GAS LIFT COMPRESSOR STATION
cefehild@ct§ COMPRA ENERGY S.A.
ENERGY
|
MATERIAL REQUISITION FOR |
ISOMETRIC FABRICATION |
|
|
|
|
|
|
|
|
1
= — |
|
- — I |
a | alae
a ee liens RRA = bl mal 797 Ze:
REV DATE DESCRIPTION prev. = ‘omc a
== |
WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER
TOTAL OR PARTIAL REPRODUCTION AND OR UTILIZATION OF THIS COCUMENT ARE FORSIDOEN
(let Contact No
(037-NO176-11PG1
[ Contactor Jb Ne. -211/2011
Carat Dea 2A MRA01 Ae
lent Document No E
PT. ISTANA KARANG LAUT
Page Number 1/4)COMPRA ENERGY S.A.
ENERGY
GAS LIFT COMPRESSOR STATION
Se. Jouenrs CONTRACT Wo, oceve. 2ATL-MAR-A01
5 037-NO176-11PG1 le. A
OO ens be aaa
PT.ISTANA KARANG LAUT. Bacteni cd
MATERIAL REQUISITION ISOMETRIC FABRICATION
TABULATION OF REVISED SHEETS
REVISIONS REVISIONS
SHEET sie |
1 apr [__
2 4 |
4 6 fs —_
5 a { [
6 8 | -
1 ao t —
4 of L
8 a || -
‘0 a2 | =
" 3 | -
2 54
3 56 i _
1“ |
8 a7 | —_
6 8 | zl
59
8 60 | _
8 61
2 a | | -
a1 3 | I |
2 64 | -
23 65 :
2 66 i
25 87
2% 68
2 8
2 7 er
2 m PTT [-
30 ml _
u B | z
32 ™
3 6 fl |
4 16 | - : -
38 oe —
8 ia ata =
37 wot = —
38 so | oe
29 at Cp
0 2 i/o eal om
“ 3 |
2 84 ! IREQUISITION NO.
Sheet: aot 4
Faquaton for
ISOMETRIC FABRICATION
Pigjear Ta
GAS LIFT COMPRESSOR STATION
(Contractor Job No
c-214 2011
VORL Attached
Purchaser! Thid Party
Fn nw sna
[aves
Deilvery Requirod
Mode of Transport
A As per Purchase Ordar ‘As per Purchase Order
Fx
4. ITEMS AND QUANTITIES.
TOTAL
REo.ITEMNo,| quantity | UNIT DESCRIPTION REMARKS
REQUIRED
|
50,000 _| Dia Inch [Piping fabrication, including welding and testing
2 72500__|_mirsq_[Surface Preparation and Painting
Note:
Given quantity fe approximate only, exact quantity will be measured based
‘on actual drawings:
2, SCOPE
Vendor shal be responsible forthe supply of materials, fabrication, shop inspection and testing, painting, packing and deliver to the nesrest pot,
including as folows
[ix] Procurement Materials
[ix] Surface Preparation to SA 2.5 and painting to 3 coat system
[ix] Test and inspection In aordance with Code & Spectcation including
[x] Radiography testing 100%
{[] Utrasonictest (any)
[4] Magnetic Particle Test (MP)
x] Dye Penotant Test (PT)
x] Visual Inspection
[x] Dimension Inspection
ication and Testing to ASME 851.3, Welding shall be performed based on agreed procedure (WPSIPOR, el).
[ix] Al acti not spactically mentioned but required to fabricate pipe spool as per applicable code and specication requirement
[ix] Protection & Packing ({] Inland
3. QAIQG REQUIREMENTS:
tx
bl
fea
fe}
fe)
ba
(ea
ta
Inspection & Tost Plan
Material Cenfestes
‘Welder Qualieation Test
Welding Procedure and Qualification Test
Inspection of Welding
CCeaniness inspection
Coating inspection
‘As-Bul Orawing (band Mark-up)
[x1 Seaworny)