You are on page 1of 22

Asset Integrity Management – a risk based approach

Turning Policy into operational practice

5th February 2014


Pipeline Integrity Management Forum 2014

Roy van Elteren


Head of Section Gas Infrastructure & Transport

DNV GL Oil & Gas

DNV GL © 2013 SAFER, SMARTER, GREENER


Outline

Introduction to DNV GL Oil & Gas;


Asset Management Policy
Operational practice
– threat Identification
– Risk prioritization
– Inspection planning
– Respond & process improvement
Questions

DNV GL © 2013

2
DNV GL Group

DNV GL © 2013

3
DNVGL: A new company with 150 years of experience

DNV and GL Noble Denton joined forces in September 2013. We’ve drawn
upon our proud heritages to create:

Greater technical expertise


Enhanced innovation capabilities
Extended global reach
An integrated service portfolio

4 DNV GL © 2013
An integrated approach across the asset lifecycle
Our common way of working and global sales model delivers industry
best practice across the asset lifecycle. Core service areas include:

Risk management advisory Technical assurance


Technical advisory Certification and verification

Noble Denton marine assurance & Inspection and quality assurance


advisory Offshore classification

5 DNV GL © 2013
Serving the diverse needs of the entire oil & gas value chain

Exploration & Transport & Delivery &


Production Distribution Use

Enabling Operational Excellence

Verification & Certification Services

Technology Innovation Services

Energy Business Decision Support

DNV GL © 2013
Asset Management Policy

DNV GL © 2013

7
Asset Management Policy

Challenges for Asset owners/pipeline Operators;


– Prolong lifetime of Assets in operation
– Public awareness
– Pressure from authorities
– Accidents v.s near misses
– Accommodate Renewables & Unconventionals?
– Compliance to new standards and regulation

Operators are in the spotlight: “Show me you are in control”.


Creating an “umbrella” for all the (inter)national- and company standards
– Example; PAS55/ISO55000

DNV GL © 2013

8
PAS55/ISO55000 overview

PAS55 : 2004
Physical Infrastructure Assets

The IAM Tool

PAS55 : 2008
Physical Assets

ISO55000 : 2014
Assets

DNV GL © 2013

9
PAS 55 Improvements with ISO 55000

Worldwide recognition in comparison to U.K. PC 251 Structure


based PAS55

Structure of Asset Management is better


acknowledging what large companies do and
want (ownership; asset management; service
provider)

It puts emphasis on involvement of top ISO


9001
management and leadership quality

ISO ISO
Includes finance and accounting requirements 27000 ISO 14001
inform. 550000 environ
security ment

Risk based decision has a prominent place in the


ISO
overall asset management system 31000
risk

DNV GL © 2013

10
Structured approach

Links to roles in the organization

Performance indicators
Asset Owner Business Assetperformance
• Business Management
Strategy • Asset performance
Policy
• Benchmarking

DecisionStrategic
support data
Asset Asset Strategy • Probability, impact, risk
Manager Asset
• Cost data Management
Plan
• Scenario’s, alternatives
Asset Lifecycle Management

High quality asset data


Service Operational areas
Asset
• Fixed assetManagement
data
• Condition / health
Provider • AssessmentPlans
knowledge

DNV GL © 2013

11
Practical build up: from asset details to company criticality

Networks
Netwerk
configuration
Criticality
Facilities /
Pipelines
Station
Failure modes
configuration
Components

Asset Health
Parts
Maintenance/
Performance
Data

DNV GL © 2013
12
PAS55/ISO55000 in practice

Benchmark of company procedures vs standards


Establishing Asset Register

Asset Condition Assessment


Threat Identification
Risk prioritization

Selection of Inspection methods


Maintenance planning/re-inspection

Constructing Asset Management plans


Risk evaluation cycle
Integrity Management Systems software support

DNV GL © 2013

13
Asset Integrity in Operation

DNV GL © 2013

14
Risk based Asset Integrity in Operation

• Continuous improvement Identify • Threats


• Efficient processes • Failure Mechanisms

Improve Prioritize

• Quality Management • Risk Assessment


• Integration of Data • Prioritize risks

Plan &
Respond
Select

• Plan Inspections
• Appropriate Methods

15
DNV GL © 2013
Identify

Identify threats Improve Prioritize

All threats to pipeline/asset integrity shall be considered


Consider future changes in operating conditions that Respond
Plan &
Select
may introduce new degradation mechanisms
(e.g. pressure fluctuations, gas quality)
Guidance given by for example ASME B31.8S “Managing System
Integrity of Gas Pipelines”:
– Time-dependent (e.g. external corrosion, internal corrosion, stress corrosion
cracking)
– Stable (e.g. manufacturing, welding, equipment related defects)
– Time-independent (e.g. third party damage, incorrect operational procedure,
weather related and outside force)

DNV GL © 2013

16
Identify

Inspection planning and selection Improve Prioritize

Inspection methods can be divided mainly into inline


inspection (ILI) methods and aboveground surveys to be Respond
Plan &
Select
used in assessment methodologies.

About 40% of the gas pipelines worldwide cannot be


inspected inline.

Assessment methods:
– External Corrosion Direct Assessment (ECDA)
– Dry Gas Internal Corrosion Direct Assessment (DG-ICDA)
– New developments in ILI technology

Combining inspection results to increase accuracy of


defect growth prediction-> leading to effective
re-inspection
DNV GL © 2013

17
Identify

Prioritize; risks Improve Prioritize

Scope: Rank pipelines based on probability of Respond


Plan &
Select
failure and failure mode for external corrosion

Build a failure model to determine the failure frequency of a defect


based on the:
– leak vs. rupture (ASME B31G)
– Time to fail for a single defect
– Failure frequency of a defect (Monte Carlo simulation)
– Based on data from ILI-runs, the ECDA program, PIMS, international
databases and from expert judgment

Leading to a ranking tool to prioritize inspections based on risk:


– Incorporate consequence factors (e.g. population density, environmental
damage, security of supply etc.)
DNV GL © 2013

18
Identify

Respond; Inspect and repair


Improve Prioritize

External Plan &


Respond
corrosion Select

(MIC)

DNV GL © 2013
Identify

Process Improvement; (P)IMS Improve Prioritize

Scope: Development and Implementation of


Plan &
Respond
a (Pipeline) Integrity Management System Select

Our contributions: “Getting a company ready to use PIM software”


– Asset Management Policy development (Gap)
– Implementing company procedures
– Training company experts
– Functional specification customer requirements
– Integrity Management support (Risk, inspection)

Supported by a unique Software package

Data Quality & data management is key!


First get Asset Integrity procedures in place.

DNV GL © 2013
DNV GL © 2013
Thank you for your attention!

www.dnvgl.com

SAFER, SMARTER, GREENER

22 DNV GL © 2013

You might also like