You are on page 1of 10

Bill Of Quantity

STRUCTURE WORK

PROJECT
JAKARTA HOUSE

OWNER
DEVELOPMENT GROUP  ANDIMAX

LOCATION
Berawa, Badung - B A L I

DECEMBER 2023


 
 
RECAPITULATION
PROJECT : J A K A R T A H O U S E
LOCATION : Berawa, Badung - B A L I

NO. DESCRIPTION SUB TOTAL

OPERATIONAL Rp -
I MANAGEMENT Rp -
II RESOURCE Rp -
III SAFETY & ENVIRONMENT Rp -
STRUCTURE WORK Rp -
I PRELIMINARY Rp -
II SOIL WORK Rp -
III FOUNDATION WORK Rp -
IV STRUCTURE PORTAL GROUND FLOOR SL. -0,050 Rp -
V STRUCTURE PORTAL FIRST FLOOR SL. +3,630 Rp -
VI STRUCTURE PORTAL ROOF FLOOR SL. +7,310 Rp -
VII STRUCTURE ROOF TOP SL. +10,260 Rp -
VIII STAIR STRUCTURE Rp -
IX STRUCTURE SUNKEN SOFA FFL -0,600 Rp -
X STRUCTURE SUNKEN OUTDOOR & POOL DECK Rp -
XI STRUCTURE POOL SL -1,300 Rp -
XII STRUCTURE PUMP ROOM & BALANCING TANK Rp -
XIII BIO SEPTIC & INFILTRATION PIT Rp -

GRAND TOTAL Rp -
NO JOB DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

OPERATIONAL
I MANAGEMENT
1 Site management staff and establishment cost 1,000 ls Rp -
2 Administration and Documentation 10,000 month Rp -
3 Weekly Report to Project Management 10,000 month Rp -
4 Shop drawing 10,000 month Rp -
5 As build drawing 2,000 books Rp -
6 Workman Insurance 1,000 ls Rp -
7 Temporary building for worker (out site) 15,000 m2 Rp -
8 Toilet / MCK 1,000 unit Rp -
9 Retribution to local government "KIPEM" 9,000 month Rp -
10 Site Office & Storage 10,000 m2 Rp -
11 Contractor all risk (insurance) 10,000 month Rp -
Sub Total Rp -
II RESOURCE
1 Temporary PLN conection (5.500 VA) 1,000 ls Rp -
2 PLN consumption for work 12,000 month Rp -
3 Water consumption for work use deep well 12,000 month Rp -
Sub Total Rp -
III SAFETY & ENVIRONMENT
1 Healty for worker (P3K) 1,000 ls Rp -
2 Safe guarding the work 1,000 ls Rp -
3 Self Protection 1,000 ls Rp -
4 Safety net 1,000 ls Rp -
5 Project protection fence 1,000 ls Rp -
6 Banner safety first 1,000 ls Rp -
Sub Total Rp -
OPERATIONAL COST Rp -
STRUCTURE WORK
I PRELIMINARY
1 Initial site cleaning 239,800 m2 Rp -
2 Uitzet / Measuring 239,800 m2 Rp -
3 Bowplank 62,550 m1 Rp -
Sub Total Rp -
II SOIL WORK
1 Excavation work continous foundation type A 35,088 m3 Rp -
2 Excavation work continous foundation type B 8,193 m3 Rp -
3 Excavation work swimming pool area 31,552 m3 Rp -
4 Excavation work pile cap BP1 (900x900x500) 12,758 m3 Rp -
5 Excavation work pile cap BP2 (1500x900x500) 16,538 m3 Rp -
6 Excavation work pile cap BP3 (2100x900x500) 6,615 m3 Rp -
7 Excavation work bore pile BP1 1,909 m3 Rp -
8 Excavation workk bore pile BP2 2,970 m3 Rp -
9 Excavation work bore pile BP3 1,273 m3 Rp -
10 Excavation work sunken sofa 16,569 m3 Rp -
11 Excavation work sunken outdoor 7,356 m3 Rp -
12 Excavation work swimming pool area 34,017 m3 Rp -
13 Excavation work pool continous foundation 3,342 m3 Rp -
14 Filling the soil back to the continous foundation type A 12,476 m3 Rp -
15 Filling the soil back to the continous foundation type B 2,037 m3 Rp -
16 Filling the soil back to the foundation BP1 4,405 m3 Rp -
17 Filling the soil back to the foundation BP2 6,728 m3 Rp -
18 Filling the soil back to the foundation BP3 m3 Rp -
19 Soil filling for floor elevation 82,077 m3 Rp -
20 Soil fill compaction 149,230 m2 Rp -
21 Disposal of waste soil 70,457 m3 Rp -
Sub Total Rp -
III FOUNDATION WORK
1 Bore pile foundation BP1 900x900 ; 1x 300
Pile rebar U42 8 D13 262,584 kg Rp -
Pile stirrup U28 8-150mm 67,037 kg Rp -
Pile concrete Sitemix 25 MPa / K-300 1,909 m3 Rp -
Sand fill 100mm thk 0,729 m3 Rp -
Lean concrete K-175 50mm thk 0,365 m3 Rp -
Pile cap formwork from concrete brick 16,200 m2 Rp -
Pile cap top rebar U42 D13-150mm 56,041 kg Rp -
Pile cap belt rebar U42 1 D16 5,681 kg Rp -
Pile cap bot rebar U42 D16-100mm 259,954 kg Rp -
Pile cap Readymix 25 MPa / K-300 3,645 m3 Rp -
2 Bore pile foundation BP2 1500x900 ; 2x 300
Pile rebar U42 8 D13 408,464 kg Rp -
Pile stirrup U28 8-150mm 104,280 kg Rp -
Pile concrete Sitemix 25 MPa / K-300 2,970 m3 Rp -
Pile cap Readymix 25 MPa / K-300 4,725 m3 Rp -
Sand fill 100mm thk 0,945 m3 Rp -
Lean concrete K-175 50mm thk 0,473 m3 Rp -
Pile cap formwork from concrete brick 16,800 m2 Rp -
Pile cap top rebar U42 D13-150mm 74,646 kg Rp -
Pile cap belt rebar U42 1 D16 7,574 kg Rp -
Pile cap bot rebar U42 D16-100mm 337,311 kg Rp -
3 Bore pile foundation BP3 2100x900 ; 3x 300
Pile rebar U42 8 D13 175,056 kg Rp -
Pile stirrup U28 8-150mm 44,691 kg Rp -
Pile concrete Sitemix 25 MPa / K-300 1,273 m3 Rp -
Sand fill 100mm thk 0,378 m3 Rp -
Lean concrete K-175 50mm thk 0,189 m3 Rp -
Pile cap formwork from concrete brick 6,000 m2 Rp -
Pile cap top rebar U42 D13-150mm 38,858 kg Rp -
Pile cap belt rebar U42 1 D16 9,468 kg Rp -
Pile cap bot rebar U42 D16-100mm 153,824 kg Rp -
Pile cap Readymix 25 MPa / K-300 1,890 m3 Rp -
4 Pedestal column K1 200x850
Rebar U42 16 D16 372,408 kg Rp -
Stirrup U28 6 D10-100 138,67 kg Rp -
Formwork used twice 16,275 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,318 m3 Rp -
5 Pedestal column K2 200x500
Rebar U42 12 D16 822,769 kg Rp -
Stirrup U28 4 D10-100 189,36 kg Rp -
Formwork used twice 23,870 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,705 m3 Rp -
6 Pedestal column K3 300x300
Rebar U42 12 D16 340,848 kg Rp -
Stirrup U28 4 D10-100 86,07 kg Rp -
Formwork used twice 9,300 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,698 m3 Rp -
7 Continous foundation river stone masonry type A
Sand filling 1,671 m3 Rp -
Anchor U28 D10-300 91,637 kg Rp -
River stone masonry 1pc : 4pp 20,941 m3 Rp -
8 Continous foundation river stone masonry type B
Sand filling 0,390 m3 Rp -
Anchor U28 D10-300 21,398 kg Rp -
River stone masonry 1pc : 4pp 5,766 m3 Rp -
Sub Total Rp -
IV STRUCTURE PORTAL GROUND FLOOR SL. -0,050
1 Column K1 200x850
Rebar U42 16 D16 458,251 kg Rp -
Stirrup U28 4 D10-100~150 470,339 kg Rp -
Formwork used twice 38,115 m2 Rp -
Concrete Sitemix 25 MPa / K-300 3,086 m3 Rp -
2 Column K2 200x500
Rebar U42 12 D16 756,114 kg Rp -
Stirrup U28 D10-100~150mm 413,898 kg Rp -
Formwork used twice 55,902 m2 Rp -
Concrete Sitemix 25 MPa / K-300 3,993 m3 Rp -
3 Column K3 300x300
Rebar U42 12 D16 343,688 kg Rp -
Stirrup U28 D10-100~150mm 161,259 kg Rp -
Formwork used twice 21,780 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,634 m3 Rp -
4 Column K5 150x150
Rebar U42 4 D13 30,260 kg Rp -
Stirrup U28 8-100mm 20,647 kg Rp -
Formwork used twice 4,356 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,163 m3 Rp -
5 Reinforcement concrete wall RCW2 150mm Thk
Formwork used twice 7,659 m2 Rp -
Vertical rebar U28 D10-150mm 15,753 kg Rp -
Horizontal rebar U28 8-150mm 10,085 kg Rp -
Concrete Sitemix 25 MPa / K-300 0,574 m3 Rp -
6 Tie beam TB1 300x450
Rebar U42 8 D16 1.392,427 kg Rp -
Torque U42 2 D16 348,107 kg Rp -
Stirrup U28 310-100~150mm 1.061,660 kg Rp -
Formwork used twice 121,330 m2 Rp -
Concrete Sitemix 25 MPa / K-300 14,891 m3 Rp -
7 Tie beam TB2 200x300
Rebar U42 6 D13 160,051 kg Rp -
Torque U42 2 D13 80,026 kg Rp -
Stirrup U28 8-100~150mm 97,075 kg Rp -
Formwork used twice 15,360 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,536 m3 Rp -
8 Tie beam TB3 150x250
Rebar U42 4 D13 63,145 kg Rp -
Torque U42 2 D13 47,359 kg Rp -
Stirrup U28 8-100~150mm 47,874 kg Rp -
Formwork used twice 9,090 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,909 m3 Rp -
9 Slab on ground S1 100mm thk
Sand filling 50mm thk 7,462 m3 Rp -
Lean concrete K-175 50mm thk 7,462 m3 Rp -
Plastic mmbrane/waterproofing 149,230 m2 Rp -
Reinforcing Wiremesh M8 1 layer 149,230 m2 Rp -
Concrete Sitemix 25 MPa / K-300 10,799 m3 Rp -
Sub Total Rp -
V STRUCTURE PORTAL FIRST FLOOR SL. +3,630
1 Column K2 200x500
Rebar U42 12 D16 557,476 kg Rp -
Stirrup U28 D10-100~150mm 610,327 kg Rp -
Formwork used twice 82,432 m2 Rp -
Concrete Sitemix 25 MPa / K-300 5,888 m3 Rp -
2 Column K3 300x300
Rebar U42 12 D16 23,228 kg Rp -
Stirrup U28 D10-100~150mm 32,696 kg Rp -
Formwork used twice 4,416 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,331 m3 Rp -
3 Column K5 150x150
Rebar U42 4 D13 30,676 kg Rp -
Stirrup U28 8-100mm 20,932 kg Rp -
Formwork used twice 4,416 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,166 m3 Rp -
4 Reinforcement concrete wall RCW2 150mm Thk
Formwork used twice 15,530 m2 Rp -
Vertical rebar U28 D10-150mm 31,939 kg Rp -
Horizontal rebar U28 8-150mm 20,447 kg Rp -
Concrete Sitemix 25 MPa / K-300 1,165 m3 Rp -
5 Beam B1 250x500
Rebar U42 12 D16 1.501,189 kg Rp -
Torque U42 4 D13 330,427 kg Rp -
Stirrup U28 310-100~150mm 880,450 kg Rp -
Formwork used twice 118,916 m2 Rp -
Concrete Readymix 25 MPa / K-300 9,910 m3 Rp -
6 Beam B2 200x350
Rebar U42 6 D13 285,485 kg Rp -
Torque U42 2 D13 95,162 kg Rp -
Stirrup U28 8-100~150mm 158,725 kg Rp -
Formwork used twice 34,247 m2 Rp -
Concrete Readymix 25 MPa / K-300 2,854 m3 Rp -
7 Beam B3 300x600
Rebar U42 12 D16 428,503 kg Rp -
Torque U42 4 D16 190,446 kg Rp -
Stirrup U28 410-100~150mm 268,072 kg Rp -
Formwork used twice 45,258 m2 Rp -
Concrete Readymix 25 MPa / K-300 5,431 m3 Rp -
8 Beam B4 150x550
Rebar U42 4 D13 223,980 kg Rp -
Torque U28 6 D13 335,970 kg Rp -
Stirrup U28 8-100~150mm 237,737 kg Rp -
Formwork used twice 67,173 m2 Rp -
Concrete Readymix 25 MPa / K-300 9,673 m3 Rp -
9 Floor slab S2 150mm thk
Top layer U28 D10-150mm 1.406,118 kg Rp -
Bot layer U28 D10-150mm 2.157,576 kg Rp -
Formwork used twice 170,922 m2 Rp -
Concrete Readymix 25 MPa / K-300 16,162 m3 Rp -
Sub Total Rp -
VI STRUCTURE PORTAL ROOF FLOOR SL. +7,310
1 Column K4 200x200
Rebar U42 12 D16 186,204 kg Rp -
Stirrup U28 8-100~150mm 111,864 kg Rp -
Formwork used twice 23,600 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,180 m3 Rp -
2 Ring Beam RB1 250x450
Rebar U42 8 D16 1.122,185 kg Rp -
Torque U42 4 D13 370,506 kg Rp -
Stirrup U28 310-100~150mm 811,735 kg Rp -
Formwork used twice 102,227 m2 Rp -
Concrete Readymix 25 MPa / K-300 10,000 m3 Rp -
3 Ring Beam RB2 200x350
Rebar U42 6 D13 288,992 kg Rp -
Torque U42 2 D13 96,331 kg Rp -
Stirrup U28 8-100~150mm 160,675 kg Rp -
Formwork used twice 34,668 m2 Rp -
Concrete Readymix 25 MPa / K-300 3,236 m3 Rp -
4 Ring Beam RB3 300x550
Rebar U42 9 D16 170,159 kg Rp -
Torque U28 4 D16 255,238 kg Rp -
Stirrup U28 310-100~150mm 299,396 kg Rp -
Formwork used twice 37,741 m2 Rp -
Concrete Readymix 25 MPa / K-300 4,448 m3 Rp -
5 Ring Beam RB4 150x550
Rebar U42 4 D13 251,801 kg Rp -
Torque U28 6 D13 377,702 kg Rp -
Stirrup U28 8-100~150mm 267,267 kg Rp -
Formwork used twice 75,516 m2 Rp -
Concrete Readymix 25 MPa / K-300 9,968 m3 Rp -
6 Floor slab S2 150mm thk
Top layer U28 D10-150mm 1.609,942 kg Rp -
Bot layer U28 D10-150mm 2.466,701 kg Rp -
Formwork used twice 195,698 m2 Rp -
Concrete Readymix 25 MPa / K-300 19,344 m3 Rp -
Sub Total Rp -
VII STRUCTURE ROOF TOP SL. +10,260
1 Roof beam
WF 250.125.6.9 1.471,505 kg Rp -
WF 200.100.5,5.8 406,010 kg Rp -
End plate 10mm thk 85,959 kg Rp -
End plate 9mm thk 23,333 kg Rp -
Anchor 3x2 D13 (A325N) - 180mm depth 204,000 pcs Rp -
Bolt HTB 2x2 D13 (A325N) 128,000 pcs Rp -
Cat zincromate 1.986,807 kg Rp -
2 List plank
Hollow 100.50.5 342,051 kg Rp -
Cat zincromate 342,051 kg Rp -
3 Roof slab S3 120mm thk
Top layer U28 8-150mm 331,484 kg Rp -
Bot layer U28 8-150mm 341,512 kg Rp -
Formwork used twice 62,940 m2 Rp -
Concrete Readymix 25 MPa / K-300 7,553 m3 Rp -
Sub Total Rp -
VIII STAIR STRUCTURE
1 Stair Ground floor to First floor
Colomn I WF 300.150.6,5.9 150,470 kg Rp -
Stair frame HB 200.200.8.12 354,290 kg Rp -
Stifener plate 8mm thk 12,986 kg Rp -
Base plate 10mm thk 63,697 kg Rp -
Anchor D16 (A325N) - 300mm 28,000 pcs Rp -
Dynabolt D13 (A325N) 12,000 pcs Rp -
Stepping knee brace 1/2 IWF 200.100.5,5.8 68,213 kg Rp -
Stepping steel plate 10mm black dop pain finishing 332,704 kg Rp -
Stepping steel holow frame 40x40mm 50,400 m1 Rp -
Stepping solid teakwood 20mm thk finish natural 5,124 m2 Rp -
Nosing solid teakwood 20mm thk finish natural 0,672 m2 Rp -
Welding connection AWS 1,000 ls Rp -
Cat zincromate 982,360 kg Rp -
2 Stair First floor to Roof floor
Colomn I WF 300.150.6,5.9 150,470 kg Rp -
Stair frame HB 200.200.8.12 354,290 kg Rp -
Stifener plate 8mm thk 12,986 kg Rp -
Base plate 10mm thk 63,697 kg Rp -
Anchor D16 (A325N) - 300mm 28,000 pcs Rp -
Dynabolt D13 (A325N) 12,000 pcs Rp -
Stepping knee brace 1/2 IWF 200.100.5,5.8 68,213 kg Rp -
Stepping steel plate 10mm black dop pain finishing 332,704 kg Rp -
Stepping steel holow frame 40x40mm 50,400 m1 Rp -
Stepping solid teakwood 20mm thk finish natural 5,124 m2 Rp -
Nosing solid teakwood 20mm thk finish natural 0,672 m2 Rp -
Welding connection AWS 1,000 ls Rp -
Cat zincromate 982,360 kg Rp -
Sub Total Rp -
IX STRUCTURE SUNKEN SOFA FFL -0,600
1 River stone continous foundation
Sand fill 50mm thk 0,410 m3 Rp -
River stone masonry 1pc : 4pp 4,100 m3 Rp -
Anchor U28 D13-500 34,178 kg Rp -
2 Column K5 150x150
Rebar U42 4 D13 7,502 kg Rp -
Stirrup U28 8-100mm 2,844 kg Rp -
Formwork used twice 0,720 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,027 m3 Rp -
3 Tie beam TB2 200x300
Rebar U42 6 D13 102,533 kg Rp -
Torque U42 2 D13 34,178 kg Rp -
Stirrup U28 8-100~150mm 51,824 kg Rp -
Formwork used twice 9,840 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,984 m3 Rp -
4 Slab on ground S2 150 mm thk
Top layer U28 8-150mm 247,056 kg Rp -
Bot layer U28 8-150mm 263,345 kg Rp -
Sand fill 50mm thk 1,035 m3 Rp -
Lean concrete K-175 50mm thk 1,035 m3 Rp -
Plastic mmbrane/waterproofing 20,703 m2 Rp -
Concrete Sitemix 25 MPa / K-300 3,105 m3 Rp -
5 Reinforcement concrete wall RCW1 150mm Thk
Vertical rebar U28 D13-100mm 51,266 kg Rp -
Horizontal rebar U28 D10-150mm 20,238 kg Rp -
Formwork from concrete brick 4,920 m2 Rp -
Formwork used twice 4,920 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,738 m3 Rp -
6 Brick masonry
Hebel 60x20x20cm with Mortar MU380 6,724 m3 Rp -
Plastering with MU301 15mm thk 65,600 m2 Rp -
Skim with MU200 65,600 m2 Rp -
Sub Total Rp -
X STRUCTURE SUNKEN OUTDOOR & POOL DECK
1 River stone continous foundation
Sand fill 50mm thk 0,275 m3 Rp -
River stone masonry 1pc : 4pp 2,750 m3 Rp -
Anchor U28 D13-500 22,924 kg Rp -
2 Column K5 150x150
Rebar U42 4 D13 16,672 kg Rp -
Stirrup U28 8-100mm 6,636 kg Rp -
Formwork used twice 1,680 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,063 m3 Rp -
3 Tie beam TBP2 200x300
Rebar U42 6 D13 68,772 kg Rp -
Torque U42 2 D13 22,924 kg Rp -
Stirrup U28 8-100~150mm 34,760 kg Rp -
Formwork used twice 6,600 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,660 m3 Rp -
4 Slab on ground S2 150 mm thk
Top layer U28 8-150mm 105,402 kg Rp -
Bot layer U28 8-150mm 118,175 kg Rp -
Sand fill 50mm thk 0,306 m3 Rp -
Lean concrete K-175 50mm thk 0,306 m3 Rp -
Plastic mmbrane/waterproofing 6,128 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,919 m3 Rp -
5 Reinforcement concrete wall RCW1 150mm Thk
Vertical rebar U28 D13-100mm 34,386 kg Rp -
Horizontal rebar U28 D10-150mm 13,574 kg Rp -
Formwork from concrete brick 3,300 m2 Rp -
Formwork used twice 3,300 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,495 m3 Rp -
6 Brick masonry
Hebel 60x20x20cm with Mortar MU380 4,510 m3 Rp -
Plastering with MU301 15mm thk 44,000 m2 Rp -
Skim with MU200 44,000 m2 Rp -
Sub Total Rp -
XI STRUCTURE POOL SL -1,300
1 River stone foundation
Sand filling 0,828 m3 Rp -
River stone masonry 1pc : 4pp 8,282 m3 Rp -
Anchor U28 D13-1000mm 17,260 kg Rp -
2 Column KP 150x150
Rebar U42 4 D13 28,342 kg Rp -
Stirrup U28 8-100mm 12,324 kg Rp -
Formwork used twice 3,120 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,117 m3 Rp -
3 Tie beam TBP1 250x400
Rebar U42 8 D16 319,753 kg Rp -
Torque U42 2 D16 79,938 kg Rp -
Stirrup U28 310-100~150mm 212,541 kg Rp -
Formwork used twice 20,263 m2 Rp -
Concrete Sitemix 25 MPa / K-300 2,533 m3 Rp -
4 Tie beam TBP2 200x300
Rebar U42 6 D13 48,766 kg Rp -
Torque U42 2 D13 16,255 kg Rp -
Stirrup U28 8-100~150mm 38,501 kg Rp -
Formwork used twice 4,680 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,468 m3 Rp -
5 Tie beam TBP3 200x300
Rebar U42 6 D13 158,357 kg Rp -
Torque U42 2 D13 52,786 kg Rp -
Stirrup U28 8-100~150mm 125,024 kg Rp -
Formwork used twice 15,197 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,520 m3 Rp -
6 Pool slab S4 200mm thk
Sand filling 50mm thk 1,493 m3 Rp -
Lean concrete K-175 50mm thk 1,493 m3 Rp -
Plastic mmbrane/waterproofing 29,858 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,493 m3 Rp -
Top layer U28 D13-150mm 414,833 kg Rp -
Bot layer U28 D13-150mm 450,094 kg Rp -
Concrete Sitemix 25 MPa / K-300 5,972 m3 Rp -
7 RCWP1 wall pool 150mm Thk
Formwork masonry concrete brick 32,994 m2 Rp -
Plastic mmbrane/waterproofing 32,994 m2 Rp -
Vertical rebar U28 D13-100mm 687,595 kg Rp -
Horizontal rebar U28 D10-150mm 271,431 kg Rp -
Formwork used twice 32,994 m2 Rp -
Concrete Sitemix 25 MPa / K-300 4,949 m3 Rp -
Sub Total Rp -
XII STRUCTURE PUMP ROOM & BALANCING TANK
1 River stone foundation
Sand filling 0,503 m3 Rp -
River stone masonry 1pc : 4pp 5,030 m3 Rp -
Anchor U28 D13-1000mm 10,483 kg Rp -
2 Column KP 150x150
Rebar U42 4 D13 7,086 kg Rp -
Stirrup U28 8-100mm 6,162 kg Rp -
Formwork used twice 1,560 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,059 m3 Rp -
3 Tie beam TBP1 250x400
Rebar U42 8 D16 155,540 kg Rp -
Torque U42 2 D16 38,885 kg Rp -
Stirrup U28 310-100~150mm 103,388 kg Rp -
Formwork used twice 9,857 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,232 m3 Rp -
4 Tie beam TBP2 200x300
Rebar U42 6 D13 48,766 kg Rp -
Torque U42 2 D13 16,255 kg Rp -
Stirrup U28 8-100~150mm 38,501 kg Rp -
Formwork used twice 4,680 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,468 m3 Rp -
5 Tie beam TBP3 200x300
Rebar U42 6 D13 77,031 kg Rp -
Torque U42 2 D13 25,677 kg Rp -
Stirrup U28 8-100~150mm 60,816 kg Rp -
Formwork used twice 7,393 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,739 m3 Rp -
6 Pool slab S4 200mm thk
Sand filling 50mm thk 0,418 m3 Rp -
Lean concrete K-175 50mm thk 0,418 m3 Rp -
Plastic mmbrane/waterproofing 8,367 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,418 m3 Rp -
Top layer U28 D13-150mm 116,245 kg Rp -
Bot layer U28 D13-150mm 133,678 kg Rp -
Concrete Sitemix 25 MPa / K-300 1,673 m3 Rp -
7 RCWP1 wall pool 150mm Thk
Formwork masonry concrete brick 26,452 m2 Rp -
Plastic mmbrane/waterproofing 26,452 m2 Rp -
Vertical rebar U28 D13-100mm 551,268 kg Rp -
Horizontal rebar U28 D10-150mm 217,615 kg Rp -
Formwork used twice 26,452 m2 Rp -
Concrete Sitemix 25 MPa / K-300 3,968 m3 Rp -
8 Roof slab S3 120mm thk
Top layer U28 8-150mm 69,057 kg Rp -
Bot layer U28 8-150mm 73,634 kg Rp -
Formwork used twice 13,112 m2 Rp -
Concrete Readymix 25 MPa / K-300 1,573 m3 Rp -
Sub Total Rp -
XIII BIO SEPTIC & INFILTRATION PIT
1 Bioseptictank Pit
Concrete brick 300x100x150mm with specy 1pc : 3pp 8,000 m2 Rp -
Wall plastering with portland cement 1pc : 2pc 16,000 m2 Rp -
Topping flat concrete K-250, 100mm thk wiremesh M6 2,560 m2 Rp -
2 Infiltration Pit
Precast circullar concrete Bus 1000x500x80mm 8,000 pcs Rp -
Topping flat concrete K-250, 100mm thk wiremesh M6 2,000 m2 Rp -
Sand fill 0,471 m3 Rp -
Palm fiber 0,943 m3 Rp -
Coral split 0,471 m3 Rp -
Coral stone 0,471 m3 Rp -
Sub Total Rp -
STRUCTURE COST Rp -