You are on page 1of 54

REKAPITULASI ENGINEER ESTIMATE

PROJECT TITLE : LEMBAGA PENJAMIN MUTU PENDIDIKAN (LPMP) SULAWESI SELATAN


LOCATION : MAKASSAR
FINANCIAL YEAR : 2021
BUILDING : GEDUNG LPMP

MECHANICAL, ELECTRICAL & PLUMBING


TOTAL
NO. DESCRIPTION
( in Rp )
a b c
I. ELECTRICAL, ELECTRONIC
1.A ELECTRICAL DISTRIBUTION POWER PANEL Rp -
1.B ELECTRICAL ARMATURE & LIGHTNING PROTECTION INSTALATION Rp -
1.C INTEGRATION SYSTEM (IP CCTV, IP TELEPON, DATA, IP TV) Rp -
1.D FIRE ALARM Rp -
1.E PUBLIC ADDRESS Rp -
SUB TOTAL I,…............. Rp -
II. MECHANICAL
2.A CLEAN WATER SUPPLY & WATER TREATMENT INSTALATION Rp -
2.B SEWAGE WATER INSTALATION Rp -
2.C WASTE WATER INSTALATION Rp -
2.E FIRE FIGHTING INSTALATION Rp -
2.F AIR CONDITIONING Rp -
2.G VENTILATION FAN Rp -
SUB TOTAL II,….......... Rp -
III INFRASTRUKTUR MEP
3.A ELECTRICAL INFRASTRUKTUR Rp -
3.B CLEAN WATER SUPPLY INSTALATION SYSTEM Rp -
3.C FIRE FIGHTING INSTALATION SYSTEM Rp -
SUB TOTAL III,….......... Rp -
JUMLAH I,II,III…........... Rp -
PPN 10 %,…............ Rp -
REAL COST,…............ Rp -
DIBULATKAN,…............ Rp -
Terbilang :
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III
SATUAN KERJA : LPMP SULAWESI SELATAN
TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : ELECTRICAL, ELECTRONIC
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
I.A ELECTRICAL
I.A.1 DISTRIBUTION BOARD PANEL & POWER CABEL
I.A.1.1 4th FLOOR
1 LP. 4 unit 1.00 - -
2 PP. 4 unit 1.00 - -
3 PP. IU. AC 4 unit 1.00 - -

I.A.3 CABLE FEEDER INSTALLATION


I.A.3.2 Cable feeder instalation SDP. 1 to :
1 PP. 4 NYY 4 x 10 mm² m' 15.00 - -
2 LP. 4 NYY 4 x 6 mm² m' 15.00 - -
3 PP. IU AC. 4 NYY 4 x 6 mm² m' 15.00 - -

I.A.4 CABLE LADDER, CABLE TRAY, FLOOR DUCT INSTALATION

I.A.4.5 4th Floor CableTray / Ladder


1 Electrical Ladder
- 600 mm x 100 mm x 2 mm m' 23.00 - -
- 400 mm x 100 mm x 2 mm m' 24.00 - -
- 200 mm x 100 mm x 2 mm m' 20.00 - -
2 Electronic Tray
- 200 mm x 50 mm x 2 mm m' 79.00 - -

3 Ladder / Tray Accessories


- Fitting, Elbow, Tee lot 1.00 - -
- Hanger & Support lot 1.00 - -

I.A.6 TESTING & COMMISSIONING ELECTRICAL INSTALATION


Continue, Megger, Grounding & Function Test - EL Lot 1.00 - -

( 1.A ) = TOTAL INSTALLATION PANEL -

I.B.1 ARMATURE, CABELING, LIGHTENING PROTECTION


I.B.1.4 4th Floor
Lighting Fixtures & Installation
1 RC091V LED36S 40 W PSU W30L120 GM G2 pcs 50.00 - -
2 WT188C LED20 CW L1200 PSU /6500K pcs 3.00 - -
3 DN027B LED15/CW D175 RD pcs 20.00 - -
4 DN027B LED20/CW D200 RD pcs 73.00 - -
5 Emergency twinspot light 2x10W pcs 6.00 - -
6 Exit LED 8W pcs 3.00 - -
7 Occuswitch pcs 17.00 - -
8 Installation Cable NYM 3 x 2.5 mm² for Lamp point 172.00 - -
9 Lighting Accessories, Hanger Support, etc lot 1.00 - -
Switch Fixtures & Installation
1 Single Switch pcs 2.00 - -
2 Double Switch pcs 15.00 - -
3 Grid Switch 6 Gang pcs 2.00 - -
4 Grid Switch 8 Gang pcs 2.00 - -
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III
SATUAN KERJA : LPMP SULAWESI SELATAN
TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : ELECTRICAL, ELECTRONIC
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

Socket Outlet Fixtures & Installation


1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 66.00 - -
2 Socket Outlet 200 VA (10A) 1 Phasa Type Floor pcs 6.00 - -
3 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA point 72.00 - -
4 Continue, Megger, Grounding & Function Test - EL lot 1.00 - -

I.B.3 TESTING & COMMISSIONING ELECTRICAL INSTALLATION


Continue, Megger, Grounding & Function Test - EL Lot 1.00 - -

( 1.B ) = TOTAL ELECTRICAL ARMATURE & LIGHTNING PROTECTION INSTALATON -

I.C INTEGRATION SYSTEM ( IP CCTV, IP TELEPON, IP TV, DATA )

I.C.2 INSTALATION IN BUILDING


I.C.2.4 4th Floor
1 Jaringan Fiber Optic
* Optical Network Unit (ONU) unit 1.00 - -
* Optical Terminal Box unit 1.00 - -
* Passive Optical Splitter 4 port unit - - -
* Kabel Fiber Optic 4 core Singlemode 9 um m 50.00 - -
* Patch Cord FO SC-SC 1 Core pcs 2.00 - -

2 Jaringan UTP
* Patch Panel UTP Cat. 6 kap. 24 port unit 2.00 - -
* Patch Cord UTP Cat . 6 panjang 1 meter pcs 48.00 - -
* Patch Cord UTP Cat . 6 panjang 3 meter pcs 48.00 - -

3 Outlet tediri dari Face Flate, Modular Jack, Inbow, Equipments:


* Outlet IP TV pcs 11.00 - -
* Outlet Telepon pcs 11.00 - -
* Outlet Data pcs 11.00 - -
* IP CCTV 2MP Dome, Poe pcs 4.00 - -
* IP CCTV 2MP Bullet, Poe pcs 1.00 - -
* Wifi Access Point pcs 2.00 - -
* IPTV Set Top Box c/w HDMI Cable pcs 11.00 - -
* Pesawat IP Phone pcs 11.00 - -

4 Profesional Services
* UTP Installation + Conduit Installation (Inc UTP Cat6 Cable+PVC) point 40.00 - -
* UTP Termination + Pengukuran point 80.00 - -

5 Support Facility
* Wiring Management unit 2.00 - -
* Rack Wall Mounted 19" 9U unit 1.00 - -
kelengkapan rak :
- Exhaust Fan
- Power socket

I.C.3 Testing & Commisioning


1 Testing and Commissioning Data Network lot 1.00 -
2 Testing and Commissioning CCTV lot 1.00 -
3 Testing and Commissioning IPTV lot 1.00 -
4 Testing and Commissioning Telepon lot 1.00 -

( 1.C ) = TOTAL INSTALATION INTEGRATION SYSTEM -


RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III
SATUAN KERJA : LPMP SULAWESI SELATAN
TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : ELECTRICAL, ELECTRONIC
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

I.D FIRE ALARM SYSTEM


I.D.1 MAIN EQUIPMENT EXISTING
10 Cable feeder in conduit PVC HI dia 20 mm :
● NYMHY 2(3 x 2,5 mm²) - MDF to TB-FA4 m 45.00 - -
11 Cables STP, Connector & Terminals m 100.00 - -
L.D.2 FIRE ALARM INSTALATION IN BUILDING
I.D.2. 4 4th Floor
1 TB-FA 4 set 1.00 - -
2 Horn and Strobe unit 2.00 - -
Spesifikasi Teknis:
● Indoor Wall Mount
● 12/24VDC
● Universal back plate mounting
3 Manual Break Glass unit 2.00 - -
Spesifikasi Teknis:
● Konvensional
● Single or Dual Action
● Key resettable
High-gloss red enamel finish
● Plastic breakrod
● Mounts on standard single gang box
4 Smoke Detector Konvensional unit 2.00 - -
Spesifikasi Teknis:
● High reliability of detection thanks to evaluation electronics
● Activation of a remote external detector alarm display possible
● Dust-repellent labyrinth and cap construction
● Photoelectric detectors are available with additional fixed temperature detection
or with multi-criteria photo/heat detection operation
5 Heat Detector Konvensional unit 23.00 - -
Spesifikasi Teknis:
● High reliability of detection thanks to evaluation electronics
● Activation of a remote external detector alarm display possible
● Dust-repellent labyrinth and cap construction
● Thermal Differential / Thermal Maximum
6 Installation Cable NYMHY 2x1.5 mm in HI conduit PVC pipe for Konvensional detector point 25.00 -
7 Installation Cable NYMHY 2x1.5 mm in HI conduit PVC pipe for Horn & Strobe point 2.00 - -
8 Installation Cable NYMHY 2x1.5 mm in HI conduit PVC pipe for Manual Break Glass point 2.00 -
9 Installation Cable NYMHY 2x1.5 mm in HI conduit PVC pipe for Flow Switch point 1.00 - -
10 Installation Cable NYMHY 2x1.5 mm in HI conduit PVC pipe for Tempered switch point 1.00 - -
I.D. 3 TESTING & COMMISIONING lot 1.00 - -
( 1.D ) = TOTAL INSTALATION FIRE ALARM -
I.E PUBLIC ADDRESS & GENERAL ANNOUNCEMENT
I.E.1 Main Equipment EXISTING
1 Cable feeder in conduit PVC HI dia 20 mm :
● NYMHY 3(3 x 2,5 mm²) - MDF to TB-SS 4 m 50.00 - -
I.E.5 4th Floor
Fixtures & Armatures
1 Terminal Box Sound System (TB-SS1) unit 1.00 - -
2 Ceiling speaker 3 watt & matching transformer pcs 25.00 - -
3 Wall Box Speaker 6 Watt pcs 1.00 - -
4 Volume Control 6 ~ 30 Watt pcs 9.00 - -
Installation fixtures c/w conduit,cable & acc
1 Instalasi Speaker dengan kabel NYMHY 3 x 1.5 mm2 in HI conduit PVC point 34.00 -
2 Instalasi Speaker dengan kabel FRC 3 x 1.5 mm2 in HI conduit PVC point 1.00 -
I.E.11 TESTING & COMMISIONING PA lot 1.00 -

( 1.E ) = TOTAL INSTALATION PUBLIC ADRESS SYSTEM -


(1.A~1.G ) = TOTAL ELECTRICAL & ELECTRONIC -
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III

SATUAN KERJA : LPMP SULAWESI SELATAN


TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : MECHANICAL
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

II.A MECHANICAL
II.A.1 CLEAN WATER SUPPLY INSTALATION SYSTEM

II.A.2 SANITARY, PIPE & SUPPORTING MATERIAL (FRESH WATER)


II.A.2.4 4th Floor
PPR-PN10 / PEX
1 PPR / PEX dia. 50 mm2 m 8.00 - -
2 PPR / PEX dia. 40 mm2 m 31.00 - -
3 PPR / PEX dia. 32 mm2 m 8.00 - -
4 PPR / PEX dia. 25 mm2 m 12.00 - -
5 PPR / PEX dia. 20 mm2 m 64.00 - -
6 Gate Valve dia. 50 mm2 pcs 2.00 - -
7 Gate Valve dia. 32 mm2 pcs 1.00 - -
Supporting Material
1 Fitting for Pipe - CW lot 1.00 - -
2 Hanger Support - CW lot 1.00 - -

II.A.3 TESTING & COMMISSIONING FRESH WATER INSTALLATION


Pressure Test & Function Test - CW Lot 1.00 - -

( 2.A ) = TOTAL CLEAN WATER SUPPLY INSTALLATION -

II.B.3.2 SEWAGE PIPE & SUPPORTING MATERIAL

II.B.3.7 4th FLOOR


SANITARY
1 Clean Out type Floor dia.4 inch - c/w Avur pcs 11.00 - -
PVC Pipe - AW Class
1 PVC Pipe dia. 100 mm m 29.00 - -
Supporting Material
1 Fitting for Pipe - SW lot 1.00 - -
2 Hanger Support - SW lot 1.00 - -

II.B.3.7 5th FLOOR


SANITARY
1 Clean Out type Floor dia.4 inch - c/w Avur pcs 11.00 - -
PVC Pipe - AW Class
1 PVC Pipe dia. 100 mm m 29.00 - -
Supporting Material
1 Fitting for Pipe - SW lot 1.00 - -
2 Hanger Support - SW lot 1.00 - -

II.B.4 TESTING & COMMISSIONING SEWAGE WATER INSTALLATION


StagnantTest & Function Test - SW Lot 1.00 - -

( 2.B ) = TOTAL SEWAGE WATER INSTALLATION -


RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III

SATUAN KERJA : LPMP SULAWESI SELATAN


TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : MECHANICAL
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

II.C.1 WASTE WATER & VENT INSTALLATION SYSTEM


II.C.3 SANITARY, PIPE & SUPPORTING MATERIAL
II.C.3.4 4th Floor
PVC Pipe - AW Class
1 PVC Pipe dia. 40mm m 15.00 - -
2 PVC Pipe dia. 50mm m 12.00 - -
3 PVC Pipe dia. 65mm m 6.00 - -
4 PVC Pipe dia. 80mm m 26.00 - -
5 PVC Pipe dia. 100mm m 19.00 - -
Vent
1 PVC Pipe dia. 32mm m 92.00 - -
Supporting Material
1 Fitting for Pipe - WW lot 1.00 - -
2 Hanger Support - WW lot 1.00 - -

II.C.3.4 5th Floor


PVC Pipe - AW Class
1 PVC Pipe dia. 40mm m 15.00 - -
2 PVC Pipe dia. 50mm m 12.00 - -
3 PVC Pipe dia. 65mm m 6.00 - -
4 PVC Pipe dia. 80mm m 26.00 - -
5 PVC Pipe dia. 100mm m 19.00 - -
Vent
1 PVC Pipe dia. 32mm m 92.00 - -
Supporting Material
1 Fitting for Pipe - WW lot 1.00 - -
2 Hanger Support - WW lot 1.00 - -

II.C.4 TESTING & COMMISSIONING WATER INSTALLATION


Stagnant Test & Function Test - SW Lot 1.00 - -

( 2.C ) = TOTAL WASTE WATER INSTALLATION -


II.E FIRE FIGHTING INSTALATION SYSTEM

II.E.1 PIPING IN BUILDING


1 Riser (Pipa Tegak) Black steel pipe sch 40 dia. 150 mm (hydrant & sprinkler) m 72.00 - -
Supporting Material
1 Fitting for Pipe - FF lot 1.00 - -
2 Hanger Support - FF lot 1.00 - -

II.E.2 1st Floor


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 3.00 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 4.00 - -
Class ABC 6 Kg c/w include Bracket

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100 mm (Pipa tegak pada tangga darurat) m 35.00 - -
2 Black steel pipe sch 40 dia. 100 mm m 14.00 - -
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III

SATUAN KERJA : LPMP SULAWESI SELATAN


TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : MECHANICAL
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

3 Black steel pipe sch 40 dia. 80 mm m 30.00 - -


4 Black steel pipe sch 40 dia. 65mm m 41.00 - -
5 Black steel pipe sch 40 dia. 40mm m 4.00 - -

VALVE
1 Gate Valve diameter 4" 16k unit 1.00 - -
2 Landing Valve diameter 2 1/2" 16k unit 2.00 - -
3 Siamesse Connection unit 1.00 - -
Supporting Material
1 Fitting for Pipe - FF lot 1.00 - -
2 Hanger Support - FF lot 1.00 - -

II.E.3 2nd Floor


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 3.00 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 4.00 - -
Class ABC 6 Kg c/w include Bracket

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100 mm m 14.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 18.00 - -
3 Black steel pipe sch 40 dia. 65mm m 66.00 - -
4 Black steel pipe sch 40 dia. 40mm m 6.00 - -

VALVE
1 Gate Valve diameter 4" 16k unit 1.00 - -
2 Landing Valve diameter 2 1/2" 16k unit 2.00 - -
Supporting Material
1 Fitting for Pipe - FF lot 1.00 - -
2 Hanger Support - FF lot 1.00 - -

II.E.4 3rd Floor


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 3.00 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 4.00 - -
Class ABC 6 Kg c/w include Bracket
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III

SATUAN KERJA : LPMP SULAWESI SELATAN


TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : MECHANICAL
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100 mm m 14.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 18.00 - -
3 Black steel pipe sch 40 dia. 65mm m 66.00 - -
4 Black steel pipe sch 40 dia. 40mm m 6.00 - -

VALVE
1 Gate Valve diameter 4" 16k unit 1.00 - -
2 Landing Valve diameter 2 1/2" 16k unit 2.00 - -
Supporting Material
1 Fitting for Pipe - FF lot 1.00 - -
2 Hanger Support - FF lot 1.00 - -

II.E.5 4th Floor


EQUIPMENT
1 Indoor Hydrant Box 1200x800x200mm c/w: unit 3.00 - -
Box Hydrant Type. B
a. Material utama
- Box Hydrant type. B
- Selang dia. 1.1/2" x 30 mtr
- Nozle dia. 1.1/2"
- Hose Rack dia. 1.1/2"
- Hydrant Valve dia. 1.1/2"
- Hydrant Valve dia. 2.1/2"
b. Material bantu
- Include box support
- Moor + Baut + Packing + Seal tape dll
2 Fire Extinguisher Dry chemical type ABC unit 4.00 - -
Class ABC 6 Kg c/w include Bracket
3 Head Sprinkler unit 47.00 - -

HYDRANT PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 100 mm m 30.00 - -
2 Black steel pipe sch 40 dia. 80 mm m 53.00 - -
3 Black steel pipe sch 40 dia. 65mm m 16.00 - -
4 Black steel pipe sch 40 dia. 40mm m 4.00 - -
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III

SATUAN KERJA : LPMP SULAWESI SELATAN


TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : MECHANICAL
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

SPRINKLER PIPE - Black Steel Pipe Sch 40


1 Black steel pipe sch 40 dia. 80 mm m 38.00 - -
2 Black steel pipe sch 40 dia. 65mm m 22.00 - -
3 Black steel pipe sch 40 dia. 50mm m 48.00 - -
4 Black steel pipe sch 40 dia. 40mm m 10.00 - -
5 Black steel pipe sch 40 dia. 32 mm m 49.00 - -
6 Black steel pipe sch 40 dia. 25mm m 165.00 - -
7 Black steel pipe sch 40 dia. 25 mm (for drain) m 36.00 - -
VALVE
1 Gate Valve diameter 4" 16k unit 1.00 - -
2 BCV 3" unit 1.00 - -
3 Signal Butterfly valve 3" 16k unit 1.00 - -
4 Landing Valve diameter 2 1/2" 16k unit 2.00 - -
5 Gate Valve diameter 1" 16k unit 3.00 - -
6 Sight Glass unit 1.00 - -
7 Flow switch Dia. 3" unit 1.00 - -
8 Pressure Gauge + Valve unit 2.00 - -
Supporting Material
1 Fitting for Pipe - FF lot 1.00 - -
2 Hanger Support - FF lot 1.00 - -
TESTING & COMMISIONING FIRE FIGHTING (stagnan test) lot 1.00 - -
( 2.E ) = TOTAL FIRE FIGHTING INSTALATION -
II. F AIR CONDITIONING & FAN
II. F. 2 INDOOR / OUTDOOR SINGLE AC:
II. F. 2.4 4th Floor (AC Single)
1 I.U L4-S1 unit 1.00 - -
Model : Wall Mounted
Total Capacity : 5000 BTU/Hr
2 INSTALLATION
- Refrigrant Pipe include isolation 1" m 15.00 - -
- Drain Pipe Dia. 20 mm include isolation m 15.00 - -
- Socket outlet AC unit 1.00 - -
- Installation Cable Power NYM 3x2.5 mm (Indoor & Outdoor) in conduit pipe point 1.00 -
- Support material Indoor, Outdoor & Testing Commisioning lot 1.00 -
II. F. 5 4th floor
AC VRV / VRF
II. F. 5. 1 OUTDOOR :
1 OU. L.4 Total Capacity 362000 BTU/Hr unit 1.00 - -
II. F. 5. 2 INDOOR :
1 IU:L4-1/2/5/6/7/8
Model Ceilling Mounted Cassette Round Flow / 4 way unit 6.00 - -
Total Capacity 47800 BTU/Hr
2 IU:L4-3/4
Model Ceilling Mounted Cassette Round Flow / 4 way unit 2.00 - -
Total Capacity 30700 BTU/Hr
3 IU:L4-9/12
Model Wall Mounted unit 2.00 - -
Total Capacity 15400 BTU/Hr
4 IU:L4-10/11
Model Wall Mounted unit 2.00 - -
Total Capacity 12300 BTU/Hr
5 IU:L4-13
Model Ceilling Mounted Cassette Round Flow / 4 way unit 1.00 - -
Total Capacity 30700 BTU/Hr
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III

SATUAN KERJA : LPMP SULAWESI SELATAN


TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : MECHANICAL
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

II. F. 5. 3 ACCESSORIES
1 Refnet Branch Accessories kit & Installation unit 13.00 - -
2 Wire Remote Control include cabeling installation unit 13.00 - -

II. F. 5. 4 Refrigrant, duct, cabeling Installation


System L4
Refrigrant pipe ASTM B280 include isolation 1"
1 Piping ¼" m 20.00 - -
2 Piping ⅜" m 118.00 - -
3 Piping ½" m 35.00 - -
4 Piping ⅝" m 89.00 - -
5 Piping ¾" m 10.00 - -
6 Piping ⅞" m 80.00 - -
7 Piping 1⅛" m 16.00 - -
8 Piping 1⅜" m 1.00 - -
9 Piping 1⅝" m 61.00 - -

Cabeling, Drain & Accessories


1 Pipa drain lengkap dengan isolasi tebal 3/8" lot 1.00 - -
2 Kabel Kontrol Outdoor Indoor + Power Indoor & Outdoor + Remote Lokal lot 1.00 - -
3 Kabel Power Outdoor NYY 4x25 mm² m 20.00 - -
4 Material Bantu, gantungan Pipa, Dudukan Outdoor Dan Gantungan Indoor lot 1.00 - -
5 Penambahan refrigrant kg 39.00 -
6 Testing Commisioning lot 1.00 - -

( 2.F ) = TOTAL AIR CONDITIONING -


II.G VENTILATION FAN
II.G.4 4th Floor
II.G.4.1 Ventilation Fan Include instalation cable in conduit pipe & Accessories
1 EF.4.1 Unit 1.00 - -
Model : Duct Inline Centrifugal Fan
Total Capacity : 1500 CMH

2 EF.4.2/4.4 Unit 2.00 - -


Model : Wall Mounted Exhaust Fan
Total Capacity : 640 CMH

3 EF.4.3 Unit 1.00 - -


Model : Wall Mounted Exhaust Fan
Total Capacity : 265 CMH

II.G.4.2 Flexible Round Duct, PVC


gantungan/hanger/support dan aksesories lainnya :

PVC Duct Include Isolation 3/8 inch thickness


1 Dia. 150 mm m 30.00 - -

PU Duct
1 Pu Duct m² 7.00 - -

Exhaust/Supply / Air Grille/Volume Damper dipowder coating


1 Exhaust Air Louver 400x400 mm unit 1.00 - -
2 Support material & Testing Commisioning lot 1.00 - -

( 2.F ) = TOTAL AIR CONDITIONING & EXHAUST FAN -

TOTAL MECHANICAL -
RENCANA ANGGARAN BIAYA
RENOVASI GEDUNG KANTOR LPMP SULAWESI SELATAN TAHAP III

SATUAN KERJA : LPMP SULAWESI SELATAN


TAHUN ANGGARAN : 2021
LOKASI : JL. A. P. PETTARANI, KOTA MAKASSAR
PEKERJAAN : MECHANICAL
HARGA SAT. TOTAL HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )

III.A ELECTRICAL
III.A.1 LOW VOLTAGE
1 PP.Pump Room unit 1.00 - -
III.A.2 CABLE FEEDER INSTALATION FROM LVMDP TO :
1 PP.Pump Room NYY 4 x 10 mm² m 85.00 - -
III.A.3 Cable feeder instalation PP. Pompa to :
1 PC. Transfer For RW NYY 4 x 4 mm² m' 10.00 - -
III.A.5 Pump Room Cable Ladder
Electrical Ladder
III.A.6 Grounding Electrical Pump Room
1 BCC 70 mm² m 25.00 - -
Grounding Installation Panel TR (Resistansi Max 2 Ohm) set 1.00 - -
- Copper Rod dia 5/8 "
- Excavation & Backfilling
- Box Control 400 X 400 X 400 mm3
- Terminal Busbar 150x100x15 mm3
III.A.7 Pump Room Lighting
Lighting Fixtures & Installation
1 TL LED 1x16W pcs 2.00 - -
2 Industrial Fan 1000 CMH pcs 1.00 - -
3 Installation Cable NYM 3 x 1.5 mm² in Hi-Impact conduit pipe point 3.00 - -
4 Lighting Accessories, Hanger Support, etc lot 1.00 - -
Switch Fixtures & Installation
1 Double Switch pcs 1.00 - -
Socket Outlet Fixtures & Installation
1 Socket Outlet 200 VA (10A) 1 Phasa Type Wall pcs 1.00 - -
2 Installation Cable NYM 3 x 2.5 mm² for Socket Outlet 200 VA Hi-Impact conduit pipe point 1.00 - -
3 Continue, Megger, Grounding & Function Test - EL lot 1.00 - -
III.A.8 TESTING & COMMISSIONING ELECTRICAL INSTALLATION
Continue, Megger, Grounding & Function Test - EL Lot 1.00 - -

( 3.A ) = TOTAL ELECTRICAL INFRASTRUKTUR -


III.B MECHANICAL
III.B.1 CLEAN WATER SUPPLY INSTALATION SYSTEM
1 Relokasi Transfer Pump unit 1.00 -

2 Transfer Pump unit 1.00 - -


Type Pompa : End Suction Closed coupled
: Multistage Pump (CM)
Capacity min : 1x120 liter/minute
Head : ± 40 Meter
Electric drive : 3 x 380 Volt
: 50 Hz
: 2 x 2.2 kw
c/w standard control panel : Operating system paralel alternate set 1.00 - -
: 2 x 2.2 kw
: 50 hz
: indoor position
Sudah lengkap dengan Pondasi,base Frame, Motor, dan Panel kontrol otomatis

III.B.5 PEKERJAAN PEMIPAAN, FITTING DAN VALVE-VALVE


a. Ruang Pompa Transfer Pump Air bersih
Bahan Pipa : PPR-PN 10
Minimum Tekanan Kerja Pada Pemipaan dan Valve - Valve 10 bar
- Pemipaan
Diameter Pipa : ØOD63 mm ( Pipa PT.1A & PT.1B ) m 18.00 - -
: Ø100 mm ( Pipa Overflow ) m 14.00 - -
: ØOD63 mm ( Pipa Dari PDAM ) m 40.00 - -

Header 2 mtr : Ø100 mm set 2.00 - -


Flange 10k, Ø100 mm Lengkap Dengan Bolt & Nut Set 1.00 - -

- Fitting fitting, TEE, Elbow, Reducer, Penggantung Lot 1.00 - -


Penyangga Pipa, Pondasi Pipa, dll

- Valve-Valve 10K
Butterfly Valve : Ø50 mm ( Pipa PT.1A & PT.1B ) Buah 5.00 - -
Y Strainer ( ST ) : Ø50 mm ( Pipa PT.1A & PT.1B ) Buah 2.00 - -
Check Valve ( CV ) : Ø50 mm ( Pipa PT.1A & PT.1B ) Buah 2.00 - -
Flexible Rubber Joint : Ø50 mm ( Pipa PT.1A & PT.1B ) Buah 4.00 - -
Foot Valve + Saringan: : Ø65 mm Buah 2.00 - -
Pressure gauge+Valve Buah 4.00 - -
Water Hammer Arrester : Ø50 mm Buah 1.00 -
Floating Valve : Ø50 mm Buah 2.00 - -

Water Level Control ( WLC ) lot 1.00 -


pada Ground Water Tank (GWT) Termasuk Penarikan kabel Dari Control Panel Pompa ke GWT

b Pemipaan air bersih dari GWT ke Gedung Utama


PPR-PN 10 : ØOD63 mm m 145.00 - -
c Pemipaan air bersih dari sumur ke GWT
PPR-PN 10 : ØOD63 mm m 58.00 - -
III.B.6 TESTING & COMMISSIONING INSTALLATION
Pressure Test & Function Test - CW Lot 1.00 - -
( 3.B ) = TOTAL CLEAN WATER SUPPLY INSTALATION SYSTEM -
III.C FIRE FIGHTING INSTALATION SYSTEM
III.C.1 MAIN EQUIPMENT IN PUMP ROOM

III.C.2 Instalasi pipa utama dengan pipa Black steel Sch. 40


termasuk fitting dan aksesoriesnya :
1 Piping in pump room
- dia. 350 mm Suction Header include Blank flange set 1.00 -
- dia. 200 mm m 18.00 - -

2 Valve & Accessories


Gate Valve OS & Y class 16K :
- dia. 200 mm unit 2.00 - -

3 Foot Valve + Filter


- dia. 200 mm unit 2.00 - -
III.C.4 PEMIPAAN MENUJU GEDUNG
1 Black steel pipe sch 40 dia. 250 mm m 145.00 - -
2 Black steel pipe sch 40 dia. 150 mm m 18.00 - -
Supporting Material
1 Fitting for Pipe - CW lot 1.00 - -
2 Hanger Support - CW lot 1.00 - -
VALVE
1 Main Control Valve 6" c/w trimset & gong 1 1.00 - -
2 Gate Valve dia. 150 mm unit 2.00 - -
3 Black steel pipe sch 40 dia. 350 mm Header include Blank flange set 1.00 -

III.C.5 TESTING & COMMISSIONING INSTALLATION


Pressure Test & Function Test - CW Lot 1.00 -

( 2.C ) = TOTAL FIRE FIGHTING INSTALATION -

(2.A~3.D) = TOTAL ELECTRICAL & ELECTRONIC -


DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,PLUMBING & ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO URAIAN HARGA SATUAN

A. DAFTAR UPAH
1 Pekerja hari
2 Tukang pipa hari
3 Tukang listrik hari
4 Tukang AC hari
5 Kepala tukang AC hari
6 Kepala tukang listrik hari
7 Kepala tukang pipa hari
8 Mandor hari

B. PEKERJAAN ELEKTRIKAL :
Kabel NYY - 0,6/ 1 kV - SNI,04-02701 - SPLN 43-1 - IEC 60502-1
1 4 x 6 mm² m'
2 4 x 10 mm² m'
3 4 x 16 mm² m'
4 4 x 25 mm² m'
5 4 x 150 mm² m'
Kabel NYM - 300/500 Volt - SNI,04-02699 - SPLN 42-2 - IEC 227-4
1 3 x 1,5 mm² m'
2 3 x 2,5 mm² m'
Kabel NYMHY - 300/500 Volt - SNI 04 - 3234 - SPLN 42-6-2
1 3 x 0,75 mm² m'
2 3 x 1 mm² m'
3 3 x 1,5 mm² m'
4 3 x 2,5 mm² m'
Kabel NYMHY - 300/500 Volt - SNI 04 - 3234 - SPLN 42-6-2
1 2 x 0,75 mm² m'
2 2 x 1 mm² m'
3 2 x 1,5 mm² m'
4 2 x 2,5 mm² m'
Kabel BCC
1 BCC 70 mm2 (0,7 kg/m) m'
2 BCC 95 mm2 (0,95 kg/m) m'
3 BCC 120 mm2 (1,2 kg/m) m'

LIGHTING
1 RC091V LED36S 40 W PSU W30L120 GM G2 unit
2 WT188C LED20 CW L1200 PSU /6500K unit
3 DN393B LED22-840 PSU D200 ALU unit
4 DN027B LED15/CW D175 RD unit
5 DN027B LED20/CW D200 RD unit
6 EX-LED-M (LED Emergency EXIT sign C/W High Temp) unit
7 31097 TrunkLinea 13W 6500K wall lamp LED unit
8 Occuswitch unit
9 BGP161 LED25NW PSU 220-240V 7043 unit
10 Sensor Cahaya Photo Cell Din Rel KlarStern KS3110 unit
11 Recessed Mounted RM 300 LED TL.2x18 Watt ACR Prismatic unit
12 Emergency twin spotlight 2x20W unit
13 GMS TP 2x36 watt unit
14 BL CG LED 1x16 WATT unit
15 Stop Kontak 200 VA unit
16 Stop Kontak Type floor unit
17 Saklar Ganda unit
18 Saklar Tunggal unit
19 Hotel Switch unit
20 Grid Switch 6 Gang unit
21 Grid Switch 8 Gang unit

Bahan ME - page 15 of 54
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,PLUMBING & ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO URAIAN HARGA SATUAN

KABEL TRAY
T = 50 mm
1 Kabel Tray L = 100 mm m'
2 Kabel Tray L = 150 mm m'
3 Kabel Tray L = 200 mm m'
4 Kabel Tray L = 300 mm m'

KABEL LADDER
T = 100 mm
1 Kabel Ladder L = 100 mm m'
2 Kabel Ladder L = 150 mm m'
3 Kabel Ladder L = 200 mm m'
4 Kabel Ladder L = 300 mm m'
5 Kabel Ladder L = 400 mm m'
6 Kabel Ladder L = 500 mm m'
7 Kabel Ladder L = 600 mm m'
8 Kabel Ladder L = 700 mm m'

PANEL TM
1 Arester unit
2 Metering unit

MCB 1 Phasa, 6 Ka
1 MCB 2A, 1 ph, 6 kA unit
2 MCB 4A, 1 ph, 6 kA unit
3 MCB 6A, 1 ph, 6 kA unit
4 MCB 10A, 1 ph, 6 kA unit

RCBO 1 Phasa
1 RCBO 6A, 1 Ph unit
2 RCBO 10A, 1 Ph unit
3 RCBO 16A, 1 Ph unit

MCCB 3 Phasa, 10 Ka
1 MCCB 15A, 3 ph, 10 kA unit
2 MCCB 20A, 3 ph, 10 kA unit
3 MCCB 25A, 3 ph, 10 kA unit
4 MCCB 30A, 3 ph, 10 kA unit
5 MCCB 40A, 3 ph, 10 kA unit
6 MCCB 50A, 3 ph, 10 kA unit

MCCB 3 Phasa, 18 Ka
4 MCCB 30A, 3 ph, 18 kA unit
5 MCCB 40A, 3 ph, 18 kA unit
6 MCCB 50A, 3 ph, 18 kA unit
7 MCCB 60A, 3 ph, 18 kA unit

MCCB 3 Phasa, 25 kA
5 MCCB 225A, 3 ph, 25 kA unit
6 MCCB 250A, 3 ph, 25 kA unit

Bahan ME - page 16 of 54
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,PLUMBING & ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO URAIAN HARGA SATUAN


1 MCCB 3 Phasa, Micrologic 70 Ka (motor mechanism module)
2 ACB 252-630A, 70 kA unit
3 ACB 320-800A, 70 kA unit
4 ACB 400-1000A, 70 kA unit
5 ACB 500-1250A, 70 kA unit
6 ACB 640-1600A, 70 kA unit
7 ACB 2500A, 85 kA unit
8 Ampere Meter unit
9 Volt Meter unit
LIGHTNING PROTECTION
Power Panel TR
1 Copper Rod 5/8 "
2 BC. 70 mm2
3 Box Control 400x400x400 mm3
B. PEKERJAAN FIRE ALARM :
24 Terminal Box pcs
25 Horn and Strobe pcs
26 Manual Break Glass pcs
27 Rate of Rise Heat Detector Addressable pcs
28 Smoke Detector Addressable pcs
29 ROR Konvensional pcs
30 Smoke Detector Konvensional pcs
31 Telephone Jack pcs
32 End of Line pcs
C. PEKERJAAN PUBLIC ADDRESS & GENERAL ANNOUNCEMENT :
ANALOG PAGA
1 Volume Control 36 Watt unit
2 Volume Control 30 Watt unit
3 Wall Speaker 20 WATT unit
4 Ceilling Speaker 3 WATT unit
5 Wall Box Speaker 6 Watt unit
6 Horn Speaker 15 Watt c/w matching unit

D. PEKERJAAN SYSTEM INTEGRASI:


1 Optical Network Unit (ONU) 24 port unit
2 PoE Injector 24 ports FE unit
3 Optical Terminal Box unit
4 Passive Optical Splitter 4 port unit
5 Kabel Fiber Optic 4 core Singlemode 9 um unit
6 Patch Cord FO SC-SC 1 Core unit
7 Patch Panel UTP Cat. 6 kap. 48 port unit
8 Patch Cord UTP Cat . 6 panjang 1 meter unit
9 Patch Cord UTP Cat . 6 panjang 3 meter unit
10 Outlet IP TV unit
11 Outlet Telepon unit
12 Outlet Data unit
13 IP CCTV 2MP Dome, PoE unit
14 IP CCTV 2MP Fixed, PoE unit
15 IP CCTV 2MP Dome Lift, PoE unit
16 Wifi Access Point unit
17 IPTV Set Top Box c/w HDMI Cable unit
18 Pesawat IP Phone unit
19 Fiber Optic Installation + Conduit Instalation (Inc PVC) unit
20 Fiber Optic Termination unit
21 UTP Installation + Conduit Installation (Inc UTP Cat6 Cable+PVC) unit
22 UTP Termination + Pengukuran unit
23 Wiring Management unit
24 Rack Wall Mounted 19" 9U unit

Bahan ME - page 17 of 54
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,PLUMBING & ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO URAIAN HARGA SATUAN

B. PEKERJAAN PLUMBING

1 Transfer Pump Multistage 120 lpm unit


2 WTP Pump 125 lpm head 40 m unit
3 Transfer Pump Control Panel unit
4 Packaged Booster Pump 5 m3/h ( 2 pump) unit
5 Distribution Pump 15 m³/Hr unit
6 Packaged Booster Pump 10 m³/Hr unit
7 Diesel Fire Pump Cap. 750 GPM unit
8 Diesel Fire Pump Control Panel unit
9 Electric Fire Pump Cap. 750 GPM unit
10 Electric Fire Pump Control Panel unit
11 Jockey Fire Pump 38 GPM unit

PIPA PVC
1 Pipa PVC klas AW dia. 1/2" m'
2 Pipa PVC klas AW dia. 3/4" m'
3 Pipa PVC klas AW dia. 1" m'
4 Pipa PVC klas AW dia. 1.1/4" m'
5 Pipa PVC klas AW dia. 1. 1/2" m'
6 Pipa PVC klas AW dia. 1.3/4" m'
7 Pipa PVC klas AW dia. 2" m'
8 Pipa PVC klas AW dia. 2.1/2" m'
9 Pipa PVC klas AW dia. 3" m'
10 Pipa PVC klas AW dia. 4" m'
11 Pipa PVC klas AW dia. 5" m'
12 Pipa PVC klas AW dia. 6" m'

PIPA GIP-A
9 Pipa GIP Medium - A dia. 4" m'

PIPA BS-40
1 Pipa BS-SC.40 dia. 1/2" m'
2 Pipa BS-SC.40 dia. 3/4" m'
3 Pipa BS-SC.40 dia. 1" m'
4 Pipa BS-SC.40 dia. 1.1/4" m'
5 Pipa BS-SC.40 dia. 1.1/2" m'
6 Pipa BS-SC.40 dia. 2" m'
7 Pipa BS-SC.40 dia. 2.1/2" m'
8 Pipa BS-SC.40 dia. 3" m'
9 Pipa BS-SC.40 dia. 4" m'
10 Pipa BS-SC.40 dia. 5" m'
11 Pipa BS-SC.40 dia. 6" m'
12 Pipa BS-SC.40 dia. 8" m'
13 Pipa BS-SC.40 dia. 10" m'

PIPA PN-10
1 Pipa PN-10 dia. 1/2" m'
2 Pipa PN-10 dia. 3/4" m'
3 Pipa PN-10 dia. 1" m'
4 Pipa PN-10 dia. 1.1/4" m'
5 Pipa PN-10 dia. 1.1/2" m'
6 Pipa PN-10 dia. 2" m'
7 Pipa PN-10 dia. 2.1/2" m'
8 Pipa PN-10 dia. 3" m'
9 Pipa PN-10 dia. 4" m'
10 Pipa PN-10 dia. 5" m'

Bahan ME - page 18 of 54
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,PLUMBING & ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO URAIAN HARGA SATUAN

GATE VALVE
1 Gate Valve dia. 1/2" 10K bh
2 Gate Valve dia. 3/4" 10K bh
3 Gate Valve dia. 1" 10K bh
4 Gate Valve dia. 1.1/4" 10K bh
5 Gate Valve dia. 1.1/2" 10K bh
6 Gate Valve dia. 2" 10K bh

BUTTERFLY VALVE
1 Butterfly Valve dia. 2" 10K bh
2 Butterfly Valve dia. 2.1/2" 10K bh

GATE VALVE HYDRANT & SPRINGKLER


1 Gate Valve dia. 1/2" 16K bh
2 Gate Valve dia. 3/4" 16K bh
3 Gate Valve dia. 1"16K bh
4 Gate Valve dia. 1.1/4" 16K bh
5 Gate Valve dia. 1.1/2" 16K bh
6 Gate Valve dia. 2" 16K bh
7 Gate Valve dia. 2.1/2" 16K bh
8 Gate Valve dia. 3" 16K bh
9 Gate Valve dia. 4" 16K bh
10 Gate Valve dia. 5" 16K bh
11 Gate Valve dia. 6" 16K bh
12 Gate Valve dia. 8" 16K bh
13 Gate Valve dia. 10" 16K bh
14 Safety Valve dia. 4" 16K bh
15 Main Control Valve bh
16 Branch Control Valve (BCV) dia.4" bh

CHECK VALVE
1 Check Valve dia. 1.1/2" 10K bh
2 Check Valve dia. 2" 10K bh

GATE VALVE HYDRANT & SPRINGKLER


1 Check Valve dia. 2.1/2" 16K bh
Check Valve dia. 8" 16K bh

STRAYNER P.AB & HYDRANT & SPRINGKLER


1 Strainer dia. 2" 16K bh
2 Strainer dia. 2.1/2" 16K bh

FLEXIBLE JOIN P.AB & HYDRANT & SPRINGKLER


1 Flexible Joint dia. 2" 16K bh
6 Flexible Joint dia. 6" 16K bh
7 Flexible Joint dia. 8" 16K bh

FOOT VALVE P.AB & HYDRANT & SPRINGKLER


1 Foot Valve dia. 2.1/2" 16K bh
6 Foot Valve dia. 8" 16K bh

Bahan ME - page 19 of 54
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,PLUMBING & ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO URAIAN HARGA SATUAN


PEKERJAAN HYDRANT & SPRINGKLER
1 Pressure Gauge + Valve bh
2 Pressure Switch bh
3 Flow Switch 4" bh
4 Box Hydrant Type. A bh
5 Apar 6 Kg bh
6 Apar 3 Kg bh
7 Pillar Hydrant bh
8 Siamese Conection bh
9 Head Sprinkler bh
10 Sight Glass 1" bh
11 Safety Valve 4" bh
12 Flow Meter bh
13 Level Switch bh
14 Float Valve bh

SEWAGE TREATMENT PLANT BIO


1 Clean Out dia 4" bh
2 Clean Out dia 6" bh

B. PEKERJAAN VAC :
AC VRV/VRF
1 Outdoor Unit Cap. 362000 BTU/Hr unit
2 Indoor Unit Cassete Round Flow Cap. 30700 BTU/Hr unit
3 Indoor Unit Cassete Round Flow Cap. 38200 BTU/Hr unit
4 Indoor Unit Cassete Round Flow Cap. 54600 BTU/Hr unit
5 Indoor Unit Cassete Round Flow Cap. 47800 BTU/Hr unit
6 Indoor Unit Cassete Double Flow Cap. 24200 BTU/Hr unit
7 Indoor Unit Wall Mounted Cap. 12300 BTU/Hr unit
8 Indoor Unit Wall Mounted Cap. 15400 BTU/Hr unit
AC SINGLE
1 Indoor + Outdoor 0,5 PK Split Wall Mounted R410 unit

Pipa AC
kelas ASTM B280 ; 99 (Seamless Cooper Tube for AC and Refrigerant Field Service)
1 Refrigerant Pipe Dia. 1/4" m'
2 Refrigerant Pipe Dia. 3/8" m'
3 Refrigerant Pipe Dia. 1/2" m'
4 Refrigerant Pipe Dia. 5/8" m'
5 Refrigerant Pipe Dia. 3/4" m'
6 Refrigerant Pipe Dia. 7/8" m'
7 Refrigerant Pipe Dia. 1" m'
8 Refrigerant Pipe Dia. 1 1/8" m'
9 Refrigerant Pipe Dia. 1 2/8" m'
10 Refrigerant Pipe Dia. 1 3/8" m'
11 Refrigerant Pipe Dia. 1 4/8" m'
12 Refrigerant Pipe Dia. 1 5/8" m'
13 Refrigerant Pipe Dia. 2 1/8" m'

Ducting Polyurethane Panel


1 Polyurethane Panel m2
2 Accessories Polyurethane Panel m2

Bahan ME - page 20 of 54
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 M' KABEL NYY 4 X 6 mm2


KABEL NYY 4 X 6 mm2 M' 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' KABEL NYY 4 X 10 mm2


KABEL NYY 4 X 10 mm2 M' 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' KABEL NYY 4 X 16 mm2


KABEL NYY 4 X 16 mm2 M' 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' KABEL NYY 4 X 25 mm2


KABEL NYY 4 X 25 mm2 M' 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' KABEL NYY 4 X 150 mm2


KABEL NYY 4 X 150 mm2 M' 1.00 Rp -
Mandor OH 0.03 Rp -
Kepala Tukang listrik OH 0.05 Rp -
Tukang OH 0.05 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' KABEL NYMHY 3 X 2.5 mm2


KABEL NYMHY 3 X 2.5 mm2 M' 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 21 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 M' KABEL STP AWG 18


KABEL STP AWG 18 M' 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' KABEL BCC 70 mm2


KABEL BCC 70 mm2 M' 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Emergency twin spotlight 2x20W


Emergency twin spotlight 2x20W bh 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.04 Rp -
Tukang OH 0.04 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 BH Grid Switch 6 Gang
Grid Switch 6 Gang bh 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Grid Switch 8 Gang


Grid Switch 8 Gang bh 1.00 Rp -
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.03 Rp -
Tukang OH 0.03 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 Unit Grounding TR
Copper Rod 5/8 " bh 3.00 Rp -
Box Control 400 x 400 x 400 mm bh 1.00 Rp -
Accessories, terminal, connector, scun cable ls 1.00 Rp -
Upah Pasang
Mandor OH 1.00 Rp -
Kepala Tukang listrik OH 1.00 Rp -
Pekerja OH 3.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 22 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 UNIT PANEL SDP


MCCB 225A, 3 ph, 25 kA bh 1.00 Rp -
MCCB 25A, 3 ph, 10 kA bh 4.00 Rp -
MCCB 40A, 3 ph, 10 kA bh 3.00 Rp -
MCCB 15A, 3 ph, 10 kA bh 5.00 Rp -
MCCB 30A, 3 ph, 10 kA bh 1.00 Rp -
Selector Switch M-O-A 2P bh 1.00 Rp -
Pilot Lamp bh 3.00 Rp -
Fuse & Indicator bh 3.00 Rp -
Arresster bh - Rp -
Box Panel IP 66 ( 180 x 80 x 60 ) cm Unit 2.00 Rp -
Cabeling Ls 1.00 Rp -
Material Bantu Ls 1.00 Rp -
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duct Kabel
-Mur Baut
Mandor OH 2.00 Rp -
Kepala Tukang listrik OH 5.00 Rp -
Tukang Listrik OH 5.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 UNIT PANEL LP
MCCB 25A, 3 ph, 10 kA bh 1.00 Rp -
MCB 6A, 1 ph, 6 kA bh 29.00 Rp -
RCBO 10A, 1 Ph bh - Rp -
Selector Switch M-O-A 2P bh 1.00 Rp -
Pilot Lamp bh 3.00 Rp -
Fuse & Indicator bh 3.00 Rp -
Box Panel IP 66 ( 80 x 60 x 20 ) cm Unit 1.00 Rp -
Cabeling Ls 1.00 Rp -
Material Bantu Ls 1.00 Rp -
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duct Kabel
-Mur Baut
Mandor OH 2.00 Rp -
Kepala Tukang listrik OH 5.00 Rp -
Tukang Listrik OH 5.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 23 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 UNIT PANEL PP
MCCB 30A, 3 ph, 18 kA bh 1.00 Rp -
MCB 10A, 1 ph, 6 kA bh 25.00 Rp -
ELCB bh - Rp -
Ampere Meter bh 3.00 Rp -
Volt Meter bh 3.00 Rp -
Selector Switch M-O-A 2P bh 1.00 Rp -
Pilot Lamp bh 3.00 Rp -
Fuse & Indicator bh 3.00 Rp -
Box Panel IP 66 ( 80 x 60 x 20 ) cm Unit 1.00 Rp -
Cabeling Ls 1.00 Rp -
Material Bantu Ls 1.00 Rp -
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duct Kabel
-Mur Baut
Mandor OH 2.00 Rp -
Kepala Tukang listrik OH 5.00 Rp -
Tukang Listrik OH 5.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 UNIT PANEL PP IU AC
MCCB 20A, 3 ph, 10 kA bh 1.00 Rp -
MCB 6A, 1 ph, 6 kA bh 15.00 Rp -
Ampere Meter bh 3.00 Rp -
Volt Meter bh 3.00 Rp -
Selector Switch M-O-A 2P bh 1.00 Rp -
Pilot Lamp bh 3.00 Rp -
Fuse & Indicator bh 3.00 Rp -
Box Panel IP 66 ( 80 x 60 x 20 ) cm Unit 1.00 Rp -
Cabeling Ls 1.00 Rp -
Material Bantu Ls 1.00 Rp -
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duct Kabel
-Mur Baut
Mandor OH 2.00 Rp -
Kepala Tukang listrik OH 5.00 Rp -
Tukang Listrik OH 5.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 24 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 UNIT PANEL SDP PUMP


MCCB 50A, 3 ph, 18 kA bh 1.00 Rp -
MCCB 40A, 3 ph, 18 kA bh 7.00 Rp -
Selector Switch M-O-A 2P bh 1.00 Rp -
Pilot Lamp bh 3.00 Rp -
Fuse & Indicator bh 3.00 Rp -
Arresster bh - Rp -
Box Panel IP 66 ( 180 x 80 x 60 ) cm Unit 1.00 Rp -
Cabeling Ls 1.00 Rp -
Material Bantu Ls 1.00 Rp -
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duct kabel
-Duct Kabel
-Mur Baut
Mandor OH 2.00 Rp -
Kepala Tukang listrik OH 5.00 Rp -
Tukang Listrik OH 5.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 TTK TITIK INSTALASI PENERANGAN
Kabel NYM 3x2,5 mm2 M' 12.00 Rp -
Pipa Conduit High Impact M' 10.00 Rp -
Socket Pipa bh 1.00 Rp -
Tee Doos bh 2.00 Rp -
Klem Pipa bh 3.00 Rp -
Fhiser bh 6.00 Rp -
Las Doop bh 2.00 Rp -
Isolasi ban bh 0.25 Rp -
Mandor OH 0.01 Rp -
Kepala Tukang listrik OH 0.09 Rp -
Tukang OH 0.09 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 TTK TITIK INSTALASI STOP KONTAK


Kabel NYM 3x2,5 mm2 M' 15.00 Rp -
Pipa Conduit High Impact M' 12.00 Rp -
Socket Pipa bh 1.00 Rp -
Tee Doos bh 2.00 Rp -
Klem Pipa bh 3.75 Rp -
Fhiser bh 6.00 Rp -
Las Doop bh 2.00 Rp -
Isolasi ban bh 0.25 Rp -
Mandor OH 0.01 Rp -
Kepala Tukang listrik OH 0.14 Rp -
Tukang OH 0.14 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 25 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 TTK TITIK INSTALASI DAYA INDOOR UNIT AC


Kabel NYM 3 x 4 mm2 M' 20.00 Rp -
Pipa Conduit M' 18.00 Rp -
Socket Pipa bh 1.00 Rp -
Tee Doos bh 2.00 Rp -
Klem Pipa bh 5.00 Rp -
Fhiser bh 6.00 Rp -
Las Doop bh 2.00 Rp -
Isolasi ban bh 0.25 Rp -
Mandor OH 0.01 Rp -
Kepala Tukang listrik OH 0.14 Rp -
Tukang OH 0.14 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 TTK TITIK INSTALASI SPEAKER
Kabel NYMHY 3x1,5 mm2 M' 25.00 Rp -
Pipa Conduit M' 23.00 Rp -
Socket Pipa bh 8.33 Rp -
Tee Doos bh 2.00 Rp -
Klem Pipa bh 37.50 Rp -
Fhiser bh 92.00 Rp -
Las Doop bh 4.60 Rp -
Isolasi ban bh 0.25 Rp -
Tenaga Kerja :
Mandor OH 0.01 Rp -
Kepala Tukang listrik OH 0.14 Rp -
Pekerja OH 0.14 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 TTK Heat Detector Instalation
Kabel NYMHY 2x1,5 mm2 M' 25.00 Rp -
Pipa Conduit M' 23.00 Rp -
Socket Pipa bh 8.33 Rp -
Tee Doos bh 2.00 Rp -
Klem Pipa bh 6.25 Rp -
Fhiser bh 92.00 Rp -
Las Doop bh 4.60 Rp -
Isolasi ban bh 0.25 Rp -
Tenaga Kerja
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.13 Rp -
Pekerja OH 0.13 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 TTK Indicating Lamp
Kabel NYMHY 2x1,5 mm2 M' 50.00 Rp -
Pipa Conduit M' 48.00 Rp -
Socket Pipa bh 16.67 Rp -
Tee Doos bh 2.00 Rp -
Klem Pipa bh 12.50 Rp -
Fhiser bh 192.00 Rp -
Las Doop bh 9.60 Rp -
Isolasi ban bh 0.25 Rp -
Tenaga Kerja
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.13 Rp -
Pekerja OH 0.13 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 TTK Flow Switch Instalation Analisa Harga Satuan ME - page 26 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

Kabel NYMHY 2x1,5 mm2 M' 60.00 Rp -


Pipa Conduit M' 58.00 Rp -
Socket Pipa bh 20.00 Rp -
Tee Doos bh 2.00 Rp -
Klem Pipa bh 15.00 Rp -
Fhiser bh 232.00 Rp -
Las Doop bh 11.60 Rp -
Isolasi ban bh 0.25 Rp -
Tenaga Kerja
Mandor OH 0.02 Rp -
Kepala Tukang listrik OH 0.19 Rp -
Pekerja OH 0.19 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -
1 UNIT TERMINAL BOX 20 PAIRS
Terminal Box 20 Pairs bh 1.00 Rp -
Mandor OH 0.25 Rp -
Tukang listrik OH 0.50 Rp -
Pekerja OH 0.50 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Optical Network Unit (ONU) 24 port


Optical Network Unit (ONU) 24 port bh 1.00 Rp -
Mandor OH 0.50 Rp -
Tukang listrik OH 1.00 Rp -
Pekerja OH 1.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH PoE Injector 24 ports FE


PoE Injector 24 ports FE bh 1.00 Rp -
Mandor OH 0.50 Rp -
Tukang listrik OH 1.00 Rp -
Pekerja OH 1.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Optical Terminal Box


Optical Terminal Box bh 1.00 Rp -
Mandor OH 0.50 Rp -
Tukang listrik OH 1.00 Rp -
Pekerja OH 1.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Passive Optical Splitter 4 port


Passive Optical Splitter 4 port bh 1.00 Rp -
Mandor OH 0.50 Rp -
Tukang listrik OH 1.00 Rp -
Pekerja OH 1.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 27 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 BH Kabel Fiber Optic 4 core Singlemode 9 um


Kabel Fiber Optic 4 core Singlemode 9 um bh 1.00 Rp -
Mandor OH 0.01 Rp -
Tukang listrik OH 0.02 Rp -
Pekerja OH 0.08 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Patch Cord FO SC-SC 1 Core


Patch Cord FO SC-SC 1 Core bh 1.00 Rp -
Mandor OH 0.01 Rp -
Tukang listrik OH 0.02 Rp -
Pekerja OH 0.08 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Patch Panel UTP Cat. 6 kap. 48 port


Patch Panel UTP Cat. 6 kap. 48 port bh 1.00 Rp -
Mandor OH 0.50 Rp -
Tukang listrik OH 1.00 Rp -
Pekerja OH 1.00 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Patch Cord UTP Cat . 6 panjang 1 meter


Patch Cord UTP Cat . 6 panjang 1 meter bh 1.00 Rp -
Mandor OH 0.01 Rp -
Tukang listrik OH 0.02 Rp -
Pekerja OH 0.08 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Patch Cord UTP Cat . 6 panjang 3 meter


Patch Cord UTP Cat . 6 panjang 3 meter bh 1.00 Rp -
Mandor OH 0.01 Rp -
Tukang listrik OH 0.02 Rp -
Pekerja OH 0.08 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Outlet IP TV
Outlet IP TV bh 1.00 Rp -
Mandor OH 0.01 Rp -
Tukang listrik OH 0.02 Rp -
Pekerja OH 0.08 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH IP CCTV 2MP Dome, PoE


IP CCTV 2MP Dome, PoE bh 1.00 Rp -
Mandor OH 0.10 Rp -
Tukang listrik OH 0.20 Rp -
Pekerja OH 0.80 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH IP CCTV 2MP Fixed, PoE


Analisa Harga Satuan ME - page 28 of 54
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

IP CCTV 2MP Fixed, PoE bh 1.00 Rp -


Mandor OH 0.10 Rp -
Tukang listrik OH 0.20 Rp -
Pekerja OH 0.80 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH IP CCTV 2MP Dome Lift, PoE


IP CCTV 2MP Dome Lift, PoE bh 1.00 Rp -
Mandor OH 0.10 Rp -
Tukang listrik OH 0.20 Rp -
Pekerja OH 0.80 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Wifi Access Point


Wifi Access Point bh 1.00 Rp -
Mandor OH 0.10 Rp -
Tukang listrik OH 0.20 Rp -
Pekerja OH 0.80 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH IPTV Set Top Box c/w HDMI Cable


IPTV Set Top Box c/w HDMI Cable bh 1.00 Rp -
Mandor OH 0.10 Rp -
Tukang listrik OH 0.20 Rp -
Pekerja OH 0.80 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Pesawat IP Phone
Pesawat IP Phone bh 1.00 Rp -
Mandor OH 0.10 Rp -
Tukang listrik OH 0.20 Rp -
Pekerja OH 0.80 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH UTP Installation + Conduit Installation (Inc UTP Cat6 Cable+PVC)


UTP Installation + Conduit Installation (Inc UTP Cat6 Cable+PVC)
bh 1.00 Rp -
Mandor OH 0.01 Rp -
Tukang listrik OH 0.02 Rp -
Pekerja OH 0.08 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 29 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 BH UTP Termination + Pengukuran


UTP Termination + Pengukuran bh 1.00 Rp -
Mandor OH 0.01 Rp -
Tukang listrik OH 0.02 Rp -
Pekerja OH 0.08 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Wiring Management
Wiring Management bh 1.00 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Tukang listrik OH 0.02 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Rack Wall Mounted 19" 9U


Rack Wall Mounted 19" 9U bh 1.00 Rp - Rp -
Mandor OH 0.10 Rp - Rp -
Tukang listrik OH 0.20 Rp - Rp -
Pekerja OH 0.80 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Terminal Box
Terminal Box bh 1.00 Rp - Rp -
Mandor OH 0.08 Rp - Rp -
Tukang listrik OH 0.17 Rp - Rp -
Pekerja OH 0.17 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 BH Manual Break Glass


Manual Break Glass bh 1.00 Rp - Rp -
Mandor OH 0.08 Rp - Rp -
Tukang listrik OH 0.17 Rp - Rp -
Pekerja OH 0.17 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 UNIT Transfer Pump Control Panel


Transfer Pump Control Panel bh 1.00 Rp - Rp -
Alat Bantu bh 1.00 Rp - Rp -
Upah Pasang :
Tukang pipa OH 1.00 Rp - Rp -
Kepala tukang pipa OH 0.50 Rp - Rp -
Mandor OH 0.25 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 30 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 UNIT Diesel Fire Pump Cap. 750 GPM


Diesel Fire Pump Cap. 750 GPM bh 1.00 Rp - Rp -
Diesel Fire Pump Control Panel bh 1.00 Rp - Rp -
Alat Bantu bh 1.00 Rp - Rp -
Upah Pasang :
Tukang pipa OH 4.00 Rp - Rp -
Kepala tukang pipa OH 2.00 Rp - Rp -
Mandor OH 1.00 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 UNIT Electric Fire Pump Cap. 750 GPM


Electric Fire Pump Cap. 750 GPM bh 1.00 Rp - Rp -
Electric Fire Pump Control Panel bh 1.00 Rp - Rp -
Alat Bantu bh 1.00 Rp - Rp -
Upah Pasang :
Tukang pipa OH 4.00 Rp - Rp -
Kepala tukang pipa OH 2.00 Rp - Rp -
Mandor OH 1.00 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 UNIT Jockey Fire Pump 38 GPM


Jockey Fire Pump 38 GPM bh 1.00 Rp - Rp -
Jockey Fire Pump Control Panel bh 1.00 Rp - Rp -
Alat Bantu bh 1.00 Rp - Rp -
Upah Pasang :
Tukang pipa OH 2.00 Rp - Rp -
Kepala tukang pipa OH 1.00 Rp - Rp -
Mandor OH 0.50 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 1"


Pipa BS-SC.40 dia. 1" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 1.1/4"


Pipa BS-SC.40 dia. 1.1/4" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 31 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 M' Pipa BS-SC.40 dia. 1.1/2"


Pipa BS-SC.40 dia. 1.1/2" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 2"


Pipa BS-SC.40 dia. 2" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 2.1/2"


Pipa BS-SC.40 dia. 2.1/2" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 3"


Pipa BS-SC.40 dia. 3" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 4"


Pipa BS-SC.40 dia. 4" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 32 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 M' Pipa BS-SC.40 dia. 6"


Pipa BS-SC.40 dia. 6" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 8"


Pipa BS-SC.40 dia. 8" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 M' Pipa BS-SC.40 dia. 10"


Pipa BS-SC.40 dia. 10" Meter 1.10 Rp - Rp -
Alat Bantu & Penunjang Ls 1.00 Rp - Rp -
Pekerja OH 0.08 Rp - Rp -
Tukang Pipa OH 0.08 Rp - Rp -
Kepala tukang OH 0.04 Rp - Rp -
Mandor OH 0.01 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 unit Butterfly Valve dia. 2" 10K


Butterfly Valve dia. 2" 10K unit 1.00 Rp - Rp -
Fitting & Alat Bantu Ls 1.00 Rp - Rp -
Tukang Pipa OH 0.17 Rp - Rp -
Kepala tukang OH 0.17 Rp - Rp -
Mandor OH 0.08 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 Unit Check Valve dia. 8" 16K


Check Valve dia. 8" 16K unit 1.00 Rp - Rp -
Fitting & Alat Bantu Ls 1.00 Rp - Rp -
Tukang Pipa OH 0.17 Rp - Rp -
Kepala tukang OH 0.17 Rp - Rp -
Mandor OH 0.08 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 33 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 Unit Float Valve


Float Valve unit 1.00 Rp - Rp -
Pondasi, & Support Material Ls 1.00 Rp - Rp -
Pekerja OH 1.00 Rp - Rp -
Tukang Pipa OH 1.00 Rp - Rp -
Kepala tukang OH 0.33 Rp - Rp -
Mandor OH 0.17 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 UNIT Outdoor Unit Cap. 362000 BTU/Hr


Bahan :
Outdoor Unit Cap. 362000 BTU/Hr bh 1.00 Rp - Rp -
Alat bantu Set 1.00 Rp - Rp -
Tenaga Kerja :
Mandor OH 0.50 Rp - Rp -
Tukang AC OH 2.00 Rp - Rp -
Pembantu tukang AC OH 3.00 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 UNIT Indoor Unit Cassete Round Flow Cap. 30700 BTU/Hr


Bahan :
Indoor Unit Cassete Round Flow Cap. 30700 BTU/Hr bh 1.00 Rp - Rp -
Alat bantu Set 1.00 Rp - Rp -
Tenaga Kerja :
Mandor OH 0.50 Rp - Rp -
Tukang AC OH 1.00 Rp - Rp -
Pembantu tukang AC OH 1.00 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 UNIT Indoor Unit Cassete Round Flow Cap. 47800 BTU/Hr


Bahan :
Indoor Unit Cassete Round Flow Cap. 47800 BTU/Hr bh 1.00 Rp - Rp -
Alat bantu Set 1.00 Rp - Rp -
Tenaga Kerja :
Mandor OH 0.50 Rp - Rp -
Tukang AC OH 1.00 Rp - Rp -
Pembantu tukang AC OH 1.00 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 pcs Grille 400x400 cm


Grille 400x400 cm m2 1.00 Rp -
Alat bantu & penunjang Ls 1.00 Rp -
Mandor OH 0.02 Rp - Rp -
Tukang AC OH 0.30 Rp - Rp -
Pekerja OH 0.15 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 34 of 54


ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH

1 unit Duct Inline fan Cap. 1500 CMH


Duct Inline fan Cap. 1500 CMH unit 1.00 Rp -
Instalasi kabel point 1.00 Rp -
Alat bantu & penunjang Ls 1.00 Rp -
Mandor OH 0.02 Rp - Rp -
Tukang OH 0.30 Rp - Rp -
Pekerja OH 0.15 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 unit Wall Mounted cap. 265 CMH


Wall Mounted cap. 265 CMH unit 1.00 Rp -
Instalasi kabel point 1.00 Rp -
Alat bantu & penunjang Ls 1.00 Rp -
Mandor OH 0.02 Rp -
Tukang OH 0.30 Rp -
Pekerja OH 0.15 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 unit Wall Mounted cap. 560 CMH


Wall Mounted cap. 560 CMH unit 1.00 Rp -
Instalasi kabel point 1.00 Rp -
Alat bantu & penunjang Ls 1.00 Rp -
Mandor OH 0.02 Rp -
Tukang OH 0.30 Rp -
Pekerja OH 0.15 Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 Unit Wired Remote Control


Wired Remote Control unit 1.00 Rp - Rp -
Mandor OH 0.02 Rp - Rp -
Tukang AC OH 0.30 Rp - Rp -
Pekerja OH 0.15 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

1 Unit Refnet KHRP26A72


Refnet KHRP26A72 unit 1.00 Rp - Rp -
Alat bantu & penunjang Ls 1.00 Rp - Rp -
Mandor OH 0.02 Rp - Rp -
Tukang AC OH 0.30 Rp - Rp -
Pekerja OH 0.15 Rp - Rp -
Jumlah Rp -
Keuntungan+Over head 12% Rp -
Total = Jumlah+(Keuntungan+Over head 12%) Rp -

Analisa Harga Satuan ME - page 35 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 36 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 37 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Analisa Harga Satuan ME - page 38 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Analisa Harga Satuan ME - page 39 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 40 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp - Analisa Harga Satuan ME - page 41 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 42 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Rp -

Rp -

Rp -
Analisa Harga Satuan ME - page 43 of 54
A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 44 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 45 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 46 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 47 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 48 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 49 of 54


A HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

TOTAL

Rp -

Rp -

Rp -

Rp -

Rp -

Analisa Harga Satuan ME - page 50 of 54


REKAPITULASI HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN TOTAL


1 1 M' KABEL NYY 4 X 1.5 mm2 Rp.
2 1 M' KABEL NYY 4 X 2.5 mm2 Rp.
3 1 M' KABEL NYY 4 X 4 mm2 Rp.
4 1 M' KABEL NYY 4 X 6 mm2 Rp -
5 1 M' KABEL NYY 4 X 10 mm2 Rp -
6 1 M' KABEL NYY 4 X 16 mm2 Rp -
7 1 M' KABEL NYY 4 X 25 mm2 Rp -
8 1 M' KABEL NYY 4 X 35 mm2 Rp -
9 1 M' KABEL NYY 4 X 50 mm2 Rp -
10 1 M' KABEL NYY 4 X 70 mm2 Rp -
11 1 M' KABEL NYY 4 X 95 mm2 Rp -
12 1 M' KABEL NYY 4 X 120 mm2 Rp -
13 1 M' KABEL NYY 4 X 150 mm2 Rp -
14 1 M' KABEL NYMHY 3 X 0.75 mm2 Rp -
15 1 M' KABEL NYMHY 3 X 1.5 mm2 Rp -
16 1 M' KABEL NYMHY 3 X 2.5 mm2 Rp -
17 1 M' KABEL NYY 1 X 2.5 mm2 Rp -
18 1 M' KABEL STP AWG 18 Rp -
19 1 M' KABEL BCC 70 mm2 Rp -
20 1 pcs RC091V LED36S 40 W PSU W30L120 GM G2 Rp -
21 1 pcs WT188C LED20 CW L1200 PSU /6500K Rp -
22 1 pcs DN393B LED22-840 PSU D200 ALU Rp -
23 1 pcs DN027B LED15/CW D175 RD Rp -
24 1 pcs DN027B LED20/CW D200 RD Rp -
25 1 pcs EX-LED-M (LED Emergency EXIT sign C/W High Temp) Rp -
26 1 pcs Occuswitch Rp -
27 1 pcs 31097 TrunkLinea 13W 6500K wall lamp LED Rp -
28 1 BH Recessed Mounted RM 300 LED TL.2x18 Watt ACR Prismatic Rp -
29 1 BH Emergency twin spotlight 2x20W Rp -
43 1 BH BL CG LED 1x16 WATT Rp -
44 1 BH Stop Kontak 200 VA Rp -
45 1 BH Stop Kontak Type floor Rp -
46 1 BH Saklar Ganda Rp -
47 1 BH Saklar Tunggal Rp -
44 1 BH Hotel Switch Rp -
45 1 BH Hotel Switch Group Rp -
46 1 BH Grid Switch 12 Gang Rp -
47 1 BH Grid Switch 4 Gang Rp -
48 1 BH Grid Switch 6 Gang Rp -
49 1 BH Grid Switch 8 Gang Rp -
50 1 M' Kabel Tray L = 200 mm Rp -
51 1 M' Kabel Tray L = 300 mm Rp -
52 1 M' Kabel Ladder L = 200 mm Rp -
53 1 M' Kabel Ladder L = 300 mm Rp -
54 1 M' Kabel Ladder L = 400 mm Rp -
55 1 M' Kabel Ladder L = 500 mm Rp -
56 1 M' Kabel Ladder L = 600 mm Rp -
57 1 Unit Grounding TR Rp -
70 1 UNIT PANEL PP Rp -
71 1 UNIT PANEL LP Rp -
72 1 UNIT PANEL PP IU AC Rp -
73 1 UNIT PANEL SDP PUMP Rp -
74 1 TTK TITIK INSTALASI PENERANGAN Rp -
75 1 TTK TITIK INSTALASI STOP KONTAK Rp -
76 1 TTK TITIK INSTALASI DAYA AC/FAN - 1 PHASE Rp.
77 1 TTK TITIK INSTALASI DAYA 3 PHASE Rp.
78 1 TTK TITIK INSTALASI DAYA INDOOR UNIT AC Rp.
79 1 TTK TITIK INSTALASI OUTDOOR UNIT AC Rp.
80 1 TTK TITIK INSTALASI TELEPHONE / DATA Rp.
81 1 TTK TITIK INSTALASI SPEAKER Rp.
82 1 TTK Heat Detector Instalation Rp.
83 1 TTK Alarm Bell Instalation Rp.

Analisa Harga Satuan ME - page 51 of 54


REKAPITULASI HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN TOTAL


84 1 TTK Manual Break Glass Rp.
85 1 TTK Indicating Lamp Rp -
86 1 TTK Flow Switch Instalation Rp -
87 1 UNIT TERMINAL BOX 20 PAIRS Rp -
88 1 UNIT Optical Network Unit (ONU) 24 port Rp -
89 1 UNIT PoE Injector 24 ports FE Rp -
90 1 UNIT Optical Terminal Box Rp -
91 1 UNIT Passive Optical Splitter 4 port Rp -
92 1m Kabel Fiber Optic 4 core Singlemode 9 um Rp -
93 1 UNIT Patch Cord FO SC-SC 1 Core Rp -
94 1 UNIT Patch Panel UTP Cat. 6 kap. 48 port Rp -
95 1 UNIT Patch Cord UTP Cat . 6 panjang 1 meter Rp -
96 1 UNIT Patch Cord UTP Cat . 6 panjang 3 meter Rp -
97 1 UNIT Outlet IP TV Rp -
98 1 UNIT Outlet Telepon Rp -
99 1 UNIT Outlet Data Rp -
100 1 UNIT IP CCTV 2MP Dome, PoE Rp -
101 1 UNIT IP CCTV 2MP Fixed, PoE Rp -
102 1 UNIT IP CCTV 2MP Dome Lift, PoE Rp -
103 1 UNIT Wifi Access Point Rp -
104 1 UNIT IPTV Set Top Box c/w HDMI Cable Rp -
105 1 UNIT Pesawat IP Phone Rp -
106 1 UNIT Fiber Optic Installation + Conduit Instalation (Inc PVC) Rp -
107 1 UNIT Fiber Optic Termination Rp -
108 1 UNIT UTP Installation + Conduit Installation (Inc UTP Cat6 Cable+PVC) Rp -
109 1 UNIT UTP Termination + Pengukuran Rp -
110 1 UNIT Wiring Management Rp -
111 1 UNIT Rack Wall Mounted 19" 9U Rp -
112 1 UNIT Terminal Box Rp -
113 1 BH Smoke Detector Addressable Rp -
114 1 BH Rate of Rise Heat Detector Addressable Rp -
115 1 BH ROR Konvensional Rp -
116 1 BH Smoke Detector Konvensional Rp -
117 1 BH Horn and Strobe Rp -
118 1 BH Manual Break Glass Rp -
157 1 BH Volume Control 36 Watt Rp -
158 1 BH Volume Control 30 Watt Rp -
159 1 BH Wall Speaker 20 WATT Rp -
160 1 BH Ceilling Speaker 3 WATT Rp -
161 1 BH Wall Box Speaker 6 Watt Rp -
183 1 Unit Roof Tank Cap. 12 m3 Rp -
184 1 Unit Transfer Pump Control Panel Rp -
185 1 BH Transfer Pump Multistage 120 lpm Rp -
186 1 UNIT WTP Pump 125 lpm head 40 m Rp -
187 1 UNIT Diesel Fire Pump Cap. 750 GPM Rp -
188 1 UNIT Electric Fire Pump Cap. 750 GPM Rp -
189 1 UNIT Jockey Fire Pump 38 GPM Rp -
190 1 M' Pipa PVC klas AW dia. 1/2" Rp -
191 1 M' Pipa PVC klas AW dia. 3/4" Rp -
192 1 M' Pipa PVC klas AW dia. 1" Rp -
193 1 M' Pipa PVC klas AW dia. 1.1/4" Rp -
194 1 M' Pipa PVC klas AW dia. 1. 1/2" Rp -
195 1 M' Pipa PVC klas AW dia. 1.3/4" Rp -
195 1 M' Pipa PVC klas AW dia. 2" Rp -
195 1 M' Pipa PVC klas AW dia. 2.1/2" Rp -
196 1 M' Pipa PVC klas AW dia. 3" Rp -
197 1 M' Pipa PVC klas AW dia. 4" Rp -
198 1 M' Pipa PVC klas AW dia. 5" Rp -
199 1 M' Pipa PVC klas AW dia. 6" Rp -

Analisa Harga Satuan ME - page 52 of 54


REKAPITULASI HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN TOTAL


200 1 M' Pipa GIP Medium - A dia. 4" Rp -
201 1 M' Pipa BS-SC.40 dia. 1" Rp -
202 1 M' Pipa BS-SC.40 dia. 1.1/4" Rp -
203 1 M' Pipa BS-SC.40 dia. 1.1/2" Rp -
204 1 M' Pipa BS-SC.40 dia. 2" Rp -
205 1 M' Pipa BS-SC.40 dia. 2.1/2" Rp -
206 1 M' Pipa BS-SC.40 dia. 3" Rp -
207 1 M' Pipa BS-SC.40 dia. 4" Rp -
208 1 M' Pipa BS-SC.40 dia. 5" Rp -
209 1 M' Pipa BS-SC.40 dia. 6" Rp -
210 1 M' Pipa BS-SC.40 dia. 8" Rp -
211 1 M' Pipa BS-SC.40 dia. 10" Rp -
212 1 M' Pipa PN-10 dia. 1/2" Rp -
213 1 M' Pipa PN-10 dia. 3/4" Rp -
214 1 M' Pipa PN-10 dia. 1" Rp -
215 1 M' Pipa PN-10 dia. 1.1/4" Rp -
216 1 M' Pipa PN-10 dia. 1.1/2" Rp -
217 1 M' Pipa PN-10 dia. 2" Rp -
218 1 M' Pipa PN-10 dia. 2.1/2" Rp -
219 1 M' Pipa PN-10 dia. 3" Rp -
220 1 M' Pipa PN-10 dia. 4" Rp -
221 1 Unit Gate Valve dia. 1.1/4" 10K Rp -
222 1 Unit Gate Valve dia. 1.1/2" 10K Rp -
223 1 Unit Gate Valve dia. 2" 10K Rp -
224 1 Unit Gate Valve dia. 2.1/2" 10K Rp -
225 1 Unit Butterfly Valve dia. 2" 10K Rp -
236 1 Unit Gate Valve dia. 1"16K Rp -
237 1 Unit Gate Valve dia. 2.1/2" 16K Rp -
238 1 Unit Gate Valve dia. 3" 16K Rp -
239 1 Unit Gate Valve dia. 4" 16K Rp -
240 1 Unit Gate Valve dia. 5" 16K Rp -
241 1 Unit Gate Valve dia. 6" 16K Rp -
242 1 Unit Gate Valve dia. 8" 16K Rp -
243 1 Unit Gate Valve dia. 10" 16K Rp -
244 1 Unit Safety Valve dia. 4" 16K Rp -
245 1 Unit Main Control Valve Rp -
246 1 Unit Branch Control Valve (BCV) dia.4" Rp -
247 1 Unit Check Valve dia. 2" 10K Rp -
259 1 Unit Check Valve dia. 2.1/2" 16K Rp -
260 1 Unit Check Valve dia. 8" 16K Rp -
261 1 Unit Strainer dia. 2" 16K Rp -
262 1 Unit Flexible Joint dia. 2" 16K Rp -
267 1 Unit Flexible Joint dia. 6" 16K Rp -
268 1 Unit Flexible Joint dia. 8" 16K Rp -
269 1 Unit Foot Valve dia. 1.1/2" 16K Rp -
270 1 Unit Foot Valve dia. 2" 16K Rp -
271 1 Unit Foot Valve dia. 2.1/2" 16K Rp -
272 1 Unit Foot Valve dia. 3" 16K Rp -
273 1 Unit Foot Valve dia. 8" 16K Rp -
266 1 Unit Pressure Gauge + Valve Rp -
267 1 Unit Pressure Switch Rp -
268 1 Unit Flow Switch 4" Rp -
269 1 Unit Box Hydrant Type. A
270 1 Unit Apar 6 Kg Rp -
271 1 Unit Apar 3 Kg Rp -
272 1 Unit Pillar Hydrant Rp -
273 1 Unit Siamese Conection Rp -

Analisa Harga Satuan ME - page 53 of 54


REKAPITULASI HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
GEDUNG LPMP
MAKASSAR

NO. URAIAN TOTAL


274 1 Unit Head Sprinkler Rp -
275 1 Unit Sight Glass 1" Rp -
276 1 Unit Safety Valve 4" Rp -
277 1 unit Flow Meter Rp -
278 1 unit Level Switch Rp -
279 1 unit Float Valve Rp -
280 1 UNIT Clean Out dia 4" Rp -
281 1 UNIT Outdoor Unit Cap. 362000 BTU/Hr Rp -
282 1 UNIT Indoor Unit Cassete Round Flow Cap. 30700 BTU/Hr Rp -
283 1 UNIT Indoor Unit Cassete Round Flow Cap. 38200 BTU/Hr Rp -
284 1 UNIT Indoor Unit Cassete Round Flow Cap. 54600 BTU/Hr Rp -
285 1 UNIT Indoor Unit Cassete Round Flow Cap. 47800 BTU/Hr Rp -
286 1 UNIT Indoor Unit Wall Mounted Cap. 15400 BTU/Hr Rp -
287 1 UNIT Indoor Unit Wall Mounted Cap. 12300 BTU/Hr Rp -
288 1 UNIT Indoor Unit Wall Mounted Cap. 9600 BTU/Hr Rp -
289 1 UNIT Indoor Unit Wall Mounted Cap. 7500 BTU/Hr Rp -
290 1 UNIT Wired Remote Control Rp -
291 1 UNIT Refnet KHRP26A72 Rp -
292 1 UNIT Indoor + Outdoor 0,5 PK Split Wall Mounted R410 Rp -
293 1 UNIT Indoor + Outdoor 0,75 PK Split Wall Mounted R410 Rp -
294 1 m' Refrigerant Pipe Dia. 1/4" Rp -
295 1 m' Refrigerant Pipe Dia. 3/8" Rp -
296 1 m' Refrigerant Pipe Dia. 1/2" Rp -
297 1 m' Refrigerant Pipe Dia. 5/8" Rp -
298 1 m' Refrigerant Pipe Dia. 3/4" Rp -
299 1 m' Refrigerant Pipe Dia. 7/8" Rp -
300 1 m' Refrigerant Pipe Dia. 1" Rp -
301 1 m' Refrigerant Pipe Dia. 1 1/8" Rp -
302 1 m' Refrigerant Pipe Dia. 1 2/8" Rp -
303 1 m' Refrigerant Pipe Dia. 1 3/8" Rp -
304 1 m' Refrigerant Pipe Dia. 1 4/8" Rp -
305 1 m' Refrigerant Pipe Dia. 1 5/8" Rp -
306 1 m' Refrigerant Pipe Dia. 2 1/8" Rp -
307 1 m2 Polyurethane Panel Rp -
308 1 Unit Grille 400x400 cm Rp -
FAN
309 1 Unit Duct Inline fan Cap. 1500 CMH Rp -
310 1 Unit Wall Mounted cap. 265 CMH Rp -
311 1 Unit Wall Mounted cap. 560 CMH Rp -
312 1 Unit Wall Mounted cap. 726 CMH Rp.
313 1 Unit Wall Mounted cap. 950 CMH Rp,

Analisa Harga Satuan ME - page 54 of 54