BID SUM DRILLING PT INDEXIM COALINDO

Volume Unit Price (Rp) Total Price (Rp)


Spesific Points
Mobilization & demobilization rig unit
Mob & demob (3 unit Rig + Personel) 1.00 Rp -
Drilling operation
Open hole NQ size (0-150 m) - Rp - Rp -
Open hole NQ size (>150 m) - Rp - Rp -
Partly coring NQ size (0-150 m), core recovery >90% - Rp - Rp -
Partly coring NQ size (>150 m), core recovery >90% - Rp - Rp -
Full coring NQ size (0-150 m), core recovery >90% - Rp - Rp -
Full coring NQ size (>150 m), core recovery >90% - Rp - Rp -
Open hole HQ size (0-150 m) Rp 250,000 Rp -
Open hole HQ size (>150 m) 100.00 Rp 285,000 Rp 28,500,000
Partly coring HQ size (0-150 m), core recovery >90% - Rp 380,000 Rp -
Partly coring HQ size (>150 m), core recovery >90% Rp 410,000 Rp -
Full coring HQ size (0-150 m), core recovery >90% 2,550.00 Rp 450,000 Rp 1,147,500,000
Full coring HQ size (>150 m), core recovery >90% 455.00 Rp 600,000 Rp 273,000,000
Standby active rate (reaming, flushing, casing actual on site Rp -
installation, hole condition)
Standby passive rate (social problem, waiting client 80.50 Rp -
instruction, run geophysical logging, working related
geotechnical & geohydrology) after 1 hour free
Stand by longterm after 2 days free Rp 1,500,000 Rp -
Drilling consumable
Ausgel/Ausplug - Rp -
Austrol - Rp - Rp -
Polymer incld meter
CR 650 - Rp - Rp -
Bentonite incld meter Rp -
Diesel fuel incld meter Rp -
Premium fuel - Rp -
Grease incld meter Rp -
Other consumable Rp -
Casing PVC 5" size - Rp - Rp -
Casing PVC 4" size 100.00 Rp -
Casing PVC 3" size - Rp - Rp -
Core box (galvanize) 600.00 Rp 200,000 Rp 120,000,000
Rig Moving
Site to site moving in line M Rp 6,000
Site to site moving out line M Rp 8,000
site to site moving between block M Rp 10,000
Waterline Rp -
Waterline excess >1000 m actual on site Rp 5,000
Transportation & Accomodation Rp -
Daily transportation incld meter Rp -
Accomodation (camp, meal) incld meter Rp -
Drilling crew Rp -
Drilling crew incld meter Rp -
Other Information Rp -
Working hour
Rig type/name
Rig moving block to block actual on site Rp 3,500,000
Hole size - HQ size
Minimum recovery - 90
Re-drill if not reach target minimum recovery - 1
Maximum depth - 300
Rig moving hole to hole >100 m actual on site Rp 10,000 Rp -
Main acces to drilling area - by client
Safety officer by contractor is mandatory
Drilling supervisor by contractor is mandatory
Mechanic by contractor is mandatory
Site visit by contractor is mandatory
Number of drilling unit 3 unit
ESTIMATE TOTAL Rp 1,569,000,000
Cost equivalent to 1 unit Rig Rp 523,000,000
ADDITIONAL JOB WELLSITE
1. MONTHLY RATE
A. Wellsite Geologist
1. Ery Ahmadi 90 350,000 31,500,000
2. Andry Prihadi 90 350,000 31,500,000
3. M. Taufik 90 350,000 31,500,000
B. Meal & Camp
Sub Total MONTHLY FEE (1)

2. INSURANCE
Sub Total INSURANCE (2)
TOTAL (1+2)
Management Fee (10%)
TOTAL PEK WELLSITE/bln 94,500,000
TOTAL DRILLING & WELLSITE 1,663,500,000
Item to be consider
Reference:

Price:
1. Mob Demob
2. Drilling rate
3. Standby rate/hour
Conclusions

NOTE UTK PEK WELLSITE PT Karya Bumi Prima:

1. PRICE INCLD PPN


2. AIRFARE VV (TO SITE), LOCAL TRANSPORT,CAMP, MEALS, LOCAL LABOUR COVERED BY CONTRACTOR
3. DAILY RATE PAYMENT DEPEND ON ACTUAL FIELD TIME SHEET PER MONTH
4. MINIMUM CONTRACT 3 MONTHS

5. IF ANY CONTRACT ANY DELAY AFTER 3 MONTHS SCHEDULE CAUSED BY CONTRACTOR UN PROPERLY, SHOULD BE RESPONSIBLE
BY CONTRACTOR.

6. DP 15% AFTER UNIT ON SITE & MOB DEMOB WILL BE PAID AFTER UNIT ON SITE
7. SPARE PART READY & PA UNIT-85%