You are on page 1of 4
GAS LIFT COMPRESSOR STATION cefehild@ct§ COMPRA ENERGY S.A. ENERGY | MATERIAL REQUISITION FOR | ISOMETRIC FABRICATION | | | | | | | | | 1 = — | | - — I | a | alae a ee liens RRA = bl mal 797 Ze: REV DATE DESCRIPTION prev. = ‘omc a == | WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER TOTAL OR PARTIAL REPRODUCTION AND OR UTILIZATION OF THIS COCUMENT ARE FORSIDOEN (let Contact No (037-NO176-11PG1 [ Contactor Jb Ne. -211/2011 Carat Dea 2A MRA01 Ae lent Document No E PT. ISTANA KARANG LAUT Page Number 1/4) COMPRA ENERGY S.A. ENERGY GAS LIFT COMPRESSOR STATION Se. Jouenrs CONTRACT Wo, oceve. 2ATL-MAR-A01 5 037-NO176-11PG1 le. A OO ens be aaa PT.ISTANA KARANG LAUT. Bacteni cd MATERIAL REQUISITION ISOMETRIC FABRICATION TABULATION OF REVISED SHEETS REVISIONS REVISIONS SHEET sie | 1 apr [__ 2 4 | 4 6 fs —_ 5 a { [ 6 8 | - 1 ao t — 4 of L 8 a || - ‘0 a2 | = " 3 | - 2 54 3 56 i _ 1“ | 8 a7 | —_ 6 8 | zl 59 8 60 | _ 8 61 2 a | | - a1 3 | I | 2 64 | - 23 65 : 2 66 i 25 87 2% 68 2 8 2 7 er 2 m PTT [- 30 ml _ u B | z 32 ™ 3 6 fl | 4 16 | - : - 38 oe — 8 ia ata = 37 wot = — 38 so | oe 29 at Cp 0 2 i/o eal om “ 3 | 2 84 ! I REQUISITION NO. Sheet: aot 4 Faquaton for ISOMETRIC FABRICATION Pigjear Ta GAS LIFT COMPRESSOR STATION (Contractor Job No c-214 2011 VORL Attached Purchaser! Thid Party Fn nw sna [aves Deilvery Requirod Mode of Transport A As per Purchase Ordar ‘As per Purchase Order Fx 4. ITEMS AND QUANTITIES. TOTAL REo.ITEMNo,| quantity | UNIT DESCRIPTION REMARKS REQUIRED | 50,000 _| Dia Inch [Piping fabrication, including welding and testing 2 72500__|_mirsq_[Surface Preparation and Painting Note: Given quantity fe approximate only, exact quantity will be measured based ‘on actual drawings: 2, SCOPE Vendor shal be responsible forthe supply of materials, fabrication, shop inspection and testing, painting, packing and deliver to the nesrest pot, including as folows [ix] Procurement Materials [ix] Surface Preparation to SA 2.5 and painting to 3 coat system [ix] Test and inspection In aordance with Code & Spectcation including [x] Radiography testing 100% {[] Utrasonictest (any) [4] Magnetic Particle Test (MP) x] Dye Penotant Test (PT) x] Visual Inspection [x] Dimension Inspection ication and Testing to ASME 851.3, Welding shall be performed based on agreed procedure (WPSIPOR, el). [ix] Al acti not spactically mentioned but required to fabricate pipe spool as per applicable code and specication requirement [ix] Protection & Packing ({] Inland 3. QAIQG REQUIREMENTS: tx bl fea fe} fe) ba (ea ta Inspection & Tost Plan Material Cenfestes ‘Welder Qualieation Test Welding Procedure and Qualification Test Inspection of Welding CCeaniness inspection Coating inspection ‘As-Bul Orawing (band Mark-up) [x1 Seaworny)

You might also like