‘COGENERATION INTERCONNECTION AT
& ‘ABQAIQ PLANTS a
ee
EMERSON. FAT COMPLETION CERTIFICATE
Process Management
Factory Aeceplance Test
@ / lj li EG, li, Ly le
Saudi Aramco Agrees that Emerson has completed the Factory
Acceptance Test to client's satisfaction.
Dehn Persson | Hiss en sr vd hafla
(thEL NV. Adywi
Hadi Al abatert jobber
Aleut Ad rove? |
Sattgh Dighe
Mont Jas
Mid ete
All Expectations and Deviation have been clarified as listed below:
7
|2atAp co.
| Stane aao Cry) | maZrd aLPashes|
‘AQ- Paget off‘COGENERATION INTERCONNECTION AT FAT COMPLETION REPORT
AABOAIQ PLANTS
Bitoor82
SS CT
Catone Tae. Confers Proje toger yesion ALAM Har
(tome Reteence Shaca tad ranear When a, auwats
Emcunorer SHSt Reais | Sptomtrge: Mab se me
EnCana Reece || SoMn’ Garston
Goold fyinw Headed Soh ehocha
“This System Acceptance Cartcat i ppb tthe Dei OCS System ony
‘The enact scope fer deta bow
Te ore Aecopance cover teehee tan 7
Raniviare FAT
‘Ste Acceptance Test
a
1 Str Vacation tote
5 pee
Emerson PSS has deans fat te Dla DCS sysom uncon my accordance wih he Cuma upped
Inermatonprodaedin the conact
‘ter soning ths Syn Acoepance Caries, the ounrais and cant of he astm anette Cat?
Enducer
[copied witout comments
ed wih commer (se tached ropa) Reta NOT requires
‘Accepted th commas abe atsched pon) Retest requred ards scheduled fr
"est Results
etcienay Report if appicatie)
A ag Cael SNE 1 Chan ee
sg aed NEB ask aay
Pat Ber RVs f ie |
ae Sone Pens, fe
Fecten eos =
MASES ae
ere
reer: Proyect Manager A Jon 2016
Me Wasteta Al Rudin Heemw—— A
ee ou
Lead Lngtneee cle z or le ee |
WAEL pn. Ado |
Cl,
EMERSON.
AO-1 oft Process Management |