1. A Process defines basically :


Answer : ...Choose...A running Program Who is doing what when and how to reach
a specific goal A new procedure to be implemented All of the above

2. ISO, CMM, Six Sigma are


Answer : ...Choose...Quality models Tools Programming LanguagesCoding
Standards

3. The International Standard for Quality Assurance – ISO 9001 emphasizes on :

Answer : ...Choose...

a. Process Quality (rather than product Quality)


b. Product Quality
c. Both (a) and (b)
d. Critical Component quality

4. Maintenance Process Model is best suited for


Answer : ...Choose...Problem resolution on existing software products
Interface modification due to changes in hardware or software environment Minor
functional enhancements or performance improvement of the existing software All
of the above

5. In Wipro which model representation of CMMI was adopted


Answer: Choose...

a. Rank model
b. Linear model
c. Staged model
d. Process area model

6. Achieving the goal of means your product will be defect free to an extent of:
Answer : ...Choose...

a. 13.5 defects per million opportunities


b. 3.4 defects per million opportunities
c. 4.4 defects per million opportunities
d. 4.3 defects per million opportunities

7. _______ is a process of examining whether the process conforms to the defined


quality system:
Answer : ...Choose...(Doubt)
a. Audit
b. Assessment
c. Testing Review

8. All Configuration Audit issues are recorded in -------------- and tracked to


closure:
Answer : ...Choose...
a. Software Configuration Audit Report (SCAR)
b. Software Configuration Order Form (SCOF)
c. Baseline Record
d. PMR
9. The process followed in the software development project should be:
Answer : ...Choose...Client specified processes Processes as described in
velociQ. Tailored ODC specific processes Any One of the above

10. Which of this is a planned mechanism for Defect Prevention?


Answer: ...Choose...
a. Look Ahead Meetings(doubt please check while answering)
b. PDMR and PMR reviews
c. Customer feedback
d. All of the above

11. Which Lifecycle model emphasizes preparation of plans for validation during
the early Life Cycle stages itself?
Answer : ...Choose...V-Process Model Maintenance model Rational Unified
Process Model 2I Process Model

12. You are a Project Engineer who has just joined Wipro. You want to know all
your responsibilities as defined by veloci-Q for your role. Where would you go?
Answer : ...Choose...PDB Treasure House Guidelines Navigator

13. Six Sigma measures defects based on:


Answer : ...Choose...the team’s decision Wipro’s Senior management’s
perception Customer’s perception number of defects in the project

14. _______ is a monthly mechanism to track metric trends, exceptions of metrics


and ensure Process Improvements in the Business Unit
Answer : ...Choose...QICs Look Ahead Meetings PIP Board meetings Quality meet

15. Deviations from the stated processes that are identified during the audit
are recorded as
Answer : ...Choose...Non-Conformances Process Improvement Proposal Process
Improvement and Process Development Creation of Work Plans

16. Which of the following can be used to validate the design


Answer : ...Choose...Proof Of Concept Voice Of Customer (VOC)LOC Function
points

17. The FS document may address


Answer : ...Choose...Functional requirements of the system Interface
requirements Environmental constraints All of the above

18. Organisation’s Customer Focus should meet the needs and expectations of:
Answer : ...Choose...The customers and end users People in the Organisation
Suppliers and partners All of the above

19. __________________ is a mechanism of maintaining the mapping between


requirements and products resulting from the requirements.
Answer : ...Choose...Design document Requirements Traceability Functional
design Test cases

20. The set of actions to be taken to minimize the occurrence of Risk is


documented as part of
Answer : ...Choose...Contingency plan Mitigation Plan Defect Prevention Report
Risk Tracker
21. veloci-Q has a ____ -tier architecture
Answer : ...Choose...234 Multi-dimensional

22. Which phases of SDLC can be sources for errors?


Answer : ...Choose...RS, Design, CUT, IT, ST & ATRS, Design, CUT, IT & STRS,
Design, CUT & ITRS, Design & CUT

23. Which of the below statements is incorrect on shared vision


Answer : ...Choose...Team members of the project should participate while
evolving shared vision Shared vision is evolved from individual goals and
objectives Shared vision is documented in the project plan Customer needs are
considered while evolving project shared vision

24. Each phase /activity of a life cycle model is represented in veloci-Q by the
____________ Criteria
Answer : ...Choose...WBS DMADVETVX SDLC

25. The prevention activities coming out of a LAM is documented in


Answer : ...Choose...
a. Project Plan
b. PDMR
c. Defect Prevention Report
d. Risk Plan

26. Voice Of Customer (VOC) can be used to


Answer : ...Choose...Prioritize customer requirements Select requirements
Analyze customer requirements Requirements traceability

27. The data and information of all previously executed projects are in the:
Answer : ...Choose...Project data bank PIP DB Treasure house Navigator

28. The CMMI level 5 stage is termed as a :


Answer : ...Choose...Repeatable stage Optimizing stage Iterative stage Defined
stage

29. Project Performance Analysis (PPA) is an exercise which examines :


Answer : ...Choose...Lessons learnt and best practices Individual performance
Process Improvement Proposals Conformance of requirements

30. The Six Sigma methodology we use for new product/ process development:
Answer : ...Choose...DMAIC DSSS
+Veloci-Q TQSS

31. This is the testing procedure according to which modules, sub modules are
tested and test case verification is done
Answer : ...Choose...Functional testing Module testing Unit testing System
testing

32. As per veloci-Q, in a project following V process model – the activity to


define acceptance Test Plan is recommended as part of
Answer : ...Choose...RS phase Design Phase Acceptance Testing Phase Project
Planning phase

33. A “Surveillance audit “is conducted by:


Answer : ...Choose...SQA and SEPG Technical manager External certification
agency Project Managers coordinated by SEPG
34. A NCR (Non Conformance Report) signifies :
Answer : ...Choose...Deviation from a stated process Failure of ISO
certification Deviation of coding standard Observation

35. Which of the following certifications mandate the use of Audits as a


periodic check on compliance?
Answer : ...Choose...ISO 9001:2000 CMM CMMI Six Sigma

36. Taxonomy based checklist is used for


Answer : ...Choose...Risk identification Team members Project name None of the
above

37. Wipro Technologies is assessed as a CMMI 5____Organization


Answer : ...Choose...453It is assessed at CMM only, but no level of CMMi

38. The role of a person who facilitates the six sigma team project to align
with the methodology is:
Answer : ...Choose...Green Belt Champion Black Belt Yellow Belt

39. Choose the odd one: One of the process models NOT suitable for Development
Answer : ...Choose...Iterative model n Waterfall Development model V-Process
model Conversion/ Porting Process Model

40. Which of the following is not a management review mechanism, where senior
management reviews performance of projects/ organization with respect to
Quality?
Answer : ...Choose...(Doubt)

a. PMR
b. QIC(Quality Improvement Council)
c. MRM(Management Review meetings)
d. PIP(Process Improvement Proposal) board meeting

41. Project level internal assessment at PPA stage should be carried out with
Answer : ...Choose...CMMi PA Rating review checklist SCAMPI checklist PPR
Project Data & Metrics report

42. The Assessment methodology defined by SEI for the CMMI model is
Answer : ...Choose...
a. CBAIPI
b. SCAMPI
c. PVPDCAQ

43. As per veloci-Q organization structure, the QC in a project reports to


Answer : ...Choose...PM TM SQA M b and c

44. How many Process Areas are there in CMMI:


Answer : ...Choose...
A. 24
B. 18
C. 23
D. 28

45. Release note is prepared :


Answer : ...Choose...Prior to the release , contains the list of software
items To explain the project closure norms After the final test case is executed
On acceptance of the release
46. What is the 3rd level in CMMI called?
Answer : ...Choose...Managed Defined Optimized Controlled

47. A project can be initiated based on


Answer : ...Choose...(doubt)
a. TM’s preference to develop his favourite application
b. wants his team to understand a technology
c. the contract signed by the customer
d. team feels the customer should have that application they are developing

48. The philosophy of "say what you do, do what you say" belongs to
Answer : ...Choose...the Project Manager BS7799 ISO CMMI

49. The process followed in the software development project should be:
Answer: ...Choose...Client specified processes Processes as described in veloci-
Q. Tailored ODC specific processes Any One of the above

50. ______________ in the CM process represents the snapshot of a set of


deliverables at a given point in time.
Answer : ...Choose...Baselines Configuration Audits Configuration Items CCB

51. The vital few problems identified from the Organization level Defect
Prevention activities are tracked to closure by initiating
Answer : ...Choose...Specific Task teams PIPs Six Sigma projects. Any of the
above

52. Which of the following would help us in deriving the projects specific
process from the organization’s standard process?
Answer : ...Choose...Process guidelines Project Procedures Tailoring
Guidelines Life Cycle models

53. Which Lifecycle model emphasizes preparation of plans for validation during
the early Life Cycle stages itself?

Answer: ...Choose...

a. V-Process Model
b. Maintenance model
c. Rational Unified Process Model
d. 2I Process Model

54. In the execution of maintenance projects each trigger from the customer is
recorded in a:
Answer : ...Choose...Change Request MRP MR Change control Register

55. In CMMI the Level 2 stage is described as


Answer : ...Choose...Managed Repeatable defined optimized

56. Project monitoring reviews are conducted :


Answer : ...Choose...
a. On a monthly basis
b. Whenever we have a client release
c. In the external audit meeting
d. By the SQA Team periodically

57. Release review process involves


ANS : (TM,PM,QC/TL)
Answer : ...Choose...
a. PM, customer and TM PM, QC, TM All team members entire team along with SQAM
and customer

58. Prior to start of the project, the PM should estimate


Answer : ...Choose...good idea - he can get familiar with our estimation
guidelines it is a must to plan better on execution of the project verify
estimation and address differences if any all of the above

59. ___________ methodology involves breaking of the requirements into modules


with information on Interface Requirements between the modules.
Answer : ...Choose...High Level design Top Down design Coupling Cohesion

60. Which of these is not true regarding an Observation recorded during an audit
Answer : ...Choose...This is a deviation from the stated process This does not
need closure This is a suggestion for improvement It could be a potential for
non-conformance in future

61. The different categories of Lifecycle models are


Answer : ...Choose...

a. Development, maintenance, service, testing(these are Project types not


models) (doubt) etc
b. V-process model, 2i, RUP
c. iPAT, veloci-Q, Six Sigma
d. All of the above

62. Which of the following templates are for ensuring detailed requirement
elicitation?
Answer : ...Choose...Voice Of Customer (VOC)Testing template QFD DPMO

63. The following is not a section of the project plan template :


Answer : ...Choose...
a. Resource Plan
b. Execution Process Plan
c. PDMR (Doubt)
d. Project Vision

64. Different Design approaches can be evaluated using


Answer : ...Choose...QFD Pugh Matrix FMEA none of the above

65. Who is responsible for approving the estimate?


Answer : ...Choose...
A. Project Manager
B. Technical Manager
C. Business Development Manager
D. Presales staff

66. The 'Three Times Estimate' technique involves


Answer : ...Choose...

a. Estimating using three different techniques


b. Estimation done by three people independently
c. Specifying the "Pessimistic", "Optimistic" and "Most probable" Values for
an activity
d. Estimating at three points in time proposal stage, after requirements
analysis and after design.(correct but doubt)

67. Selection criteria for design alternatives can be based on


Answer : ...Choose...Requirements and constraints Costs and benefits Risks All
of the above

68. Objectives of customer focus is to:


Answer : ...Choose...Elicit parameters that are critical to quality from
customers Collect data and metrics Track performance All of the above

69. The mechanism for obtaining customer feedback at project closure as per
veloci-Q is:
Answer : ...Choose...Create a feedback form and send it Use template in
veloci-Q as a feedback form, tailor the feedback form by including project
specific questions Call the customer and obtain feedback An acceptance mail from
the customer post project completion will suffice

70. We take customer complaint seriously


Answer : ...Choose...TRUE FALSE None of the above All of the above

71. Customer Satisfaction survey is conducted to


Answer : ...Choose...
a. obtain feedback on delivery by Wipro
b. obtain feedback on the engagement with Wipro
c. a and b
d. none of the above

72. Corrective and Preventive Action Plan should be drawn for:


Answer : ...Choose...
a. Customer complaints received
b. Customer feedback ratings
c. Customer Satisfaction surveys
d. All of the above

73. While tailoring the processes to meet the project needs, which of the
following should be ensured
Answer : ...Choose...Coverage of all phases of the selected life cycle To
define the ETVX for the phases and activities of the tailored process SEPG sign
off of the tailored process all of the above

74. Which of these are used to identify the Risks in the project?
Answer: ...Choose...Risk Identification checklist Stake holder inputs Past
project data All of the above

75. Which of these set of parameters are used for Risk Quantification in Risk
Plan?
Answer : ...Choose...Probability and Impact Mitigation and Contingency
Probability and Mitigation Contingency and Impact

76. The set of actions to be taken when the perceived risk becomes a reality is
documented as part of
Answer : ...Choose...Contingency plan Mitigation Plan Defect Prevention Report
Risk Tracker
77. The threshold value of Risk Score beyond which the Mitigation and
contingency plans need to be documented is
Answer:...Choose...181002745

78. The Six Sigma technique/tool recommended for use for Risk Analysis is
Answer : ...Choose...
a. Voice of Customer
b. FME
c. ARCA
d. Pugh Matrix

79. Effort Deviation means


Answer : ...Choose...

(Actual Ans: Difference b/w actual effort and planned effort expressed as % of
planned effort)

a. Variation between planned effort and actual effort+ effort to go PM's effort
allocated to the Team member Projected effort and planned effort Actually
consumed effort only

80. Which of this is not the intended use of Metrics?


Answer : ...Choose...To monitor the project performance To take appropriate
decisions based on measured values To monitor individual performance To revise
plans

81. Which of the below situations recommends an RCA?


Answer : ...Choose...Metrics computed as part of the project is better than
norm Metrics computed as part of the project is below norm Metrics is equal to
the norm All of the above

82. What is the monthly mechanism to record and track metrics of the project?
Answer : ...Choose...
a. PDMR(Project data and metrics report)
b. Work Plans
c. PMR(Project Monitoring Review)
d. ASR(Account Status Report)

83. Which metric is used for tracking change in requirements?


Answer : ...Choose...
a. Requirements Change Index
b. Requirements Volatility
c. CRs Index
d. None of the above

84. What does function point estimation mean:


Answer : ...Choose...A standard method to measure size of software projects A
Metric for effort calculation A review technique / mechanism An experimental
method to calculate project delivery time

85. A Functional specification review involves one of the following:


Answer : ...Choose...The following factors like safety, performance,
reliability are considered. Code review Identification and testing of sub
modules Validation of the work items with the environment

86. The effectiveness of the Quality Management System is continuously improved


through
Answer : ...Choose...Audit results, corrective and preventive actions, CSATs,
Management Review Sales reports, Balance sheets, Company audit reports Quality
group recruitments Individual Performance appraisals

87. Preventive action is different from corrective action in terms of


Answer : ...Choose...Fire Fighting Identifying the necessary action as soon as
the non conformities occurred Identifying the problems, waiting for its
occurrence and doing the post mortem study Identifying potential non-
conformities and stops the non conformitis before occurring

88. Quality Policy


Answer : ...Choose...Should not be shown to the customer as it is very
confidentialis prepared for the Mission Quality Group is used to rate the
Mission Quality Group performance every year states a clear commitment to
quality and consistent with organization goals

89. What is re-work in a development project?


Answer : ...Choose...Working late night Working on the job repeatedly
Reviewing the specifications Bug Fixing

90. stands for


Answer : ...Choose...International Organization for Standardization
International Systems for Organization International Systems Orientation
International Systems Organization

91. Purpose of Project performance report is to


Answer : ...Choose...provide the project team appropriate reward compute
average time it takes for screens to load To record the learning’s from the
project for future referencere start the project again at a future date

92. Process improvements can be suggested by anyone in Wipro


Answer : ...Choose...TRUE FALSE Only Project Managers are eligible None of the
above

93. Prototype helps in validating


Answer : ...Choose...technology design requirements technical skills

94. PDCA stands for


Answer : ...Choose...Plan, Define, Change, AddPlan, Do, Change, AidPlan, Do,
Check, ActPlan, Define, Check, Add

95. Process improvement suggestions are periodically reviewed and evaluated for
implementation
Answer: ...Choose...
a. SQA
b. External Agency
c. SEPG
d. None of the above

96. Quality is defined as


Answer : ...Choose...
a. Ability of the product to meet stated or implicit needs of customers
b. Set of process and procedures
c. Use of checklists and templates
d. All of the above

97. In Wipro, quality group is


Answer: ...Choose...

a. Part of project teams


b. A separate group headed by Chief Quality Officer(consists of SEPG, SQA Group
and Tool Group),
c. Part of a vertical
d. None of the above

98. The subgroups of the quality group are


(Actual Ans :SEPG,SQA Group, Tools Group)
Answer : ...Choose...SEPG, Tools group, Six Sigma and Knowledge Management
GroupSEPG, Six Sigma Group Tools Group, Knowledge Management Group SEPG, Six
Sigma and Knowledge Management Group

99. Organizational learning enters Veloci-Q through


Answer : ...Choose...Queries and PIP Audit findings Project Performance
Analysis All of the above

100. It is mandatory to take corrective and preventive actions for


Answer : ...Choose...(Doubt)
a. Non-conformances
b. Observations
c. Customer complaints
d. (a) and (c)

101. CMMi model outlines levels of maturity.


Answer : ...Choose...
a. 3
b. 5
c. 6
d. 8

102. In CMMi level software process is improved in a controlled manner.


Answer : ...Choose...125All of the above

103. is a cluster of related practices that are performed collectively to


achieve a set of objectives.
Answer : ...Choose...
a. Quality System
b. Channel W
c. Process Area
d. None of the above

104. In CMMi context is a collaborative effort to find strengths and improvement


areas.
Answer : ...Choose...
a. Appraisal
b. Audit
c. Assessment
d. Observation

105. An assessment consists of


Answer : ...Choose...
a. Questionnaire,
b. Documents review and Interviews
c. Review of quality System Interview of customers
d. All of the above

106. is an initiative that involves measuring and analyzing business processes.


Answer : ...Choose...
a. Six Sigma
b. Root Cause Analysis
c. Pugh Matrix
d. None of the above

107. Statistical term that describes the amount of variation in data


Answer : ...Choose...
a. Normal Distribution
b. Median
c. Standard Deviation
d. Six Sigma

108. DPMO stands for


Answer : ...Choose...
A. Defects per million opportunities
B. Defects per million occasions
C. Derivations per million opportunities
D. Any of the above

109. In a six sigma project, the problem owner is


Answer : ...Choose...
A. TMGreen
B. Black Belt
C. BeltWhite Belt

110. Six sigma methodology that is used for reduction of cycle time is
Answer : ...Choose...
A. Cross Functional Process Mapping
B. DMAIC
C. DSSS
D. Six steps

111. DSSS, DMAIC and TQSS are six sigma methodologies used for
Answer : ...Choose...
a. Reduction of cycle time
b. Defect Reduction
c. Cost calculations
d. None of the above

112. is a repository of data and learning from closed projects.


Answer : ...Choose...Project Data Bank Veloci-QSix SigmaNone of the above

113. A list of project documents, quality records and customer supplied


documents are recorded in
Answer : ...Choose...Master List of Documents Project Folder Document Bank
None of the above

114. Look ahead meetings and root cause analysis are examples of
Answer : ...Choose...
a. Defect prevention activities
b. Error capture activities
c. Appraisal activities
d. None of the above

115. Triggers for root cause analysis are documented in


Answer : ...Choose...
a. Master list of documents
b. Project Dashboard
c. Project Plan
d. Quality Plan

116. At organizational level, metrics are reviewed by management in


Answer : ...Choose...Management Review Meeting Quality Review Meeting Quality
Improvement Council Any of the above

117. Schedule deviation, effort deviation, field error rate are some of the
metrics captured for
Answer : ...Choose...
a. Service projects
b. Development Projects(/conversion or porting projects)
c. Maintenance projects
d. Any of the above

118. Difference between actual end date and planned end date expressed as a % of
planned duration is
Answer : ...Choose...
a. Requirements volatility
b. Schedule volatility
c. Schedule deviation
d. None of the above

119. Ratio of product size to total project effort is


Answer : ...Choose...
a. Effort DeviationCUT productivityOverall ProductivityNone of the above

120. The ratio of defected reported during UAT to the size of project is
Answer : ...Choose...Overall ProductivityPhantom Error RatePost Delivery
defect rateAny of the above

121. Project’s shared vision should be derived from


Answer : ...Choose...Organization Shared VisionCustomer & project
NeedsOrganizational process performance baselinesAll the above

122. Inputs for project initiation are


Answer : ...Choose...

a. Project Requirements
b. Contract/Proposal
c. Both (a) and (b)
d. Either (a) or (b)
123. The quality group responsible for process definition, metrics analysis and
quality assurance activities at organizational level is
Answer : ...Choose...
a. SEPG
b. SQA
c. Tools Group
d. None of the above

124. The quality group responsible for process definition, metrics analysis and
quality assurance activities at vertical/group vertical level is
Answer : ...Choose...
a. SEPG
b. SQA
c. Tools Group
d. None of the above

125. Acceptance criteria should be part of RS


Answer : ...Choose...TRUE FALSE Can be part of RS if provided by customer None
of the above

126. The mandatory members for RS and FS review are


Answer : ...Choose...
a. PM / TM
b. PM / TM / SQA
c. Either PM or SQA Team members

127. The mandatory members for review of plan documents are


Answer : ...Choose...TM, PM, SQA Either PM or SQA TM Tech Lead

128. Risk quantification is done based on


Answer : ...Choose...Risk probability and impact of riskRisk mitigationRisk
scheduleNone of the above

129. is used for tracking and monitoring risks.


Answer : ...Choose...Risk Management planProject planRisk Identification
checklistNone of the above

130. Modification of the approved process to suit the requirements of a project


is known as
Answer : ...Choose...
a. Process Tailoring
b. Process Approval
c. Process Deviation
d. None of the above

131. Modification of the approved process to suit the requirements of a project


are documented in
Answer : ...Choose...
a. Project Plan
b. Veloci-Q
c. Master List of Process
d. None of the above

132. The process model suited for projects with dissimilar service requests is
Answer : ...Choose...Service Process modelRational Unified Process ModelV-
Process ModelNone of the above
133. The data warehousing development process model is derived from
Answer : ...Choose...
a. Incremental Iterative Process Model
b. Rational Unified Process Model
c. V-Process Model
d. None of the above

134. For a project that involves resolving incidents, job cycle monitoring and
software upgrades, the process model to be chosen is
Answer : ...Choose...V-Process model Iterative Process model Production
Support process model None of the above

135. Estimation technique where the project activities are broken down into
smaller tasks and estimated is
Answer : ...Choose...
a. Work Breakdown Structure (WBS)
b. Function Point
c. Lines of code
d. None of the above

136. Planned and systematic activities performed to provide adequate confidence


that an item/product conforms to requirements is
Answer : ...Choose...Regression Testing Unit Testing Quality Assurance None of
the above

137. The i model was developed by


Answer : ...Choose...Software Engineering Institute Wipro Motorola None of
the above

138. are requests to make changes to baselined work products.


Answer : ...Choose...Requirements Maintenance Request (MR)Change Request
(CR)None of the above

139. Work items that would undergo changes during product life cycle are known
as
Answer : ...Choose...Change Items Configuration Items Product Items None of
the above

140. Wipro’s quality system is known as


Answer : ...Choose...Wiq Tree Veloci-Q Project Data BankK-net

141. Wipro’s quality policy is


Answer : ...Choose...
a. Meet the needs and expectations of customers
b. Achieve customer satisfaction by providing defect free products and
services on time.
c. Attain CMMi Level 5 compliance
d. None of the above

142. Group that focus on the tools used by projects and the impact of using
tools is
Answer : ...Choose...Tools group SQA SEPGAll of the above

143. Practitioners working on projects can suggest process improvements through


a
Answer : ...Choose...Process Improvement Proposal Change Request Email/Phone
All of the above
144. are the industry standards and benchmarks for quality.
Answer : ...Choose...Six Sigma Quality Models Veloci-Q ChannelW

145. Bureau of India Standards emphasizes on


Answer : ...Choose...Project Quality Process Quality Quality Models Product
Quality

146. In Veloci-Q, intentions and directions for quality initiative are


documented in
Answer : ...Choose...Policies section Procedure section Guidelines section All
of the above

147. In a project context, who needs to do what is documented in


Answer : ...Choose...Policies section Procedure section Guidelines section All
of the above

148. Process artifacts that help to perform project activities in a standard


manner are
Answer : ...Choose...Policies Procedures Checklists and Templates All of the
above

149. The extent to which a specific process is defined, managed, measured and
controlled within an organization is known as
Answer : ...Choose...Software Process Maturity Procedures Capacity Measurememt
Maturity Capability Maturity Model Any of the above

150. The two representations in the CMMI Framework are:


Answer : ...Choose...Integrated and Staged Integrated and Continuous Staged
and Continuous None of the above

151. The philosophy of is based on the key principles like:


Answer : ...Choose...Say what you do, do what you sayRecord what you did and
check the resultsAct upon the findingsAll of the above

152. ____________ documents all change requests to baselined items.


Answer : ...Choose...Change Register Change Control Register Configuration
Register Change Request Register

153. Configuration audits are verification mechanisms used to ensure that


deliverables are:
Answer : ...Choose...Defect free On schedule Consistent with requirements None
of the above

154. The different types of Reviews are:


Answer : ...Choose...
a. Formal / Table reviews
b. Peer / Online Reviews
c. Project Monitoring Reviews
d. Both a and b

155. _________is used to document the features/functionality to be tested, test


strategy and testing methods to be used.
Answer : ...Choose...Test Plan Test Form Test development Test Design

156. _________ serves as an important verification activity to ensure the


completeness of testing in order to ensure product quality.
Answer : ...Choose...Unit Testing Integration Testing Test Audit System
testing

157. __________ matrix is an aid to trace requirements across different phases


of development.
Answer : ...Choose...Traceability Requirements Change request All of the above

158. _________ is a technique used for arriving and prioritizing requirements.


Answer : ...Choose...Pugh matrix Quality Function Deployment (QFD)Voice Of
Customer (VOC)All of the above

159. Pair Programming, Small & Frequent releases are practices recommended by
Answer : ...Choose...XP model V-Process model 2I process model All of the
above

160. Project monitoring reviews are conducted to


Answer : ...Choose...
a. review project progress
b. understand project requirements
c. monitor requirements volatility
d. All of the above

161. ________ is defined as any adverse event that is likely to occur.


Answer : ...Choose...
a. Change request
b. Risk
c. Maintenance
d. request Disaster recovery

162. ________ are mistakes / faults caught during the same phase of SDLC
Answer : ...Choose...Defects Bugs Errors All of the above

163. The process model applicable to projects that involve development of new
products or major enhancements to existing products is
Answer : ...Choose...V-process model Waterfall process model Iterative process
model None of the above.