Professional Documents
Culture Documents
30-2014 CC Safety Check List TL Const May2014 TC No 30 - 2014
30-2014 CC Safety Check List TL Const May2014 TC No 30 - 2014
LOA Ref:
Available /
S.NO: CHECK LIST REMARKS, IF ANY
Not available
_______________________________________ _________________________________________
SIGNATURE / NAME / DESIGNATION SIGNATURE / NAME / DESIGNATION
OF POWERGRID REPRESENTATIVE OF AGENCY’S REPRESENTATIVE
Copy To:
_______________________________________ _________________________________________
SIGNATURE / NAME / DESIGNATION SIGNATURE / NAME / DESIGNATION
OF POWERGRID REPRESENTATIVE OF AGENCY’S REPRESENTATIVE
Copy To:
All tie members / diagonal members and all bolts are fixed as the
15 tower is erected progressively upwards to avoid uneven
transmission of loads.
16 All the nuts and bolts of STUB have been properly tightened.
The derricks are provided with adequate guys and are properly
23
tyed to the tower main leg to prevent from slipping.
In case erection of tower is done with central derrick / Gin pole,
24 adequate precautions are taken for guying / anchoring
arrangement
Adequate no. of fitters / ground helpers are deployed for the
25
Tower Erection work .
Whether the persons working in the ground are sufficiently away
26
from the tower when erection is in progress?
Whether adequate precautions are taken when working near
27
Road / Rail / River / adjoining Power Line?
________________________________________ _________________________________________
SIGNATURE / NAME / DESIGNATION SIGNATURE / NAME / DESIGNATION
OF POWERGRID REPRESENTATIVE OF AGENCY’S REPRESENTATIVE
Copy To:
(1) Regional In-charge / POWERGRID / ________________________________
(2) Projects In-charge (Region) / POWERGRID / _________________________
(3) Site Incharge / POWERGRID / _____________________________________
(4) Project Incharge / AGENCY /________________________________________
Safety Check List TL Const – 04, Revision-1(May, 2014)
________________________________________ _________________________________________
SIGNATURE / NAME / DESIGNATION SIGNATURE / NAME / DESIGNATION
OF POWERGRID REPRESENTATIVE OF AGENCY’S REPRESENTATIVE
Copy To:
(1) Regional In-charge / POWERGRID / ________________________________
(2) Projects In-charge (Region) / POWERGRID / _________________________
(3) Site Incharge / POWERGRID / _____________________________________
(4) Project In-charge / AGENCY / _____________________________________