Shift Record of Power Plant KAR4-PW-10

date :
NO. work conteans
L.O level: 1# 2# 3# 4# 5# 6# Running Condition: 1# 2# 3# 4# 5# 6#

Auto fillter drain : 1# 2# 3# 4# 5# 6# Main start vavle Water vapor: 1# 2# 3# 4# 5# 6#

Compress air tank drain: Settling tank drain sludge: Service tank drain sludge: DO boiler drain sludge:

HFO Purifier start: : HFO Purifier stop : Waste heat boiler soot blowing:

HFO settling tank: HFO sevice tank: DO tank:

hand
over

handover : takeover:

L.O level: 1# 2# 3# 4# 5# 6# Running Condition: 1# 2# 3# 4# 5# 6#

Auto fillter drain : 1# 2# 3# 4# 5# 6# Main start vavle Water vapor: 1# 2# 3# 4# 5# 6#

Compress air tank drain: Settling tank drain sludge: Service tank drain sludge: DO boiler drain sludge:

HFO Purifier start: : HFO Purifier stop: Waste heat boiler soot blowing:

HFO settling tank: HFO sevice tank: DO tank:

hand
over

handover : takeover: