7. What is the minimum required thickness of a blank made of ASTM A516 Gr. 70 Plate
with a with a ring joint design (Size 10 NPS Class 600 Flange = dg value) in a piping system
with a design pressure of 400 psi @ 400°F & Corrosion Allowance of .125 inches?
Note: All test results signed off & dated by Egyptian Mech. Testing Group (Babu B. Babu)
Tensile Test specimen # 1 (18.8mm x 18.8mm) Results = 69,900 … Failed = Weld Metal
Tensile Test specimen # 2 (18.6mm x 18.6mm) Results = 70,000 … Failed = Weld Metal
Tensile Test specimen # 3 (18.7mm x 18.7mm) Results = 66,500 … Failed = Base Metal
Tensile Test specimen # 4 (18.8mm x 18.8mm) Results = 66,000 … Failed = Base Metal
Guided Bend (side bend) specimen # 1 results = Pass … 2.9 mm slag in the weld area
Guided Bend (side bend) specimen # 2 results = Pass … 3.0 mm porosity in the weld area
Guided Bend (side bend) specimen # 3 results = Pass … 3.0 mm crack in the weld area
Guided Bend (side bend) specimen # 4 results = Pass … 3.0 mm incomp. fusion weld area
11. The four tensile test values provided above by were reviewed and found to be:
A) Adequate in number, however # 1 & # 4 are both below ASME IX required tensile values
B) Adequate in number, however # 1 is below the ASME IX required tensile value
C) Adequate in number, however # 1, # 3 & # 4 are all below ASME IX tensile values
D) Adequate in number & all tensile test results are acceptable and Babu signed it off.
Answer: D … Apply QW-422 Table Value of 60 ksi & 5% under rule of QW-153
The number (4) was adequate because specimens are half-size (full size = 1.5 in. or 38mm)
60,000 Table Value (no allowed reduction for weld metal failures) … Accept # 1 & # 2
60,000 Table Value x .95 (5% rule for base metal failures) = 57,000 … Accept # 3 & # 4
12. The guided bend test results provided above were reviewed and:
A) Adequate in number, however specimens with cracks (# 3 was cracked) are always rejected
B) Adequate in number, however specimens # 2, # 3 & # 4 are rejectable (3mm defects visible)
C) Inadequate in number, and specimens # 2, # 3 & # 4 are rejectable (3mm defects visible)
D) Adequate in number & all guided bend test results are acceptable and Babu signed it off.
Answer: D … Apply QW-163 acceptance criteria allowing a 3mm maximum weld flaw size
Q & A for API 570 Practice Exam Open Book (100 Questions)
Answer question 13 below (WPS & PQR Review)
PQR Given Information: A-106 Gr. B material, NPS 20, Schedule 120
Additional Given Information
PQR # 123456 coupon thickness measured by Babu was exactly the same thickness as the
nominal wall thickness from API 574 piping schedules in inches. Weld process = SMAW.
PQR # 123456 was signed and dated by Babu B. Babu and supports WPS # 123456.
13. What is the WPS # 123456 base metal thickness range qualified by PQR # 123456?
A) 3/16 in. or 5 mm is the minimum thickness qualified by PQR # 123456
B) 2T (1.5 inches x 2) or 3 inches (76mm) is the maximum thickness qualified by PQR # 123456
C) 3/16 in. (5 mm) to 2T (3 inches or 76mm) is the thickness range qualified by PQR # 123456
D) None of these are correct
Answer: D … QW-451.1 Table Row = 1.5 inches to 6 inches (inclusive) = 5mm to 200mm
14. A piping system designed at 500 psi @ 600°F is to be hydrostatically tested at a test
temp conducted at 100°F or below. Pipe material is A-106 Gr. B Seamless Sch 80 NPS 6.
What is the hydrostatic test pressure (compensating for design to test temp difference)?
A) 750 psig B) 794 psig C) 812 psig D) 867 psig
Answer = D … Reference: ASME B31.3 Table A-1 & Para. 345.4.2 … Use Formula
(API EXAM QUESTIONS WILL NOT GIVE THE INFO ABOVE IN PARENTHESIS)
Solution: Determine both St & S from A-1 Tables … St = 20,000 & S = 17,300 (St ÷ S = 1.156)
1.5 (500 … pressure) (1.156 … Rr = St/S = 1.156) = 867.05 = 867 psig
Para. 345.4.2 (a) requires not less than 1-1/2 times design pressure. 500 x 1.5 = 750
Solution = 867 psi to compensate for the difference between design pressure test conditions and
it must be noted that 867 exceeds the “minimum” of 1.5 times design or 750 psi in this case!!!
15. What is the essential wire & wire diameter (assume source side IQI) for 4 NPS Sch 40S
ASTM A312 Type 316L pipe weld in “as welded” condition. Assume Category D service!
A) Essential wire # 4 (0.16 mm) B) Essential wire # 5 (0.20 mm)
C) Essential wire # 6 (0.25 mm) D) None of these are correct
Answer = C … Solution Step # 1: Use API 574 Table, Sch 40 NPS 4 = .237 (6.02mm)
Solution Step # 2: Apply the rule for T-276.2(a) and proceed to Step # 3 … Add reinforcement
Solution Step # 3: Use B31.3, Table 341.3.2 for reinforcement = L = 1/16 in or .062 (1.5mm)
Cat. D service (M value) requires DOUBLE code reinforcement of “L” @ B31.3 T- 341.3.2
Solution Step # 4: Add .237 + .125 = .299 inches … Metric = 6.02 mm + 3 mm = 9.02 mm
Ref: API 574 SS schedules, B31.3 table 341.3.2 value “M”, ASME V, Table T-276, T-233.2
2 RULES = WELDS WITH (T-276.2a) & WITHOUT (T-276.2b) REINFORCEMENT
Q & A for API 570 Practice Exam Open Book (100 Questions)
Answer question 16 (Determine weld size) below
B31.3 Fig. 328.5.2B Typical Details for Double-Welded Slip-On Flg Attachment Welds
16. What are the minimum required fillet weld sizes (front & back welds) for a double
welded slip on flange per Fig.328.5.2B using Detail (1), given a 3 NPS Sch 40 pipe & class
150 rated slip-on welding flange?
A) 5.6 mm for the front weld (ID) & 7.8 mm for the back weld (OD)
B) 6.0 mm for the front weld (ID) & 7.8 mm for the back weld (OD)
C) 6.0 mm for the front weld (ID) & 6.0 mm for the back weld (OD)
D) 5.6 mm for the front weld (ID) & 8.6 mm for the back weld (OD)
574 pipe sch T = 5.59 mm … Note that you must use ASME B16.5 Tables
Flange Hub T See B16.5 Table 8 X* – B* ÷ 2 = 108 – 90.7 = 17.3 ÷ 2 = 8.65 mm
* X & B values in Table 8 (Class 150 Flg dimensions) on Pg 71 See Columns 5 & 11
Front weld size (ID near the flange face) = lesser of T or 6mm = 5.59 mm = Answer = A
Back weld size (OD on back side) = 1.4 x t = lesser of 7.83 mm or 8.65 = 7.83 mm = A
17. Minimum hold time and test pressure for a Sensitive Leak Test using the Gas and
Bubble test method with an approved low surface tension bubble forming solution is:
Additional Given Information: The system under test has a design pressure of 100 psi.
A) 5 minutes at a test pressure of 25 psi B) 10 minutes at a test pressure of 15 psi
C) 15 minutes at a test pressure of 15 psi D) 30 minutes at a test pressure of 25 psi
Ans = C … Ref: ASME B31.3, Par. 345.8 ASME V, Art. 10, Mandatory Appendix 1,
Sections I-1032a & I-1070 = 15 minutes & 345.8.a = lesser of 15 psi or 25% design pressure
18. What is pressure rating & the hydrostatic test pressure for a Class 300 A182 Gr. F316L
flange being subjected to a system hydrostatic test pressure at 50°F (10°C)?
A) 230 psi x 1.5, round up at test at 350 psi B) 600 psi x 1.5 and test at 900 psi
C) 275 psi x 1.5, round up at test at 425 psi D) 720 psi x 1.5 and test at 1100 psi
Ans = B … Ref: B16.5, Par. 2.6 & Table 1A Table F2-2.3 Row 100°F & Col. Class 600
Q & A for API 570 Practice Exam Open Book (100 Questions)
19. When performing a small patch repair, what is the maximum electrode diameter, type
of electrode, and type of weld bead required when the temperature is below 32 °F (0 °C)?
A) Max electrode diam. = 5/32 in. (4.0 mm), cellulosic type deposited with stringer beads
B) Max electrode diam. = 1/8 in. (3.2 mm), cellulosic type deposited by weaving of weld beads
C) Max electrode diameter = 5/32 in. (4.0 mm), low-hydrogen type deposited with stringer beads
D) Max electrode diameter = 1/8 in. (3.2 mm), low-hydrogen type by weaving of weld beads
Answer = C … Reference: API 570, Annex C, Section C.2
20. What is the PWHT temperature range, holding time/inch, and minimum holding time
for a weld on ASTM A-333 Gr. 8 material with a joint thickness that measured 2.01 in.?
A) PWHT range = 1,100 – 1,200°F, holding time/inch = 1 hr, & minimum holding time = 2 hrs
B) PWHT range = 1,100 – 1,325°F, holding time/inch = 1 hr, & minimum holding time = 2 hrs
C) PWHT range = 1,300 – 1,375°F, holding time/inch = 1 hr, & minimum holding time = 2 hrs
D) PWHT range = 1,025 – 1,085°F holding time/inch = 1 hr, & minimum holding time = 2 hrs
Answer = D … Ref: ASME B31.3 Table 331 & Notes 1 material = 9% Nickel = P-No 11A
21. What is the acceptable range of magnetizing current (amps) required for prod spacing
of 6 inches on an as welded NPS 24 Schedule 40 ASTM A-106 Gr. B pipe weld?
A) 600 to 750 amps B) 720 to 880 amps C) 800 to 1000 amps D) None of these are correct
Answer = D … Ref: ASME V, Art. 7, T-752.2 API 574 value = .688 in 90 to 100A/in
Solution: 6 inches x 90 = 540, 6 inches x 100 = 600 540 – 600 amps None of these!
22. When using water-washable penetrants, excess penetrant shall be removed with:
A) A fine water spray not exceeding 5 psi with a water temp not exceeding 120°F (52°C)
B) A fine water spray not exceeding 10 psi with a water temp not exceeding 120°F (52°C)
C) A coarse water spray not exceeding 25 psi with a water temp not exceeding 110°F (43°C)
D) A coarse water spray not exceeding 50 psi with a water temp not exceeding 110°F (43°C)
Ans = D … Ref: ASME V, Art. 6, T-673.1 Also BOLD ITEM T-673.3 PT No-No’s!
A) Soil to air interface piping showing corrosion to a minimum depth of 12 in below the grade
B) Soil to air/asphalt interface piping showing evidence of corrosion without CP system present
C) For piping buried in lengths greater than 100 ft (30 m) without CP system present
D) None of these statements are correct regarding soil corrosivity checks
Answer = C … Reference: API 570, Para. 9.3.4
Q & A for API 570 Practice Exam Open Book (100 Questions)
24. To be exempt from pressure testing after repairs, the requirements for socket welds
include all of the following EXCEPT:
A) Welds are to be examined with appropriate NDE as specified by authorized piping inspector
B) Spacers designed for socket welds shall be used to establish a minimum 1/16 in/1.6 mm gap
C) Socket welds shall be per ASME B31.3 (Figure 328.5.2.c) & shall be a minimum of 2 passes
D) MT or PT shall be performed on both the root pass and final completed pass of socket welds
Answer = D … Reference: API 570, Para. 8.2.7 Socket welds are fillet welds and only on
the final completed pass is MT or PT required Butt welds get MT or PT on the root pass
25. All the following statements are true about ASME PCC-2 and Inspector should refer to
ASME PCC-2 for all of the following information (info) EXCEPT:
Answer = D … API 570, Paras. for PCC-2 A = 8.1.4.2, B = 8.1.4.1, C = 8.1.5, D = 8.5 &
PCC-2 provides more information on pressure tests (not NDE in lieu of Pressure Tests)
26. Fewer CMLs can be selected for piping systems with all of the following characteristics
EXCEPT:
27. All the following statements are true about API 579 and the Inspector should refer to
API 579 for all of the following information EXCEPT:
A) Use 579 to obtain info on additional considerations for pressure tests (use lower test pressure)
B) Use 579 to evaluate metal loss when it is not in excess of the specified corrosion allowance
C) Use 579 to evaluate blisters, laminations, weld misalignment, distortion, and fire damage
D) Use 579 to evaluate crack-like flaws (including excessive undercut on existing piping system)
Ans = B … 570, Para. 5.8 & 7.4 when it is in excess of the specified corrosion allowance
~~~~~~~~~~~~~~END OPEN BOOK SECTION 27 QUESTIONS~~~~~~~~~~~~~~~
~~~~~~~~~~BEGIN CLOSED BOOK SECTION 73 QUESTIONS~~~~~~~~~~
Q & A for API 570 Practice Exam Closed Book (For all 2011 Exams)
28. An API Authorized Piping Inspector must have the required education, training and
experience qualifications related to the design, construction, repair and inspection of piping
systems. Authorized piping inspectors shall be qualified & certified in accordance with
what code requirement?
29. An API Authorized Inspection Agency may be defined as any of these below except:
A) An owner or user of piping systems who repairs or alters his equipment per API 570
B) Contractor with qualifications acceptable to an owner or user of piping systems and who
makes repairs or alterations in accordance with API 570
C) One who is authorized by, acceptable to, or otherwise not prohibited by a jurisdiction and
who makes repairs in accordance with API 570
D) A Group outside of a Jurisdiction that travels into a new location and does Repair Work
Answer = D (API 570, Para. 3.1.79 Definition)
32. API 570 Authorized Piping Inspectors are responsible to the Owner/User for all of the
following EXCEPT:
33. When designating an injection point circuit for purposes of inspection, it may be
appropriate:
A) To extend the circuit to the next fitting downstream of the injection point
B) To extend the circuit two fittings downstream of the injection point
C) To extend the circuit to the next specification break
D) To extend the circuit to the next piece of pressure equipment
Answer = D (API 570, Para. 5.5.9)
34. API 570 recommended upstream limits of an injection point circuit for inspection
purposes is (Assume a 4 NPS line):
Problem: An injection point exists on a 4 NPS pipe … What is the upstream limit?
35. The owner/user or the inspector may establish inspection intervals and the thickness
measurements should be scheduled based on:
A) Not more than the remaining life as determined from calculated corrosion rates
B) Only at maximum intervals recommended in Table 2 for a given Class of piping
C) At the remaining life value or the Table 2 value, whichever is less
D) None of these is correct
Ans = D (570, Par. 6.3.3) At ½ RL value or the Table 2 value, whichever is less
36. The owner/user or the inspector may establish inspection intervals and the visual
inspection intervals should be:
A) Not more than the remaining life as determined from calculated corrosion rates
B) At maximum intervals recommended in Table 2 for a given Class of piping
C) At the remaining life value or the Table 2 value, whichever is less
D) None of these is correct
Ans = B (570, Par. 6.3.3) First sentence many miss this easy question!
Q & A for API 570 Practice Exam Closed Book (For all 2011 Exams)
37. Historically, the greatest number of incorrect material substitutions during fabrication
and construction is between what types of materials:
A) CS & Low Alloys B) CS & SS C) Low Alloy & Nickel steels D) None of these
Answer = CS substitutions into Low Alloy (CrMo) systems API 578, Para. 4.3.3.1
38. Insulating materials often “hold moisture” that creates corrosion. The ability of
insulation to draw and hold water or moisture is known as:
39. Atmospheric Corrosion rates vary greatly due to a variety of factors. Corrosion rates
increase with the temperature up to about 250°F (121°C). At temperatures above 250°F
(121°C), the equipment surfaces are:
40. A mechanical form of degradation in which cracks are produced as the result of
dynamic loading due to water hammer, slugging, or unstable fluid flow is known as:
A) Vibration-Induced Fatigue
B) Thermal Fatigue
C) Mechanical Fatigue
D) Erosion/Erosion Corrosion
Answer: A … API 571, Para. 4.2.17.1 – Vibration-Induced Fatigue Question
41. Regarding the appearance or morphology of Mechanical Fatigue, the signature mark of
fatigue failure will typically appear as:
A) Single clam shell fingerprint with vertical straight lines directly below the crack initiation site
B) Single clam shell fingerprint with rings called beach marks coming from a crack initiation site
C) Concentric lines throughout the entire cross-sectional area
D) None of these are correct
Answer: B … API 571, Para. 4.2.16.5.a & Figures 4-30/31/32/33 – Mechanical Fatigue Question
Q & A for API 570 Practice Exam Closed Book (For all 2011 Exams)
42. Regarding brittle fracture failures, cracking found will typically show evidence of:
A) Straight, non-branching cracks largely without evidence of any associated plastic deformation
B) Branching cracks having evidence of a shear lip or localized necking around the cracks
C) Both straight & multi-facet cracks with evidence of a shear lip or localized necking at cracks
D) None of these are correct
Answer: A … API 571 … Para. 4.2.7.5.a … Brittle Fracture Question
44. Critical Environmental Factors for CUI can include all of the following EXCEPT:
45. The common method used to monitor boiler water for condensate corrosion is:
46. Each owner/user should provide specific attention to the need for inspection of piping
systems susceptible to specific types and areas of deterioration. These include all EXCEPT:
A) Injection points, deadlegs, Corrosion under insulation (CUI), Soil-to-air (S/A) interfaces
B) Service specific & localized corrosion, Erosion & corrosion/erosion, Corrosion under linings
C) Environmental cracking, Fatigue cracking, Creep cracking, brittle fracture & Freeze damage
D) Contact point corrosion, Corrosion under deposits & Low temperature Corrosion
Answer = D (API 570, Para. 5.4.2) … Obviously, Low temperature corrosion is not listed
Q & A for API 570 Practice Exam Closed Book (For all 2011 Exams)
47. When an owner/user chooses to conduct RBI assessment of piping system, assessments
must include a systematic evaluation for all items listed below EXCEPT:
A) Likelihood of failure based on forms of degradation reasonably expected in a given service
B) Consequence of failure of the piping system in a given service
C) In accordance with API 580 and detailed methodology per API 581.
D) In accordance with API 579 and detailed methodology per API 581.
Answer = D (API 570, Para. 5.2 … Second Paragraph)
49. External visual inspections are used to identify all of the following EXCEPT:
50. Soil to air interface zone is generally located “where” on a piping system?
51. Loss of ductility/notch toughness in susceptible low alloys, such as ≤ 2-1/4 Cr is due to:
52. Fasteners should extend completely through their nuts. Any fastener failing to do so is
considered acceptably engaged if:
A) The end of the fastener is flush with the face of the nut
B) The lack of complete engagement is not more than 1 thread
C) The lack of complete engagement is not more than 2 threads
D) At least one thread must extend beyond the face of the nut
Answer: B (API 570, Para. 5.12)
53. These points are areas defined by a circle having a diameter not greater than 2 inches
for a line diameter not exceeding 10 inches or not greater than 3 inches for larger lines.
54. API 570 Piping Classification schemes are based upon the:
55. Long-term and short-term corrosion rates should be compared to see which results in
the shortest remaining life as part of the data assessment. Who is responsible to select the
corrosion rate that best reflects the current process?
56. To verify satisfactory PWHT, what test is conducted per ASME B31.3 requirements?
63. What term best describes a physical change in a component that has design
implications affecting pressure containing capability or flexibility of a piping system
beyond the scope of the original design.
64. Who has responsibility to the owner/user that includes the supply of materials,
equipment, quality control and workmanship necessary to maintain and repair piping
systems per API 570?
65. Injection points are sometimes subject to accelerated corrosion from normal or
abnormal operating conditions. Because of this, how must they be treated?
66. Rerating piping systems by changing MAWP & / or temp rating may be done only if all
of the following requirements below have been met EXCEPT (Select incorrect answer):
A) Piping system uses same pressure relieving device settings if capacity is not affected
B) Calculations are performed by the piping engineer or the inspector
C) Rerating is acceptable to the inspector or piping engineer
D) All piping system components are adequate for the new combination of pressure/temperature
Answer = A (API 570, Par. 8.3.e) … Relief must be reset at the appropriate new pressure
67. For existing insulated lines that are being pressure tested after repairs, rerating, or
alteration, it is not necessary to strip insulation on all existing welds. However, what actions
should be taken in lieu of stripping away of all of the insulation for the test?
A) Pressure test with shorter hold times & perform a close pressure gauge examination
B) Pressure test with longer hold times & observe pressure gauges carefully during the test
C) Check the line carefully at all exposed areas looking for small leaks
D) Pressure test with longer hold times & match mark pressure gauges before leaving the site
Answer = B (API 570, Par. 8.2.6)
Q & A for API 570 Practice Exam Closed Book (For all 2011 Exams)
A) Inspection, rating, repair, & alteration procedures for piping systems already in-service
B) May be used for modification or addition of new piping systems constructed per the code
C) May be used when in conflict with any prevailing regulatory requirements
D) Pressure vessels, heaters, or heat exchanger internal or external piping
Answer: A (API 570, 1.1.1)
69. API-570 Piping Inspection Code is intended for use and may be used by all of these
EXCEPT:
71. The owner/user shall maintain appropriate permanent and progressive records of each
piping system covered by API 570 for all of the following items EXCEPT:
73. Injection points are sometimes subject to accelerated corrosion from normal or
abnormal operating conditions, and because of this injection points are treated as:
76. Typical sources of moisture that cause corrosion under insulation (CUI) include:
78. When reviewing RT film, a darkened perfectly straight line can be seen in the very
center of the root pass (lightest area). The length of the line is about 75mm long. It is likely
which type of discontinuity?
79. The transmitted film density through the radiographic image of the body of a correct
hole-type IQI was measured with a densitometer at 2.8 in the area of interest. What is the
acceptable range of density for the film (assume no shims were used with the IQI)?
A) Cracks
B) Incomplete Penetration
C) Slag or Porosity
D) Laminations
Answer = D … ASME V, Art. 1, Table A-110 (RT Col. Product Form & weld imperfection)
81. Which of the following imperfections may appear as a dark round spots using
radiography?
82. Which of these imperfections may appear as a light white spot using radiography?
84. ASME IX Mechanical Tests (Tension Tests) are used to determine the:
85. ASME IX Mechanical Tests (Guided-Bend Tests) are used to determine the:
86. ASME IX Mechanical Tests (Charpy Impact Tests) are used to determine the:
87. Category D Fluid Service is a service where all of the following are true EXCEPT:
88. API 574 External Inspection Checklist for insulation covers all the following except:
A) Damage/penetrations in insulation
B) Missing jacketing & insulation
C) Liner deterioration
D) Banding (broken/missing)
Answer: C (API 574, Appendix A External Inspection Checklist)
89. The basic types of valves include all of the following except:
90. Valves are made in standard pipe sizes, materials, body thickness, and pressure ratings
that permit them to be used in any pressure-temp service as per what ASME document?
A) Shortening process runs by assuring piping conditions are suitable for continued operation.
B) Permitting fabrication of replacement piping after a shutdown.
C) Eliminating unnecessary work and reducing shutdown personnel requirements
D) Causing Operations to address Inspection findings
Answer: C (API 574, Section 7.2)
92. A combination of corrosion and erosion known as corrosion/erosion results in
significantly greater metal loss than can be expected from corrosion or erosion alone.
Corrosion/erosion occurs at all of the following locations EXCEPT:
A) High velocity and high turbulence areas
B) Downstream of control valves, orifices, and pump discharges
C) At any point of flow direction change, such as the outside radius of elbows
D) Upstream of pump suction locations in long runs of piping
Answer: D (API 574, Section 6.3.6 & API 571)
Q & A for API 570 Practice Exam Closed Book (For all 2011 Exams)
93. Any welding conducted on piping components in operation must be done in accordance
with this document, and Inspector shall use as a minimum “Suggested Hot Tap Checklist”
contained in this document for hot tapping performed on piping components. Which of the
following documents referenced in API 570 addresses hot tapping?
A) API 2201 B) API 574 C) ASME B31.3 D) ASME PCC-2
Answer: A (API 570, 8.2)
94. Which of the following API 570 cases does requires the approval from the piping
engineer and is considered an “alteration” as defined by API 570?
A) Changing out a damaged flange with a new flange of the same rating and material
B) Adding a small bore weld boss not requiring reinforcement
C) Changing out a corroded branch connection (no required reinforcement)
D) Adding a large bore branch connection requiring reinforcement
Answer: D (API 570, 8.1.1 & Definition in Para. 3.1) … HIGHLIGHT YOUR API 570
95. Which of the following conditions have the “highest potential” to create an emergency
should a leak occur in a Class 1 piping system containing flammable fluids?
A) Rapid vaporization on leakage B) Slow vaporization on leakage
C) No significant vaporization D) None of the above
Answer: A (API 570, 6.2.1)
96. Using illustration from ASME B16.5 (Table 5) identify Value “P” as:
99. Who shall be responsible to the owner-user for determining that the requirements of
API 570 for inspection, examination and testing are met?
100. Which of these are NOT mandatory requirement(s) for re-rating a piping system?