BILL OF QUANTITY

NAMA PROYEK PEMBUATAN LUBANG PB 1 LT 2


LOKASI / SEKSI PB 1 LT 2 / FORGING 1
REFERENSI GAMBAR S1900827

NO ITEM UNIT QTY UNIT PRICE TOTAL PRICE


I JASA
A PEKERJAAN PERSIAPAN
1. Mod Demob Ls 1.00 Rp -
2. Safety protection ( Terpal , APD , Helmet , dll ) Ls 1.00 Rp -
Sub Total - A Rp -
B PEKERJAAN BONGKARAN
1. Cutting existing lantai m1 6.06 Rp -
2. Bobok existing lantai tebal 150mm m2 2.30 Rp -
Sub Total - B Rp -
C PEKERJAAN LAIN - LAIN
1. Transport cost Ls 1.00 Rp -
2. Tool charge Ls 1.00 Rp -
3. Cleaning area & buang puing Ls 1.00 Rp -
Sub Total - C Rp -

TOTAL JASA ( Sub Total A + B + C ) Rp -


Over Head 10% Rp -
TOTAL JASA Rp -

II MATERIAL
A PEMBUATAN LUBANG PB 1 LT 2

1. WF 350x175x7x11 ( Full size ) kg 595.20 Rp -

2. UNP 140x60x7 ( Full size ) kg 194.00 Rp -

3. Siku 70x70x7t ( Full size ) kg 88.56 Rp -

4. Siku 40x40x4t ( Full size ) kg 14.50 Rp -

5. Plat tebal 10mm kg 233.50 Rp -

6. Plat tebal 8mm kg 187.00 Rp -

7. Plat tebal 6mm kg 140.00 Rp -

8. Handle Ø16mm Pcs 6.00 Rp -

9. HTB M16xL60mm Pcs 48.00 Rp -

10. Painting zinchromate + KF-157 kg 913.76 Rp -

11. Finishing grouting ex. SIKA Ls 1.00 Rp -


Sub Total - A Rp -
B LAIN - LAIN
1. Miscellaneous material Ls 1.00 Rp -
2. Consumable material Ls 1.00 Rp -
Sub Total - B Rp -

TOTAL MATERIAL ( Sub Total A + B ) Rp -


Over Head 10% Rp -
TOTAL MATERIAL Rp -

GRAND TOTAL ( MATERIAL + JASA ) Rp -

ROUNDED Rp -