Analysis of difeciencies in steel pipe supports and proposal for rectification

Location shift Level (m)


Support compared to Proposal (After vertical re-
Status Original Actual Change of Height (m) Prposed Rectification / Change
No LS alignment of pipe)
(m)
A B A B A B A B
S1 0 15.963 NA 16.530 NA 0.567 NA Concrete top levels to be revised
S3 0 16.133 16.530 16.650 17.050 0.517 0.520 Concrete top levels to be revised
S4 0 18.440 18.843 18.981 19.292 0.541 0.449 Concrete top levels to be revised
S5 0 20.715 21.838 21.219 22.443 0.504 0.605 Concrete top levels to be revised
S6 0 26.276 27.060 26.824 27.606 0.548 0.546 Concrete top levels to be revised
S7 -0.358 31.552 32.553 31.944 32.940 0.392 0.387 Location to be shifted 358 mm upstream and concrete level to be revised
S8 Constructed -0.173 35.678 36.174 35.751 36.202 36.080 36.563 0.329 0.361 Steel column to match with saddle bottom level
S9 Constructed -0.773 39.234 39.731 39.274 39.756 39.399 39.881 0.125 0.125 Steel column to match with saddle bottom level
S10 Constructed -0.234 42.790 43.287 42.791 43.285 43.073 43.549 0.282 0.264 Steel column to match with saddle bottom level
S11 Constructed 0.303 46.346 46.842 46.411 46.859 46.737 47.217 0.326 0.358 Steel column to match with saddle bottom level
S12 Constructed -0.160 49.840 50.461 49.917 50.468 50.038 50.642 0.121 0.174 Steel column to match with saddle bottom level
S13 Constructed -0.628 53.458 53.954 53.500 53.955 53.468 53.940 -0.032 -0.015 Pipe saddle height to be adjusted to match the support level
S14 Constructed 0.000 56.876 57.975 56.924 57.981 56.871 58.043 -0.053 0.062 Pipe saddle height to be adjusted to match the support level
S15 Constructed -1.250 59.556 60.052 59.590 60.065 59.311 59.783 -0.279 -0.282 Hacking + conreting with chemical anchoring of r/f
S16 Constructed -0.220 62.345 62.733 62.390 62.722 62.311 62.733 -0.079 0.011 Pipe saddle height to be adjusted to match the support level