Page 1 of 7
LARSEN & TOUBRO SAUDI ARABIA LLC
PROJECT TITLE:
1.0 SCOPE......................................................................................................................................................3
2.0 REFERENCES.........................................................................................................................................3
3.0 ABBREVIATIONS & DEFENITIONS.................................................................................................3
4.0 GENERAL & SAFETY REQUIREMENTS.........................................................................................3
5.0 RESPONSIBILITIES..............................................................................................................................4
5.1 PROJECT MANAGER...........................................................................................................................4
5.2 CONSTRUCTION MANAGER.............................................................................................................5
5.3 SITE ENGINEER....................................................................................................................................5
5.4 QUALITY IN-CHARGE.........................................................................................................................5
5.5 SAFETY IN-CHARGE............................................................................................................................6
6.0 TOOLS AND EQUIPMENTS.................................................................................................................6
7.0 WORK PROCEDURE............................................................................................................................6
8.0 INSPECTION...........................................................................................................................................9
9.0 RECORDS................................................................................................................................................9
10.0 ATTACHMENT..........................................................................................................................................9
1.0 SCOPE
This method statement covers work processes to be adopted for the site installation of conduits &
associated supports suitable for the site condition.
2.0 REFERENCES
Contract specifications
Page 2 of 7
LARSEN & TOUBRO SAUDI ARABIA LLC
PROJECT TITLE:
Risk Assessment shall be prepared including mitigation measures, and responsibility for
implementation. This shall be coordinated with site Safety In-charge and attach to this method
statement.
Before commencing any work, all permits shall be checked and ensured that they are valid until
completion of activity.
All works shall be referred to the IFC Drawings and specifications.
All materials shall be approved, sampled, tested, & accepted (as applicable) by client prior to
incorporation to the work.
All staff and workmen shall wear Personnel Protective Equipment (PPE).
Toolbox talks shall be conducted every day before commencement of work.
All personnel shall be cautioned while working near live lines and other services.
Prior to commencement of activities/works, the entire area shall be barricaded.
Adequate sign boards shall be kept to forewarn all.
Accumulated debris shall be cleared from the work site on daily basis.
FIRE 998
AMBULANCE 997
POLICE 999
PROJECT MANAGER X
Page 3 of 7
LARSEN & TOUBRO SAUDI ARABIA LLC
PROJECT TITLE:
NEAREST HOSPITAL X
5.0 RESPONSIBILITIES
Below mentioned personnel with the responsibilities entrusted to them shall be responsible for
carrying out below mentioned works. In addition to their roles and responsibilities disseminated in
the Project Quality & EHS Plans and the following specific activity functions shall be carried out:
Provide his team with appropriate resources to ensure that works are done in accordance with
the project Quality and EHS requirements and shall be responsible for the approval of method
statement and overall project management.
Directly reporting to the Project Manager, assisted by construction team as indicated in the
project organization chart.
Ensure that method statement is prepared, established & control measures taken before starting
the work and guiding the team for implementation.
Ensure that latest approved drawings are available at site prior to start of work.
Follow-up & coordinate with design engineering team for preparation and approval of drawings.
Conduct training and awareness program for all personnel deployed for the activity.
PROJECT TITLE:
Quality In-charge shall review the method statements and ensure all requirements are included.
Check & ensure availability of ITP / Checklists for the activity.
Schedule inspection of works in coordination with Site Engineer.
Prepare and maintain inspection logs, records, and obtain approval from client.
Inspect the measuring equipment for calibration.
Review Quality Control records and ensure correctness.
Disseminate EHS requirements specific to the activities involved and facilitate implementation.
Highlight the work specific Hazard / Aspect Identification & Risk / Impact Assessment.
Ensure that work is carried out in safe manner in coordination with Site Engineer, sub-
contractors, etc.
Screwdrivers.
Hammers
Spanners and wrenches.
Drilling Machine
Pliers.
Hacksaws.
Spanners
Files
Vice grip
Wrenches
7.0 PROCEDURES:
Conduit route is to be marked as per construction drawings
PROJECT TITLE:
Conduit Ends are provided with an insulated bushing to protect the wire from Abrasion,
unless the box fittings or enclosure design provides equivalent protection.
Bend of Rigid metal conduit shall be so made that the conduit will not be damaged and
that the internal diameter of the conduit will not be effectively reduced.
Liquid tight flexible conduit shall be installed at instrument side or as per required.
Damaged paint and surface treatment work of the conduits & supports etc. is to be
restored and checked to conform to specification.
Conduit work is to be properly identified as per layout drawings and as per specification.
All non-current carrying metallic parts are grounded as per National Electric Code (NEC)
Article 250
PRECAUTIONS
A. Existing Installations
No work in the immediate vicinity of, existing electrical installations shall be allowed
without a valid permit to work.
Work shall only be allowed under full time supervision by a competent supervisor & safety
officer.
Scaffolding
PROJECT TITLE:
If there is any doubt about the security of any anchorage, suspension points or ties for a
scaffold, e.g., strength of existing buildings/structures, or these under construction, the
Client’s representative shall be consulted before proceeding with erection.
All scaffolds shall be provided with suitable access and where ladders are used for this
purpose. They shall be of an adequate length and properly secured by lashing or fixing to
prevent displacement
8.0 INSPECTION
Quality In-charge shall prepare ITP identifying the inspection check points and submitted to
customer representative for review and acceptance prior to start of work.
Inspection with customer representative shall be carried out for all “Witness Points” and “Hold
Points” inspections identified in ITP.
An inspection request shall be submitted to client one day prior to scheduled date of inspection.
9.0 RECORDS