I. DIRECT COST
Summary/
FORM-R5-2 PAGE(SUMMARY)-1/23 446872395.xlsx
TOENEC PHILIPPINES DATE : 31 October 2014 ###
PROJECT NAME : HONDA PHILIPPINES INC. - PROPOSED CBU BLDG. EXPANSION
ELECTRICAL WORKS
MATERIAL & LABOR
COST
ITEM Q'TY UNIT
(PESO)
Summary/
FORM-R5-2 PAGE(SUMMARY)-2/23 446872395.xlsx
TOENEC PHILIPPINES 31 October 2014
PROJECT NAME : HONDA PHILIPPINES INC. - PROPOSED CBU BLDG. EXPANSION
ELECTRICAL WORKS
MATERIAL & LABOR
COST
ITEM Q'TY UNIT
(PESO)
TOTAL 13,955,950.77
A. FEEDER SYSTEM
Sub-Total (A)
A. LIGHTING SYSTEM
Sub-Total (A)
Sub-Total (B)
Sub-Total (E)
LVSG-210
LVSG-230
LVSG-208
MCCB-210
E/R AVR PNL
E/R PANEL-2 (ECB)
E/R LVSG-1
PPM-2
E/R LVSG-2
Sub-total I
II POWER TRANSFORMER
A Conduct the ff procedures on TWO (2) - 1500kVA (FOR 230V & 210V)
Power Transformer.
Sub-total II
Sub-total III
IV Ninety-Two (92) Assy of 210V and 220V Power and Lighting Local Panel Boards.
A. Conduct the ff procedures at identified Local Panel Boards.
a.1 Vacuum Cleaning of Panelboards.
a.2 Retightening of terminals. Apply Approved Torque on terminals.
a.3 Insulation Resistance test of Busbars and Feeder Wires.
Factory 3
1 PP-PLATTING
2 PP-1
3 PM-1
4 PM-2
5 PSP-1
6 PP-2
7 PMG-1
8 PMG-2
9 PSP-2
10 PCP
11 PALADIUM PLATTING
12 PF-100V-1
13 DUST DETECTOR
14 MCC-4 (165.4kVA)
15 UAC M-1
16 UAC G-1
17 PP-CHILLER
18 PP-AC-1
19 PP-AC-3
20 MCC-2
21 MCC-3
22 QAC P-1
23 MCC-3
24 LP-A
25 LP-B
26 LP-C
27 LP-D
28 ELEVATOR
29 MMC-1
30 PP-100V-A1
31 PP-DRYER
WWTP AREA
1 DB-PANEL
2 PP-FAN
3 LP-PANEL
Sub-total IV
Sub-total V
75kVA
20kVA
15kVA
8kVA
3kVA
2kVA
Sub-total VI
VII Temporary Utilities Works & Generator Rental During Shutdown of Power
Sub-total VII
Grand-Total
NOTE:
1. The above Preventive Maintenace works shall need a Two (2) days power shutdown.
2. A written test report with evaluation and recommendation shall be submitted.
LOCAL PORTION (P.PESO)
QTY UNIT
UNIT P. AMOUNT
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 lot
1 lot
1 assy
1 assy
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 assy
1 lot
1 lot
1 lot
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
3 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 lot
1 lot
1 assy
1 assy
1 assy
1 assy
2 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 assy
1 lot
1 lot
2 units
1 unit
2 units
1 unit
2 units
1 unit
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
during servicing.
shutdown.