Professional Documents
Culture Documents
A 17-10-2017
B 01-11-2017
C 11-01-2018
D 19-01-2018
E 26-01-2018
I F 23-03-2018
G 13-04-2018
H 24-04-2018
I 11-05-2018
THE OWNER:
ATTACHED WITH SUBMISSION NO: DATE: / / 2016
EMAIL : DUONGDAIARCH@GMAIL.COM
SUBMISSION TITLE:
STRUCTURE
BLDG NAME:
PACKAGE 2 - CASINO,
NW HOTEL & ALL SUITE HOTEL
DRAWING TITLE :
Name: Sign:
Name: Sign:
DRAWN BY NGUYEN DUC LOI
Name:
TRANSLATOR
2_MS-ST-P8-1
A1(841x594)
REVISIONS
A 11-01-2018
B 19-01-2018
C 26-01-2018
D 23-03-2018
G 11-05-2018
THE OWNER:
ATTACHED WITH SUBMISSION NO: DATE: / / 2016
EMAIL : DUONGDAIARCH@GMAIL.COM
SUBMISSION TITLE:
STRUCTURE
BLDG NAME :
PACKAGE 2 - CASINO,
NW HOTEL & ALL SUITE HOTEL
DRAWING TITLE :
Name: Sign:
WM.LEUNG
PROJECT DIRECTOR
Name: Sign:
DESIGN PRINCIPAL HA ANH MINH
Name: Sign:
CHECKER TRAN VIET CUONG
Name: Sign:
PROJECT DESIGNER NGUYEN HUU HUYEN
Name: Sign:
DRAWN BY NGUYEN DUC LOI
Name:
TRANSLATOR
DRAWING NO.
2_MS-ST-P8-2
A1(841x594)
REVISIONS
Stt
No. Date Description
DRAWN By CHECKED By
10000
04 12.04.2018 LST TEY LAYOUT REVISED AS CLOUDED
400
400
305 T+305 T+305
3050
3050
3050
UP PD. PST9 UP PST8 PD. site by the Main Contractor.
16R PST9 16R 2. It is the Main Contractor's responsibility to coordinate all
PST8 16R +20.15 18R +20.15 NSCs. The Main Contractor shall submit shop drawings as
+17.305 necessary for the Architect's comment and approval prior
+17.305 to fabrication and works commencement. The shop
+20.10
+20.10 drawings submitted by the Main Contractor shall be
+17.28 drawings which have been coordinated amongst all NSC
+17.28
and incorporate all relevant builder's works with setting out.
3685 (3000 MIN. CLEAR) 3000 (3000 MIN. CLEAR) 280 3560 (3000 MIN. CLEAR) 3. The Main contractor shall coordinate with all NSC to ensure
all relevant combined builder's work requirement are
coordinated and incorporated in the ABWF shop drawings
prior to works commencement.
4. The Main Contractor shall closely coordinate with all NSC to
verify interfacing details and queries so arose and shall
280 settle together with relevant NSCs.
380 3350 280 15EQ.=4200 280 1890 1160 3350 5. The Main Contractor shall ensure their works comply with
17EQ.=4760 1890 1720 2000 Local Vietnam Codes and the conditions in all approved
3050
3050
A UP
16R
UP
16R
NOTE:
WOY-P2-PO-A-17-0502 16R 18R
1. All ISD drawings are subjection to CBWD and
CSID approval.
2. Architectural Facade drawings need to be read in conjunction
with the Facade drawings issued by the Facade Engineer.
The Main Contractor shall coordinate with facade NSC and
submit shop drawing for approval prior to work
commencement.
LEGENDS:
MASONRY WALL
3200
DO NOT SCALE OFF DRAWING. THIS DRAWING IS NOT FOR CONSTRUCTION
PURPOSES UNLESS EXPRESSLY STATED. ALL RIGHTS RESERVED AND
200
REPRODUCTION IN ANY FORM MUST BE APPROVED BY WONG & OUYANG (HK) LTD.
THE OWNER:
ATTACHED WITH SUBMISSION NO: DATE: / / 2016
400
TEL : +852 2968 1881 FAX : +852 2968 1771
WEBSITE : WOHK@WONGOUYANG.COM
305 T+305
3350 17EQ.=4760 1890 1720
PD.
1500
1500
PST8 300mm SURFACE PD.
CHANNEL
+23.26
3050
1550
1550
17R 17R
PHASE 1
3685 (3000 MIN. CLEAR) 3060 (3000 MIN. CLEAR) 3360 (3000 MIN. CLEAR)
DESIGN DISCIPLINE:
1550
UP
+27.85
17R
+23.95
+29.195 UP NW HOTEL & AS HOTEL
17R DRAWING TITLE :
UP
+23.90 8R
3050
3050
3050
UP
18R
4R 3010
17R STAIRCASE
PST8 , PST9 & PST13 (2)
1500
1500
PROJECT DIRECTOR
Name: Sign:
DESIGN PRINCIPAL
Name: Sign:
CHECKER
Name: Sign:
PROJECT DESIGNER
Name: Sign:
+23.95
DRAWN BY
Name:
+23.90 TRANSLATOR
DRAWING NO.
WOY-P2-PO-A-17-0501 05
A1 (841x594)
REVISIONS
Stt
No. Date Description
DRAWN By CHECKED By
+27.90
NSCs. The Main Contractor shall submit shop drawings as
+23.95
necessary for the Architect's comment and approval prior
to fabrication and works commencement. The shop
drawings submitted by the Main Contractor shall be
drawings which have been coordinated amongst all NSC
and incorporate all relevant builder's works with setting out.
2200 MIN. CLEAR 3. The Main contractor shall coordinate with all NSC to ensure
all relevant combined builder's work requirement are
coordinated and incorporated in the ABWF shop drawings
+31.70
PD.
PD.
5. The Main Contractor shall ensure their works comply with
Local Vietnam Codes and the conditions in all approved
+23.26
(3000 MIN. CLEAR)
+29.22
MIN. HEADROOM
MIN. HEADROOM
MIN. HEADROOM
commencement.
+14.46
3560
PST13
PST13
PST9
PST8
PST9
PST8
PST8
PST9
PST9
(1500 MIN. CLEAR)
AT 2200
AT 2200
AT 2200
LEGENDS:
PST8
1600
+32.20
MASONRY WALL
SECTION A-A
2200 MIN. CLEAR
+7.325
2200 MIN. CLEAR 2200 MIN. CLEAR 2200 MIN. CLEAR 2200 MIN. CLEAR 2200 MIN. CLEAR 2200 MIN. CLEAR 2200 MIN. CLEAR
10000
THE OWNER:
2200 MIN. CLEAR ATTACHED WITH SUBMISSION NO: DATE: / / 2016
+26.24
PST13
PST8
FOREIGN CONSULTANT COMPANY FOR ARCHITECTURAL/PLANNING
PST9
PST8
PST8
PST8
PST9
PST9
(3000 MIN. CLEAR)
+23.26
+6.80
27/F, DORSET HOUSE, TAIKOO PLACE,
979 KING'S ROAD, HONG KONG.
TEL : +852 2968 1881 FAX : +852 2968 1771
WEBSITE : WOHK@WONGOUYANG.COM
+29.195
EMAIL : DUONGDAIARCH@GMAIL.COM
SUBMISSION TITLE:
ARCHITECTURE
BLDG NAME :
PACKAGE 2 - CASINO,
NW HOTEL & AS HOTEL
3750 3600 4950 5000 3800 4050 3650 150 DRAWING TITLE :
MEZZ
MEZZ
+32.45
+28.70
+25.10
+20.15
+15.15
+11.35
+7.30
+3.65
STAIRCASE
GF
GF
LG
LG
L4
L3
L2
L1
Name: Sign:
PROJECT DIRECTOR
Name: Sign:
DESIGN PRINCIPAL
Name: Sign:
CHECKER
Name: Sign:
PROJECT DESIGNER
Name: Sign:
DRAWN BY
Name:
TRANSLATOR
DRAWING NO.
WOY-P2-PO-A-17-0502 05
A1 (841x594)
REVISIONS
Stt
No. Date Description
DRAWN By CHECKED By
+32.20
+32.15
400
150
+32.05
+32.05
1300
+30.75
3630 +30.75
Notes for ABWF:
LEGENDS:
MASONRY WALL
THE OWNER:
ATTACHED WITH SUBMISSION NO: DATE: / / 2016
400
305
PST9 PST8
3050
+26.215 +26.215
1550
UP
17R
SUBMISSION TITLE:
1550
DESIGN DISCIPLINE:
T+305
ARCHITECTURE
1500
BLDG NAME :
1690
PACKAGE 2 - CASINO,
NW HOTEL & AS HOTEL
DRAWING TITLE :
STAIRCASE
PST8 , PST9 & PST13 (4)
Name: Sign:
PROJECT DIRECTOR
Name: Sign:
DESIGN PRINCIPAL
Name: Sign:
CHECKER
Name: Sign:
PROJECT DESIGNER
Name: Sign:
DRAWN BY
Name:
TRANSLATOR
DRAWING NO.
WOY-P2-PO-A-17-0503 02
A1 (841x594)