You are on page 1of 20
Qui Related “o Ma sion Related @ Ma & Quatiey Control Implemen 2a central mbtng plat 25 than (1) Fifty (S0) seconds unless miner performance tect prove, concrete if « shoner time period, How many 2 added to th ca if timing reaches its maxinum raised positions 7 (1) 10 is (3) i seconds. ™ “Y, Ga the preparation of Base Course vsing lime Stabilization Method, if sluny ime c employed, whet is the typical siurry ratio 7 ()_1 Tonne line tod gum cf water (2) Lionne lime to 2 eum. of water (@) {tonne lime to 3 Ana Nat R ASPHALT AA. (Li Cutbsck Asphalt (2) Petreleum Asphalt (3) Emmilsified Asphalt ‘2 pitenmous residue of crude olf alfer fis lighter component have been oh aimospherio & vacuum distilletion The process vary 2 oil production method. 2. Petroicum Asphalis used in pavement construction shall bg homogenous, fice Siom water & shall not Totin when heated to (AIOE, (465°C PAs. . ee QUE TIONAIRE FOR MATERIALS ENG! NEER: Lis defined r2 Geminimom moisture content at waich the soll can be readily malded without breaking or crumbling, a. Liquid limi: e; Blastie limit b. Plasticity index dbotha&e a determining the Fidd Density Test we need to know de folowing: a.Fidd moisure content ¢.Laboratary compacéan b,Opdmum moistare content, d. All of che above Dividing the lord susizins by the spedinen at the suddes holt of the lord Indicatey pulueer by the nominal cross secdonal area ofthe specimen using ULM we obtain as Tensile Suength Aiea Bteength . Elongation a. Beading ating (xe ductile properties of ‘This testis one of the methods iu ev a. Tensile Srengilt 2, Yield Suengih , Elongation AL Bending Properties “This item ccnsist of preparing and treating am existing bituminoas or canoe qeashece surface with bitandaous materialsin accordance with the Plans and ‘Speciliesdous, preparotery to the construction of 2 bituminous sarfase course. ne Coat Ai Bituminows Teak Cost i Coat é. Bizmainous Surface Treatment a. Bituminees b, Bieminens Se This item shall eansist of 6! a Sughe appiicatien ef ‘bitsminaus material Fellowed bea single spreading of avgrezace(sughe surface ceamenQ in pecordange with the plans & spedications. ¢, Binmninous Tack Coat . Bituminous Seal Coat A Bitsminoss Surface Treatment Pagel 7, Dividing the inaxinwain load the specimen susteins during test by the nominal cross-sectional ares of the speciiea, A. Veasiie Strong ¢. Elongation b. Yield Strength 4, Beading §, Hupress the increase in lengtts of the gage Length as a percentage af the srignal gogeleagth. . Tensile Sireagth A. Bongation b, Yield So eng a, Bending 9, Whatis ther every sane yam testing requirement for steel hars (1) ene somplein a, 1,900 Bibbgr b. 2,000 kil c. 5,000 bilograms AZ 16,099 kilograms 16, Methad of ratucing fidd samples of aggregates to testing eize can he done byt a. Mechanical Splitter 2, Miniature Stockpile Samples b. Quartering f All of the above tis defined cs the lowest moisince content at which the seil will low upon the applicadon of'a very smal shearing force and gives n certain measure of the shearing resistence of a soil when mixed with water. / AR siyuid Lint ¢. Plasticity Indes i a, Shrinkage Limit s. Flasde Licsit ! responsibility in terins of motesials testing and Quality she implementation of project. riginesr gf Project Enginesr vt, Construction Engineer 4. District Engineer Poge2

You might also like