You are on page 1of 1

Problem

A grade of -4.2% grade intersects a grade of +3.0% at Station 11 + 488.00 of elevations


20.80 meters. These two center gradelines are to be connected by a 260 meter vertical
parabolic curve.
1. At what station is the cross-drainage pipes be situated?
A. Sta 11 + 493.42 km
B. Sta 11 + 509.67 km
C. Sta 11 + 515.14 km
D. Sta 10 + 600.00 km

2. If the overall outside dimensions of the reinforced concrete pipe to be installed is 95


cm, and the top of the culvert is 30 cm below the subgrade, what will be the invert
elevation at the center?
A. 25.76 m
B. 22.15 m
C. 27.32 m
D. 21.83 m
https://www.mathalino.com/reviewer/surveying-and-transportation-engineering/problem-01-
symmetrical-parabolic-curve

Problem
A highway engineer must stake a symmetrical vertical curve where an entering grade of +0.80%
meets an existing grade of -0.40% at station 10 + 100 which has an elevation of 140.36 m. If the
maximum allowable change in grade per 20 m station is -0.20%, what is the length of the
vertical curve?
A. 150 m
B. 130 m
C. 120 m
D. 140 m

https://www.mathalino.com/reviewer/surveying-and-transportation-engineering/problem-04-
symmetrical-parabolic-curve

You might also like