Qui
Related “o Ma
sion Related @ Ma & Quatiey Control Implemen
2a central mbtng plat
25 than (1) Fifty (S0) seconds
unless miner performance tect prove,
concrete if « shoner time period, How many
2 added to th ca if timing
reaches its maxinum raised positions 7 (1) 10
is (3) i seconds.
™
“Y, Ga the preparation of Base Course vsing lime Stabilization Method, if sluny
ime c employed, whet is the typical siurry ratio 7 ()_1 Tonne line tod
gum cf water (2) Lionne lime to 2 eum. of water (@) {tonne lime to 3
Ana Nat
R ASPHALT
AA. (Li Cutbsck Asphalt (2) Petreleum Asphalt (3) Emmilsified Asphalt
‘2 pitenmous residue of crude olf alfer fis lighter component have been
oh aimospherio & vacuum distilletion The process vary
2 oil production method.
2. Petroicum Asphalis used in pavement construction shall bg homogenous,
fice Siom water & shall not Totin when heated to (AIOE, (465°C
PAs. .ee
QUE TIONAIRE FOR MATERIALS ENG! NEER:
Lis defined r2 Geminimom moisture content at waich the soll can be
readily malded without breaking or crumbling,
a. Liquid limi: e; Blastie limit
b. Plasticity index dbotha&e
a determining the Fidd Density Test we need to know de folowing:
a.Fidd moisure content ¢.Laboratary compacéan
b,Opdmum moistare content, d. All of che above
Dividing the lord susizins by the spedinen at the suddes holt of the lord
Indicatey pulueer by the nominal cross secdonal area ofthe specimen using
ULM we obtain
as Tensile Suength Aiea Bteength
. Elongation a. Beading
ating (xe ductile properties of
‘This testis one of the methods iu ev
a. Tensile Srengilt 2, Yield Suengih
, Elongation AL Bending Properties
“This item ccnsist of preparing and treating am existing bituminoas or canoe
qeashece surface with bitandaous materialsin accordance with the Plans and
‘Speciliesdous, preparotery to the construction of 2 bituminous sarfase
course.
ne Coat Ai Bituminows Teak Cost
i Coat é. Bizmainous Surface Treatment
a. Bituminees
b, Bieminens Se
This item shall eansist of 6! a Sughe appiicatien ef ‘bitsminaus material
Fellowed bea single spreading of avgrezace(sughe surface ceamenQ in
pecordange with the plans & spedications.
¢, Binmninous Tack Coat
. Bituminous Seal Coat A Bitsminoss Surface Treatment
Pagel7, Dividing the inaxinwain load the specimen susteins during test by the nominal
cross-sectional ares of the speciiea,
A. Veasiie Strong ¢. Elongation
b. Yield Strength 4, Beading
§, Hupress the increase in lengtts of the gage Length as a percentage af the srignal
gogeleagth.
. Tensile Sireagth A. Bongation
b, Yield So eng a, Bending
9, Whatis ther
every sane
yam testing requirement for steel hars (1) ene somplein
a, 1,900 Bibbgr
b. 2,000 kil
c. 5,000 bilograms
AZ 16,099 kilograms
16, Methad of ratucing fidd samples of aggregates to testing eize can he done byt
a. Mechanical Splitter 2, Miniature Stockpile Samples
b. Quartering f All of the above
tis defined cs the lowest moisince content at which the seil will low upon the
applicadon of'a very smal shearing force and gives n certain measure of the
shearing resistence of a soil when mixed with water.
/
AR siyuid Lint ¢. Plasticity Indes
i a, Shrinkage Limit
s. Flasde Licsit
! responsibility in terins of motesials testing and Quality
she implementation of project.
riginesr gf Project Enginesr
vt, Construction Engineer 4. District Engineer
Poge2