Mechanical Systems Commissioning Fundamentals PDF
Mechanical Systems Commissioning Fundamentals PDF
Commissioning
Fundamentals
Commissioning
• A/E Firm
• General Contractor
Design Review Owner Requirements
Cx Scope and Budget
Develop Cx Plan Draft
• Cx Team
Construction
Responsibilities
• Cx Scope of Work
• Cx Testing Protocols
• Cx Preliminary Schedule
• Cx Deliverables
Occupancy
Commissioning Process
Review Basis of Design (BOD)
Pre-Design Update Cx Plan
(Planning)
Develop Testing Protocols
Commissioning
DD and CD Design Review in
Meeting BOD, Maintainability,
Design and Constructability
Develop Cx Specifications
noting Contractor Cx
Responsibilities
Construction • Installation Verification
• Operational
Performance Testing
• Integrated System
Occupancy Testing
• Training
Commissioning Process
Submittal Reviews
Pre-Design Cx Coordination Kick Off
(Planning) Meeting
Commissioning
Regular Construction Cx
Meetings
Design Installation Verification
Observations (FIV)
Operational Testing
Observations (OPT)
Construction
Integrated Testing
Observations (FPT)
Cx Issue Log
Occupancy Training Scheduling
Commissioning Report
Commissioning Process
Pre-Design
(Planning)
Commissioning
Design
EVERYONE ASSOCIATED
WITH THE PROJECT
Who Should Be A Commissioning
Team Member?
• Design Engineers
• Design Architect
• General Contractor
• Mechanical Contractor(s)
• Electrical Contractor
• TAB Contractor
• Commissioning Agent
• Owner Groups (User, PM, Maintenance)
What needs to be inspected during
Installation Verification?