MINISTRY OF FOOD PROCESSING INDUSTRIES

GUAIDELINES FOR CALCULATION OF GRANT

• Important parameters for


scrutinization of the proposal
• Ineligible proposals.
• Eligibility of Plant & Machineries

• DAIRY PROCESSING • Eligibility of Technical Civil Work.

• MEAT & POULTRY PROCESSING

• CONSUMER PRODUCTS PROCESSING

• OIL MILLING
Main Page
THE PROPOSALS HAVE TO BE SCRUTINIZED ON
FOLLOWING PARAMETERS

„ FOR DAIRY CLICK HERE

„ FOR MEAT & POULTRY CLICK HERE

„ FOR CONSUMER PRODUCTS CLICK HERE

„ FOR OIL MILLING CLICK HERE


Main Page

THE PROPOSALS OF MILK PROCESSING

THE PROPOSAL HAVE TO BE SCRUTINISED ON FOLLOWING


IMPORTANT PARAMETERS –
1.CAPACITY OF THE PLANT (Processing capacity LPD)
2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BE
INSTALLED
3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THE
MILK PRODUCTS PROPOSED TO MANUFACTURE.
5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSED
PROJECT.
6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FOR
MARKETING OF PROCESSED PRODUCTS.

BACK
Main Page

THE PROPOSALS OF MEAT PROCESSING

THE PROPOSAL HAVE TO BE SCRUTINISED ON FOLLOWING


IMPORTANT PARAMETERS –
1.CAPACITY OF THE PLANT (Processing capacity MT/DAY)
2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BE
INSTALLED
3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THE
MEAT & MEAT PRODUCTS PROPOSED TO PROCESS.
5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSED
PROJECT. (Procurement of Raw meat must be from approved slaughter
houses)
6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FOR
MARKETING OF PROCESSED PRODUCTS.

BACK
Main Page

THE PROPOSALS OF CONSUMER PRODUCTS

THE PROPOSAL HAVE TO BE SCRUTINISED ON FOLLOWING


IMPORTANT PARAMETERS –
1.CAPACITY OF THE PLANT (Processing capacity MT/DAY OR No.
/day)
2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BE
INSTALLED
3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THE
CONSUMER PRODUCTS.
5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSED
PROJECT.
6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FOR
MARKETING OF CONSUMER PRODUCT.

BACK
Main Page

THE PROPOSALS OF OIL MILLING

THE PROPOSAL HAVE TO BE SCRUTINISED ON FOLLOWING


IMPORTANT PARAMETERS –
1.CAPACITY OF THE PLANT (Processing capacity MT/DAY)
2. CAPACITY OF PLANT & MACHINARY PROPOSED TO BE
INSTALLED
3. REQUIRMENT OF PLANT & MACHINARY IN RESPECT OF THE
OIL MILLING.
5. RAW MATERIAL AVAILABILITY IN THE AREA OF PROPOSED
PROJECT. (Procurement of Raw seeds must be from farmers/ Mandi)
6. DETAILS OF MARKETING ARRANGEMENTS PROPOSED FOR
MARKETING OF EADIBLE OIL.

BACK
Main Page

INELIGIBLE PROPOSALS

„ FOR DAIRY CLICK HERE

„ FOR MEAT & POULTRY CLICK HERE

„ FOR CONSUMER PRODUCTS CLICK HERE

„ FOR OIL MILLING CLICK HERE

BACK
Main Page

Ineligible proposals - DAIRY

„ Proposals for installation of Bulk Milk Coolers at various


milk collection points.
„ Proposals for pasteurization and packing of raw milk
alone. (Proposals of pasteurization of milk along with
value added products should be considered for grant in
aid)
„ Proposals for expansion/ modernization of the same unit
for which MFPI grant has already been availed for setting
up in the same location or activity.
„ Proposals who made application for grant in aid after
commencement of commercial production.
„ Proposals who have already availed grant in aid TWO
times including its sister concern from MFPI.
BACK
Main Page

Ineligible proposals - MEAT

„ Proposals for expansion/ modernization of the same unit


for which MFPI grant has already been availed for setting
up in the same location or activity.
„ Proposals who made application for grant in aid after
commencement of commercial production.
„ Proposals who have already availed grant in aid TWO
times including its sister concern from MFPI.
„ Proposals of Poultry farm, Goat farms , Proposals of
Retail meat selling counters etc.

BACK
Main Page

Ineligible proposals - CONSUMER

„ Proposals for Setting up/expansion/ modernization of


the unit for which MFPI grant has already been availed
for setting up in the same location or activity.
„ Proposals who made application for grant in aid after
commencement of commercial production.
„ Proposals who have already availed grant in aid TWO
times including its sister concern from MFPI.
„ IN CASE OF BHAGAR PROCESSING ONLY ONE GRANT IS
ELIGIBLE.

BACK
Main Page

Ineligible proposals – OIL MILLING

„ Proposals for Setting up/expansion/ modernization of


the unit for which MFPI grant has already been availed
for setting up in the same location or activity.
„ Proposals who made application for grant in aid after
commencement of commercial production.
„ Proposals who have already availed grant in aid ONE
times including its sister concern from MFPI.
„ Proposals for Vanaspati ghee (Vegetable ghee I.e. in
Solid form).

BACK
Main Page

ELIGIBILITY OF PLANT & MACHINARIES

„ FOR DAIRY CLICK HERE

„ FOR MEAT & POULTRY CLICK HERE

„ FOR CONSUMER PRODUCTS CLICK HERE

„ FOR OIL MILLING CLICK HERE

BACK
ELIGIBILITY OF PLANT & MACHINARIES IN MILK PROCESSING
UNITS.

„ Eligibility of P/M in milk processing project is to be worked


out on the basis of milk products proposed to be
manufactured.
For example – if company proposes to process Cream, Butter,
Ghee, Paneer etc. the list of plant & machineries must have
Cream separator, Butter churner, Multipurpose vat, Ghee
Boiler, Ghee Clarifier, Ghee settling tank, Coagulation vat,
Paneer press, Paneer hooves, packing M/c etc.
In case of Ice cream processing, continuous freezer must be
installed.
„ Ineligible Plant/Machineries – Computers, A/C, office
furniture,Close circuit cameras, Milk tankers, Milk cans,
Erection and commissioning charges,Transportation charges,
Technical consultancy fees, vehicles, fire equipments, fuels,
consumables, second hand/ old machines/ refurbished
machineries, Electrical fixtures not mounted on machines or
processing area etc.
BACK
ELIGIBILITY OF PLANT & MACHINARIES IN MEAT PROCESSING
UNITS.

„ Eligibility of P/M in meat & Meat processing project is to be


worked out on the basis of meat products proposed to be
manufactured.
For example – if company proposes to process Poultry meat
products etc. the list of plant & machineries must have
proper slaughter equipments, Freezing facility, Rendering
plant, ETP, packing M/c etc.
In case of raw meat/ beef processing, carcass splitting
equipments, fat trimming knives, meat mincer,
grinder,packing machine etc. must be installed.
„ Ineligible Plant/Machineries – Computers, A/C, office
furniture,Close circuit cameras, Transport vehicle , Erection
and commissioning charges,Transportation charges,
Technical consultancy fees, Refer Van, fire equipments, fuels,
consumables, second hand/ old machines/ refurbished
machineries, Electrical fixtures not mounted on machines or
processing area etc.
BACK
ELIGIBILITY OF PLANT & MACHINARIES IN CONSUMER
PRODUCTS.

„ Eligibility of P/M in Consumer products projects is to be


worked out on the basis of final products proposed to be
manufactured.
For example – if company proposes to process Bakery items like
Bread, Buns etc, the list of plant & machineries must have
Flour sifter, Dough Kneader, Dough Divider, Dough Rounder,
Moulding M/c, Conveyer, Oven, Slicer, Packaging M/c etc.
In case of Biscuits, machineries are same but their specifications
are different suitable for Biscuits. Oven is a critical Machine.

Ineligible Plant/Machineries – Computers, A/C, office


furniture,Close circuit cameras, Transport vehicle/ Delivery
Van , Erection and commissioning charges,Transportation
charges, Technical consultancy fees, fire equipments, fuels,
consumables, second hand/ old machines/ refurbished
machineries, Electrical fixtures not mounted on machines or
processing area etc.
BACK
ELIGIBILITY OF PLANT & MACHINARIES IN OIL MILLING UNITS.

„ Eligibility of P/M in oil milling projects is to be worked out on


the basis of Expeller, Solvant Extraction plant and Edible oil
refinery plant proposed to be Established.
For example – if company proposes to Establish Solvent
Extraction plant, the list of plant & machineries must have
Rotary seal, Dessolvantizer,Evaporators, Toaster, Meal
discharge rodler etc.

Ineligible Plant/Machineries – Computers, A/C, office


furniture,Close circuit cameras, Transport vehicle , Erection
and commissioning charges,Transportation charges,
Technical consultancy fees, fire equipments, fuels,
consumables, second hand/ old machines/ refurbished
machineries, Electrical fixtures not mounted on machines or
processing area etc.
BACK
Main Page

ELIGIBILITY OF TECHNICAL CIVIL WORK

„ FOR DAIRY CLICK HERE

„ FOR MEAT & POULTRY CLICK HERE

„ FOR CONSUMER PRODUCTS CLICK HERE

„ FOR OIL MILLING CLICK HERE

BACK
ELIGIBILITY OF TECHNICAL CIVIL WORK IN MILK PROCESSING
UNITS.

„ Eligible technical civil work will be the civil work meant


for operational requirements.

such as – Raw milk reception dock, Raw Milk processing


section, Value added products processing section,
Packing area, Cold storage, finished product store,
Dispatch dock,laboratory etc.

„ Ineligible civil work – Administrative office, staff


rooms, workers change rooms, Toilets, sanitation
rooms, Security/ guard room, compound walls,
approach roads etc.
BACK
ELIGIBILITY OF TECHNICAL CIVIL WORK IN MEAT PROCESSING
UNITS.

„ Eligible technical civil work will be the civil work meant


for operational requirements.

such as – Raw Meat reception dock, Meat processing


section, Value added products processing section,
cooking area, Packing area, Cold storage, blast freezer
room, finished product store, Dispatch dock,laboratory
etc.

„ Ineligible civil work – Administrative office, staff


rooms, workers change rooms, Toilets, sanitation
rooms, Security/ guard room, compound walls,
approach roads etc.
BACK
ELIGIBILITY OF TECHNICAL CIVIL WORK IN CONSUMER PRODUCTS.

„ Eligible technical civil work will be the civil work meant


for operational requirements.

such as – Processing hall, Raw/ Finished material


godowns, Packing area, laboratory , Cold rooms for
application of Cream in case of cream Biscuits etc.

„ Ineligible civil work – Administrative office, staff


rooms, workers change rooms, Toilets, sanitation
rooms, Security/ guard room, compound walls,
approach roads etc.

BACK
ELIGIBILITY OF TECHNICAL CIVIL WORK IN OIL MILLING
UNITS.

„ Eligible technical civil work will be the civil work meant


for operational requirements.

such as – Processing hall, Raw/ Finished material


godowns, Heaxane tanks, Packing area, laboratory , oil
storage tanks etc.

„ Ineligible civil work – Administrative office, staff


rooms, workers change rooms, Toilets, sanitation
rooms, Security/ guard room, compound walls,
approach roads etc.

BACK