TOENEC PHILIPPINES DATE : 31 October 2014 ###

PROJECT NAME : HONDA PHILIPPINES INC. - PROPOSED CBU BLDG. EXPANSION


ELECTRICAL WORKS
MATERIAL & LABOR
COST
ITEM Q'TY UNIT
(PESO)

EXISTING CKD WAREHOUSE WITH ADDITIONAL TWO LEVEL MEZZANINE


(OPTION 3)

I. DIRECT COST

ELECTRICAL WORKS 1 LOT 13,955,950.77

SAY 1 LOT 13,950,000.00

II. INDIRECT COST 1 LOT 2,700,000.00

TOTAL (DIRECT + INDIRECT COST) 1 LOT 16,650,000.00

PLUS: V.A.T. 12% 1 LOT 1,998,000.00

GRAND TOTAL 18,648,000.00

Summary/
FORM-R5-2 PAGE(SUMMARY)-1/23 446872395.xlsx
TOENEC PHILIPPINES DATE : 31 October 2014 ###
PROJECT NAME : HONDA PHILIPPINES INC. - PROPOSED CBU BLDG. EXPANSION
ELECTRICAL WORKS
MATERIAL & LABOR
COST
ITEM Q'TY UNIT
(PESO)

Summary/
FORM-R5-2 PAGE(SUMMARY)-2/23 446872395.xlsx
TOENEC PHILIPPINES 31 October 2014
PROJECT NAME : HONDA PHILIPPINES INC. - PROPOSED CBU BLDG. EXPANSION
ELECTRICAL WORKS
MATERIAL & LABOR
COST
ITEM Q'TY UNIT
(PESO)

EXISTING CKD WAREHOUSE WITH ADDITIONAL TWO LEVEL MEZZANINE


(OPTION 3)

A. LIGHTING SYSTEM 1 LOT 9,087,432.88

B. EMERGENCY AND EXIT LIGHT SYSTEM 1 LOT 1,271,638.62

C. RECEPTACLE SYSTEM 1 LOT 510,819.64

D. FIRE ALARM SYSTEM 1 LOT 1,144,236.32

E. PUBLIC ADDRESS SYSTEM 1 LOT 493,530.78

F. FEEDER SYSTEM 1 LOT 547,572.53

G. OTHERS 1 LOT 900,720.00

TOTAL 13,955,950.77

FORM-R5-2 PAGE(SUMMARY)-3/23 Summary(E) /


446872395.xlsx
TOENEC PHILIPPINES 31 October 2014
PROJECT NAME : HONDA PHILIPPINES INC. - PROPOSED CBU BLDG. EXPANSION
ELECTRICAL WORKS
MATERIAL & LABOR
COST
ITEM Q'TY UNIT
(PESO)

FORM-R5-2 PAGE(SUMMARY)-4/23 Summary(E) /


446872395.xlsx
TOENEC PHILIPPINES Date :
PROJECT NAME : YAZAKI-TORRES MANUFACTURING INC.
ELECTRICAL WORKS
LOCAL PORTION (P.PESO)
QTY UNIT
ITEM UNIT P. AMOUNT

A. FEEDER SYSTEM

1.0 Roughing Ins


PUC Pipe, 60mm Ø 5 lgt.
RSC Pipe, 50mm Ø 2 lgt.
Conduit Fittings and Accessories 1 lot
Pull Box NEMA-3R, Hot Dipped Galvanized,( 500mmx300mmx150mm) 1 pcs.
Wireway(200mmx200mmx150mm) 5 lgt.
Wireway(200mmx200mmx150mm) Horizontal Elbow 1 pcs.
Wireway(200mmx200mmx150mm) Vertical Elbow 1 pcs.
Wireway Fittings and Accessories 1 lot
Manhole (900mmx900mmx1000mm) 1 EA
Hanger and Support 1 lot
Painting Materials 1 lot
Miscellaneous 1 lot

2.0. Wires and Cables


THHN Wires, 50mm² 96 mtrs.
TW Wires, 14mm² 33 mtrs.
Wiring Accessories 1 lot
Miscellaneous 1 lot

3.0. Wiring Devices


150AT/150AF, 3p, MCCB 1 assy.
31 AT/63AF,3P, HBH-BOLT ON 4 assy.
31 AT/63AF,3P, HBH-BOLT ON 16 assy.
Split Bolt Connector (150mm² and 50mm²)
Support for the Above 1 lot
Miscellaneous 1 lot

4.0. Labor Cost 1 lot

5.0 Testing and Commisioning 1 lot

Sub-Total (A)

A. LIGHTING SYSTEM

1.0 Roughing Ins


RSC Pipe, 20mm Ø 64 lgt.
RSC Pipe, 15mm Ø 213 lgt.
RSC Fittings and Accessories 1 lot
Junction Box 90 pcs.
FS-Utility Box 23 pcs.
Square Box 10 pcs.
Flexible Metalic Conduit, 15mm Ø 160 meters
Angle Connector, 15mm Ø 90 pcs.
Straight Connector, 15mm Ø 90 pcs.

Hanger and Support: (For Basis Only)


Angle Bar, 40mmx40mmx1.5mm THK 62 lgt.
Threaded Rod, 3/8 inch Ø by 3meters 180 lgt.
Flat Bar, 20mm x 1.25mm THK 20 lgt.

FORM-R5-2 L.O and C.O(WareHouse)


Time Printed :03:15:30 PAGE: B/Q(E)-5/23 446872395.xlsx
TOENEC PHILIPPINES Date :
PROJECT NAME : YAZAKI-TORRES MANUFACTURING INC.
ELECTRICAL WORKS
LOCAL PORTION (P.PESO)
QTY UNIT
ITEM UNIT P. AMOUNT

Painting Materials 1 lot


Miscellaneous 1 lot

2.0. Wires and Cables


THHN Wires, 5.5mm² 471 mtrs.
THHN Wires, 3.5mm² 3,043 mtrs.
TW Wires, 3.5mm² 1,536 mtrs.
Wiring Accessories 1 lot
Miscellaneous 1 lot

3.0. Wiring Devices


3-gang Switch 2 sets
2-gang Switch 1 set
1-gang Switch 8 sets
1-gang Switch (Illuminated) 2 sets
Ceiling Type, Exhaust Fan 2 sets
Support for the Above 1 lot
Miscellaneous 1 lot

4.0. Lighting Fixtures


2 x 20W LED Tube in Industrial Type Housing Fixture W/ 86 set
Mirrorized Reflector (Fixture Only)
Miscellaneous 1 lot

5.0 Labor Cost 1 lot

6.0. Testing and Commisioning 1 lot

Sub-Total (A)

B CONVENIENCE OUTLET LAYOUT

1.0. Roughing Ins


RSC Pipe, 20mm Ø 56 lgt.
RSC Pipe, 15mm Ø 183 lgt.
FS Utility Box 38 pcs
Pull Box 4 pcs
Junction Box 60 pcs
Hanger and Supports 1 lot
Painting Materials 1 lot
Miscellaneous 1 lot

2.0 Wires and Cables


THHN Wires, 5.5mm² 288 mtrs.
THHN Wires, 3.5mm² 1,560 mtrs.
TW Wires, 3.5mm² 910 mtrs.
Royal Cord 2.0mm²/3C
Wiring Accessories 1 lot
Miscellaneous 1 lot

3.0 Equipment and Devices


Convenience Outlet, Universal Type, Double 35 sets
Miscellaneous 1 lot

FORM-R5-2 L.O and C.O(WareHouse)


Time Printed :03:15:30 PAGE: B/Q(E)-6/23 446872395.xlsx
TOENEC PHILIPPINES Date :
PROJECT NAME : YAZAKI-TORRES MANUFACTURING INC.
ELECTRICAL WORKS
LOCAL PORTION (P.PESO)
QTY UNIT
ITEM UNIT P. AMOUNT

4.0 Labor Cost 1 lot

5.0. Testing and Commisioning 1 lot

Sub-Total (B)

E. MECHANICAL POWER SUPPLY

1.0 Roughing Ins


RSC Pipe, 20mm Ø 190 lgt.
RSC Pipe, 15mm Ø 79 lgt.
RSC Fitings and Accessories 1 lot
Square Box 4 pcs.
Pull Box (200mm x 200mm x150mm) 2 pcs.
Pull Box (250mm x 200mm x150mm) NEMA-3R
(Hot Dippe Glvanized) 1 pcs.
Junction Box 30 pcs.
Liquid Flexible Conduit 20mmØ 15 meters
Liquidtight Fittings & Accessories 1 lot
Hanger and Supports 1 lot
Painting Materials 1 lot
Miscellaneous 1 lot

2.0. Wires and Cables


THHN Wire, 5.5mm2 1,958 meters
THHN Wire, 3.5mm2 1,284 meters
TW Wire, 3.5mm2 1,176 meters
Royal Cord 2mm2/2C 20 meters
Wiring Accessories 1 lot
Miscellaneous 1 lot

3.0. Equipment and Devices


ECB, NEMA-3R, 32 AT/63AF,3P, MCCB 3 assy.
DOL Magnetic Starter with Overload Relay for 365 Watts
with ON/OFF indicator 4 assy.
Orbit Fan (Owner Supply) 9 sets
ECB, NEMA-1R, 30 AT/63AF,3P, MCCB 4 assy.
Support for the Above 1 lot
Miscellaneous 1 lot

5.0 Labor Cost 1 lot

6.0. Testing and Commisioning 1 lot

Sub-Total (E)

FORM-R5-2 L.O and C.O(WareHouse)


Time Printed :03:15:30 PAGE: B/Q(E)-7/23 446872395.xlsx
ITEM

ROHM MECHATECH ANNUAL PREVENTIVE MAINTENANCE ON ELECTRICAL


FACILITIES 2019

ELECTRICAL PREVENTIVE MAINTENANCE WORKS

I SUBSTATION / ELECTRICAL ROOM


A Conduct the ff procedures on Switchgears Substation and Electrical Room.

a.1 Inspection of Switchgear's Vacuum Circuit Breaker.


a.2 Conduct Contact Resistance Test.
a.3 Checking and Re-tightening of bus bars and cable connections. Apply approved Torque
on terminals / connections.
a.4 Inspection, cleaning and provide contact paste to moving and stationary parts.
a.5 Lubrication of moving parts.
a.6 Simulate Transformer's protective relays w/ Vacuum Circuit Breaker.
a.7 Inspection, calibration and simulation of Over Current Relay(OCR) w/ circuit breakers.

Electrical Room 2/F (FACTORY 3)


MVSG - 4.16kV, 3Ø
Main: Disconnection Switch
Vacuum Circuit Breaker 600AT, 7.2kV ………….…… 2 units
Over Current Relay…………………………….………..2 units
Ground Fault Relay………………………………….…..2 units

LVSG-210

LVSG-230

Electrical Room 1/F (FACTORY 1)

LVSG-208
MCCB-210
E/R AVR PNL
E/R PANEL-2 (ECB)
E/R LVSG-1
PPM-2
E/R LVSG-2

B Miscellaneous & Consumables

C Engineering Works & Technical Supervision

Sub-total I

II POWER TRANSFORMER
A Conduct the ff procedures on TWO (2) - 1500kVA (FOR 230V & 210V)
Power Transformer.

a.1 Winding Test


a.1.1 Insulation Power Factor (Primary-Ground, Primary-Secondary,Secondary-Ground)
a.1.2 Transformer Turns Ratio Test (TTR)
a.1.3 Insulation Resistance Test (IR)
a.1.4 Polarization Index Test
a.1.5 Winding Resistance Test

a.2 Transformer Oil Test


a.2.1 Dielectric Breakdown Voltage Test (DBV)
a.2.2 Dissolve Gas Analysis (DGA) [Before and After Preventive Maintenance]

1500kVA, 4.16kV / 230V, 3P,60Hz Oil Immersed Transformer

1500kVA, 4.16kV / 210V, 3P,60Hz Oil Immersed Transformer

a.3 230V Power Transformer Nitrogen Gauge Repair.

Conduct the ff procedures on ONE (1) 230V Power Transformer.


a.1 Dismantling of Transformer Nitrogen Gauge.
a.2 Replacement of New Nitrogen Gauge.
a.3 Nitrogen refill
a.4 Nitrogen leakage test

B Miscellaneous & Consumables


C Engineering Works & Technical Supervision

Sub-total II

III LIGHTNING ARRESTER / GROUNDING SYSTEM


A Conduct the ff procedures on ONE (1) set Lightning Arrester.
a.1 Ground Resistance Test
a.2 Cleaning/Polishing of Lightning Conductor.
a.3 Testing of Lightning Discharge Counter

Lightning Arrester (Brand: Lightning Carrier System)


Grounding System

B Miscellaneous & Consumables

C Engineering Works & Technical Supervision

Sub-total III

IV Ninety-Two (92) Assy of 210V and 220V Power and Lighting Local Panel Boards.
A. Conduct the ff procedures at identified Local Panel Boards.
a.1 Vacuum Cleaning of Panelboards.
a.2 Retightening of terminals. Apply Approved Torque on terminals.
a.3 Insulation Resistance test of Busbars and Feeder Wires.

Factory 1&2 Local Panel Boards


1 LPM-1
2 PPM-2F
3 PPM-2E
4 PP-REPI-1
5 LP-1
6 CHAMFERING M/C
7 LPM-22
8 PPAC PANEL
9 AACU 1,2,3
10 COLLING TOWER
11 PP-IN-LINE M/C
12 PPM-2C
13 PP-CUTTING
14 PANEL-3
15 CNC PANEL
16 PP-GRINDING
17 PPM-2D
18 WASHING/DYER PANEL
19 PP-MILLING
20 HEAT TREATMENT MACHINE
21 PAC PANEL
22 STP PANEL
23 FCU-91
24 HAND DRYER
25 PAC 24
26 ELEVATOR
27 LP PANEL SCRAP STORAGE
28 COLLING TOWER
29 EXHAUST FAN PANEL 2
30 EXHAUST FAN PANEL 3
31 EF-MCC-1
32 MOTOR PUMP GUARD HOUSE
33 PAC 29/FCU 43
34 A/C GUARDHOUSE
35 POND WATER CIRCULATING PUMP
36 DUMB WATER
37 PAC-SPM-2
38 PAC-BW-2
39 LIGHTING GUARDHOUSE
40 FIRE ALARM PANEL / GUARDHOUSE
41 HOOP WASH EF-2 / STRIP WASH EF
42 HOOP WASH EF-1
43 PP-KITCHEN
44 LPM-1C
45 PP-PACKING
46 PP-CANTEEN / DISHWASHING
47 PANEL 220V / TEMPORARY OFFICE
48 PPAC-2
49 HEAT TREATMENT PANEL
50 NP-PAC
51 PANEL-M
52 AS 400WASHING / COMPUTER
53 UNITIZED PANEL

Factory 3
1 PP-PLATTING
2 PP-1
3 PM-1
4 PM-2
5 PSP-1
6 PP-2
7 PMG-1
8 PMG-2
9 PSP-2
10 PCP
11 PALADIUM PLATTING
12 PF-100V-1
13 DUST DETECTOR
14 MCC-4 (165.4kVA)
15 UAC M-1
16 UAC G-1
17 PP-CHILLER
18 PP-AC-1
19 PP-AC-3
20 MCC-2
21 MCC-3
22 QAC P-1
23 MCC-3
24 LP-A
25 LP-B
26 LP-C
27 LP-D
28 ELEVATOR
29 MMC-1
30 PP-100V-A1
31 PP-DRYER
WWTP AREA
1 DB-PANEL
2 PP-FAN
3 LP-PANEL

OUTSIDE STORAGE AREA


1 MDP-STORAGE
2 PP-PANEL
3 PP-STORAGE
4 LP-WAREHOUSE
5 LP-GH
6 LP-STORAGE

B Miscellaneous & Consumables

C Engineering Works & Technical Supervision

Sub-total IV

V Twelve (12) Units of Indoor Enclosed Circuit Breaker Panels

A. Conduct the ff procedures at identified Enclosed Circuit Breaker Panels.


a.1 Checking and Inspection of physical condition of ECB panel.
a.2 Vacuum Cleaning of ECB Panel.
a.3 Re-Tightening of terminals. Apply approved Torque on Terminals.
a.4 Insulation Resistance test of Feeder Wires (Line Side).

Inddor ECB units


MCCB-210-1
MCCB-230-1
MCCB-230-2
MCCB-230-3
ECB, 600AT,3P
DP-1
ECB, 500AT,3P
ECB, 175AT,3P
ECB Chiller
ECB, 150AT,3P
ECB COOLING TOWER PANEL

B Miscellaneous & Consumables

C Engineering Works & Technical Supervision

Sub-total V

VI NINE (9) Units DRY TYPE TRANSFORMER


A. Conduct the ff procedures on Nine (9) units - Dry Type Transformer

a.1 Cleaning and Inspection of transformer


a.2 Re-Tightening of Terminals. Apply Approved Torque on each Terminals.
a.3 Insulation Resistance Test (IR)
a.4 Winding Resistance Test
a.5 Transformer Turns Ratio Test (TTR)

75kVA
20kVA
15kVA
8kVA
3kVA
2kVA

B Miscellaneous & Consumables

C Engineering Works & Technical Supervision

Sub-total VI

VII Temporary Utilities Works & Generator Rental During Shutdown of Power

Temporary Lighting & Cabling Works

Generator Rental & Fuel

Mobilization and Transportation Cost


Safety Paraphernalia

Sub-total VII

Grand-Total

Works not included in this quotation:


1. Necessary part and/or equipment replacement that will be recommended during servicing.
2. Repair works such as trouble shooting of defective part of the system.
3. Required renovation/relocation/additional works.
4. Bonds and Insurances.

NOTE:
1. The above Preventive Maintenace works shall need a Two (2) days power shutdown.
2. A written test report with evaluation and recommendation shall be submitted.
LOCAL PORTION (P.PESO)
QTY UNIT
UNIT P. AMOUNT

1 assy

1 assy

1 assy

1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy

1 lot

1 lot

1 assy

1 assy

1 lot
1 lot
1 lot
1 lot

1 lot
1 lot

1 assy
1 lot

1 lot

1 lot

1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
3 assy

1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy

1 assy
1 assy
1 assy
1 assy
1 assy
1 assy

1 lot

1 lot

1 assy
1 assy
1 assy
1 assy
2 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy

1 lot

1 lot

2 units
1 unit
2 units
1 unit
2 units
1 unit

1 lot

1 lot

1 lot

1 lot

1 lot
1 lot