Professional Documents
Culture Documents
Bridge Engg 8th Sem
Bridge Engg 8th Sem
Q5. Design the Stringer for trussed girder bridge, having effective span of 60m.
The stringers are placed at 1.8m c/c and placed over the cross girder. Assume
double lane bridge with 1.5m wide footpaths and loading of IRC: Class-A. Take the
distance between the panel points as 6m.