 0.5M, 2MM O.D.
Duplex Optical
OP-SM-CBL-LC-SC- DUPLEX LC-SC (Tx TO Tx) SM 9/125 YELLOW
AO-0055-0 Cable LC-SC
DPLX 10M COLOR, 3MM, 10M
SM 10m
Optical Adaptors
Part Marketing
Marketing Model Item Description
Number Description
Adaptor
OP-SM-LC-LC-
AO-0042-0 Female/Female SM SIMPLEX LC-LC SM ADAPTOR
ADPT-SMPLX