Prepared by:
For:
December 2018
GR1841/Prop-01/SURV>-PTTI/10/XII/2018
PT Tanjung Air Berani
Tanjung Balai Karimun – Riau
Survey, Geotech & Hydro - Proposal
1. INTRODUCTION
The services from PT.BSI included all technical staffs/crew, equipments and
Laboratory. The Technical Staff will supervise the Geotechnical Drilling, Hydrology
and Hidrogeology in the field also the survey for Bench Mark, Collar and
Topography. The Drilling Crew and Drilling Equipment will be provided by Client.
2. SCOPE OF WORK
Development of this project for this stage will be undertaken as Desktop Study,
Drilling Supervision and Reporting. PT.BSI also will go to the site for site visit to do
the data validation and verification.
I. SURVEY
1. Mobilisation/Demobilisation
2. Bench Mark Installation for 2 points
3. Collar Survey for 222 locations
4. Topography Survey for 300 Ha
5. Data Processing
6. Operational & Consumable
7. Reporting
GR1841/Prop-01/SURV-GT-PTTI/11/XII/2018 Page 1 of 4
PT Tanjung Air Berani
Tanjung Balai Karimun – Riau Survey,
Geotech & Hydro - Proposal
Based on the Scope of work above, PT.BSI arrange the budget for all elements
as follows:
3.1. SURVEY
1. Collar Survey will be conducted on the 100 locations of old (previous) drillholes
with spacing until 50m x 50m and 25m x 25m and on the 30 locations of new
drillholes with spacing until 100m x 100m;
2. All the drillholes locations that will be surveyed must have the peg and the
representative of Client must guide the Surveyor to find the existing drillholes
location in the field;
3. Topography will cover around 300 Ha consists of 30 Ha of old Test Pit area.
4. Survey activities will be completed in nine (9) days subject to the existing collar
location, social issues and extreme weathered. Any additional duration due to
all those reasons, The Operational & Consumable Costs for survey will be
charged to the client in daily basis;
GR1841/Prop-01/SURV-GT-PTTI/11/XII/2018 Page 2 of 4
PT Tanjung Air Berani
Tanjung Balai Karimun – Riau Survey,
Geotech & Hydro - Proposal
A. SURVEY
1. 50% Down Payment will be invoiced prior to commencing the work;
2. 30% Second Payment will be invoiced after Field Work completed;
3. 20% Balance Payment will be invoiced after send the Report
The down payment must be received prior to commencement of the work and
subsequent invoicing payment is to be made within 14 calendar days upon receives
the invoice.
Late payment will be charged a penalty 0.25% per-day of the total invoiced.
The offer is valid for 30 calendar days from date of the submission.
A. SURVEY
1. Mob/Demob : 2 Days
2. Field Work : 4 Days
3. Data Processing : 3 Days
4. Reporting : 2 Days
GR1841/Prop-01/SURV-GT-PTTI/11/XII/2018 Page 3 of 4
PT Tanjung Air Berani
Tanjung Balai Karimun – Riau Survey,
Geotech & Hydro - Proposal
In witness, hereof the parties to this agreement have caused their duly authorized
representative to execute this agreement in duplicate copies, each of which shall be
deemed an original on this ___ day of December 2018
By : ………………………… By : ……………………………
………………………………… …………………………………
Signature Signature
GR1841/Prop-01/SURV-GT-PTTI/11/XII/2018 Page 4 of 4