OPNAME LAPANGAN PEKERJAAN PEMBERSIHAN DRAINASE

HARI :
TANGGAL :

POSISI PANJANG
NO STA SATUAN KETERANGAN
KIRI KANAN
a b c d e f g

1 4+000 s/d 4+550 √ 550.00 M'


2 8+300 s/d 8+450 √ 150.00 M'
3 9+100 s/d 9+900 √ 800.00 M'

TOTAL 1500.00 M'

KONSULTAN KONTRAKTOR
OPNAME LAPANGAN PEKERJAAN PASANGAN BATU MORTAR SIRING JEMBATAN
HARI :
TANGGAL :

NO SKETCH l1

1 Pasangan batu mortar L1 0.8


L2 0.8
0.30 TOTAL LUAS L1 + L2

L1 0.8
L2 0.8
TOTAL LUAS L1 + L2
1.30 L1
0.20 TOTAL

L2

0.80
l2 T LUAS PANJANG SATUAN VOLUME SATUAN KETERANGAN

0.3 1.1 0.605


0.2 0.160
TOTAL LUAS L1 + L2 0.765 47.000 M' 35.955 M3

0.3 1.1 0.605


0.2 0.160
TOTAL LUAS L1 + L2 0.765 32.074 M' 24.537 M3

TOTAL 79.074 M' 60.492 M3


OPNAME LAPANGAN PEKERJAAN PASANGAN BATU MORTAR SALURAN DRAINASE
HARI :
TANGGAL :

NO SKETCH l1

1 Pasangan batu mortar STA 4+925 s/d 5+001 L1 0.20


L2 0.20
L3 1.00
0.20 0.60 0.20
TOTAL LUAS L1 + L2+L3

0.80
1.00
L1 L2
0.40

L3 0.20

1.00
l2 T LUAS PANJANG SATUAN VOLUME SATUAN KETERANGAN

0.30 0.80 0.20


0.30 0.80 0.20
0.20 0.20
TOTAL LUAS L1 + L2+L3 0.60 76.00 M' 45.60 M3

#REF!