Professional Documents
Culture Documents
Sugar
Refractories
Power
BCW
1.35
MTPA
9/2/2017
Bengal Cement Works 5
5
Process Flow Diagram
Clinker
Fly ash
Clinker Silo
Wagon Tippler Silo
Stacker & reclaimer
Gypsum/slag
Coal hopper
HAG
Coal mill
CVRM
Bag House Cement Silo
0
20
2014-15 2015-16 2016-17 2017-18
2014-15 2015-16 2016-17 2017-18
35
throughput enhancement by
capacity utilisation & optimization
-6.9
cvrm optimization
-2.8
2015-16 39.5
cvrm optimisation
-1.2
2016-17-18 Q1 36.0
ENCON Project with
investments
2 Reduction in running hour of Slag feeding group Bag filter fans 2014-15 0.050 0.370
3 Reduction of CVRM main drive SPC through Dam ring height adjustment from 192 to 150 mm 2015-16 2.000 15.400
5 Reduction of Packing plant SPC by replacing 160 KW compressor by 90 KW 2015-16 0.100 0.780
6 Reducing idle running of Material handling circuit drives through installation of belt starvation switches 2015-16 0.003 0.020
7 Reduction of WTP Cooling Tower fan power consumption through interlock with temperature sensor 2015-16 0.028 0.210
8 Reduction of Compressor power consumption by optimizing loading/unloading set point 2015-16 0.180 1.390
9 PLC interlock modification for process optimization ( Save 15 no of trippings) 2015-16 0.013 0.100
3 Felt seal installation at CVRM dynamic separator seal gap 2016-17 0.03 0.26
Nozzle ring area increment by removal of three nozzle blocks ( from 4.87m2 to 5.4 m2 )(
4 2016-17 0.1 0.92
reduction in nozzle ring velocity from 48 m/s to 40 m/s)
5 Dam ring reduction by 6 mm( from 122 mm to 116 mm ) 2016-17 0.03 0.32
Reduction of false air at mill reject chute flap & belt, mill inlet ducts , mill feed chute ,Separator
6 2016-17 0.09 0.76
outlet flage & Bag house chamber doors. ( from 18.4 % to 14 %)
7 Coal mill grinding media regradation & pattern change ( from coarse to fine) 2016-17 0.09 0.79
8 Stop Auxiliary bag filter fan through tapping in main bag filter fan in each packer 2016-17 0.06 0.52
Packer 1 & 2 bucket elevator group starting interlock modified to avoid group idle running during
9 2016-17 0.003 0.026
shift starting
Packer 1 & 2 belt bucket elevator & CVRM reject elevtor motor connection change from delta to
10 2016-17 0.02 0.18
star
TOTAL 0.94 8.15
Bengal Cement Works
ENCON Project with
investments
1 Power factor improvement by installing 1500KVAR HT capacitor installation 2015-16 0.500 3.860 1.250 3M
Reducing power consumption of HAG fuel firing blower through VFD
2 2015-16 0.030 0.230 0.040 2M
installation
3 Reduction of Packing plant SPC by replacing 90 KW compressor by 45 KW 2016-17 0.195 1.500 0.900 6M
Reducing power consumption of packing plant bag filter Fan by VFD
4 2015-16 0.130 1.000 1.680 1.25 Y
installation
5 Reducing power consumption of CVRM bag filter Fan by VFD installation 2016-17 0.026 0.200 0.050 3M
6 Solar power generation unit 5.5 MW 2016-17 6.000 46.200 277.200 6Y
Installation of plant logistic automation system to improve operational
7 2015-16 0.200 1.550 2.500 1.6 Y
efficiency of packing plant.
Installation of VFD in 641 FN1 & 642FN1 ( 75*2 kw) Silo bin aeration blower
8 2016-17 0.12 0.99 1.35 1.4 Y
611BL2 ,packing plant compressor & 611FN1 Silo 1 bag filter fan.
Installation of VVFD in reject bucket elevator bag filter fan , reject circuit bag 0.8
9 2016-17 0.092 0.79 1Y
filter fan & raw material feeding belts bag filter fan
TOTAL 7.3 56.32 285.77 1.25 Y
Compressor power
minimization
16
Bengal Cement Works 9/2/2017 12
ENCON Methodology: Power reports
CCR operation screen with Total KWH & KWH/T display for main drives. Daily Energy report with real time data capture
Dalmia Cements - Active Energy Report
2500 kvA 540kW Cement 2500 kVA 4150 kW 2500 kVA 6500kW Cement Solar 400kW Coal 2500kVA Trafo Spare Spare 400kW Belt MRSS MRSS
CCR Main
Column1 Trafo for Mill Separator Trafo Feeder BagHouse Fan Tafo Feeder- Mill Main Drive Power Mill Main Drive Feeder for Trafo Trafo Conveyor Feeder Outgoing Outgoing
Incomer
Wagon Tippler Fan for 561MD2 -1 for CCR 561FN1 2 for CCR for 561MD1 Feeder for L41MD1 Packing Plant Feeder-1 Feeder-2 for 491BC3 Feeder-1 Feeder-2
18-08-2016 00:02 3139752 918607 8161475 25502312 98944160 5979773 56517248 2E+06 1552036 7368597 22 10 174219 99351864 0
18-08-2016 01:02 3139876 918637 8161882 25503988 98950672 5980121 56520604 2E+06 1552268 7368969 22 10 174219 99358432 0
18-08-2016 02:02 3140001 918670 8162287 25505650 98957104 5980504 56523928 2E+06 1552422 7369341 22 10 174219 99364912 0
18-08-2016 03:02 3140126 918703 8162695 25507300 98963344 5980817 56527292 2E+06 1552422 7369711 22 10 174219 99371208 0
18-08-2016 04:02 3140253 918736 8163105 25508956 98969656 5981199 56530656 2E+06 1552422 7370084 22 10 174219 99377576 0
18-08-2016 05:02 3140378 918769 8163514 25510632 98975904 5981554 56533972 2E+06 1552422 7370441 22 10 174219 99383864 0
18-08-2016 06:02 3140472 918802 8163903 25512324 98982016 5981820 56537324 2E+06 1552422 7370780 22 10 174219 99390024 0
18-08-2016 07:02 3140560 918835 8164277 25514018 98987872 5982181 56540648 2E+06 1552422 7371014 22 10 174219 99395928 0
18-08-2016 08:02 3140652 918867 8164649 25515704 98993328 5982517 56543872 2E+06 1552422 7371288 22 10 174219 99401424 0
18-08-2016 09:02 3140816 918899 8165090 25517392 98998520 5982794 56547104 2E+06 1552462 7371545 22 10 174219 99406664 0
18-08-2016 10:02 3140934 918930 8165547 25519004 99002424 5983055 56549888 2E+06 1552693 7371823 22 10 174219 99410592 0
18-08-2016 11:02 3141020 918961 8166006 25520676 99006216 5983394 56553036 2E+06 1552926 7372062 22 10 174219 99414416 0
18-08-2016 12:02 3141158 918992 8166460 25522364 99009136 5983739 56556208 2E+06 1553156 7372329 22 10 174219 99417360 0
18-08-2016 13:02 3141297 919023 8166825 25524048 99012592 5984151 56559360 2E+06 1553384 7372614 22 10 174219 99420848 0
18-08-2016 14:02 3141380 919053 8167190 25525728 99017112 5984543 56562532 2E+06 1553608 7372890 22 10 174219 99425400 0
18-08-2016 15:02 3141464 919084 8167555 25527404 99021352 5984936 56565752 2E+06 1553608 7373204 22 10 174219 99429672 0
18-08-2016 16:02 3141574 919115 8167920 25529074 99025680 5985349 56568952 2E+06 1553608 7373560 22 10 174219 99434032 0
18-08-2016 17:02 3141734 919146 8168284 25530684 99030672 5985712 56572040 2E+06 1553608 7373898 22 10 174219 99439064 0
18-08-2016 18:02 3141840 919149 8168360 25530032 99031208 5985971 56572040 2E+06 1553608 7374225 22 10 174219 99439608 0
18-08-2016 19:02 3141903 919149 8168433 25530032 99031800 5986170 56572040 2E+06 1553608 7374473 22 10 174219 99440200 0
18-08-2016 20:02 3142046 919149 8168513 25530032 99032496 5986281 56572040 2E+06 1553608 7374836 22 10 174219 99440912 0
18-08-2016 21:02 3142186 919149 8168601 25530032 99033232 5986389 56572040 2E+06 1553608 7375220 22 10 174219 99441640 0
18-08-2016 22:02 3142505 919149 8168682 25530032 99034240 5986549 56572040 2E+06 1553608 7375594 22 10 174295 99442664 0
18-08-2016 23:02 3142571 919149 8168761 25530032 99034904 5986698 56572040 2E+06 1553608 7375954 22 10 174295 99443328 0
19-08-2016 00:01 3142676 919149 8168903 25530032 99035616 5986794 56572040 2E+06 1553608 7376318 22 10 174295 99444048 0
Total Consumption 2924 542 7428 27720 91456 7021 54792 18624 1572 7721 0 0 76 92184 0
9/2/2017
Bengal Cement Works 20
Innovative Project (without investment): 1
❖ Projec: Baffle plate installation at Mill inlet duct to distribute uniform heat content to mill through all ducts
❖ Objective: To save thermal energy consumption by effective utilization of supplied heat inside mill
Heat contribution by VRM inlet ducts ( Kcal) PSC heat cons(Kcal/Kg) vs Slag moisture%
100 14
Before modification After modification
10.94 10.61 11.6 12
10.09.2016 10.11.2016 04.04.2017 25.05.2017 80
10
Temp ( % of Temp % of Temp ( % of Temp % of total
60 79.5 9.1
Deg C) total ( Deg total Deg C) total ( Deg heat 66.8 8
heat C) heat heat C) content to 59.3 6
content content content mill 40 49
to mill to mill to mill 4
5.0 0.8
4.4 4.4 0.8 0.7 0.7
4.1 4.0 4.0 3.9 4.0 0.65
4.0 3.8 0.6
0.6 0.6 0.5
0.5 0.4
3.0
0.4
2.0
0.2
1.0
- .0 0.0
Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16
April'16 May'16 JUNE'16 JULY'16 AUG'16 SEP'16 OCT'16 Nov'16 Dec'16
Benefits :
▪ Energy saved : 92000 KWH in 2016-17
▪ Energy saved : 0.3 KWH/T
▪ Money saved: 0.79 Million INR
9/2/2017
Bengal Cement Works 23
Innovative Project ( without investment ): 3
❖ Project : Elimination of Auxiliary bag filter fan through tapping in main bag filter fan in each packer
❖ Objective : To save the power consumption for two dedusting fan with successfull dedusting of the circuit
✓ Scope: Each packer is facilitated with two bag filters of 46000m3/hr & 23000 m3/hr. wheteher as per flow
measurement it was analysed that @ 17 m/s velocity , the circuit dedustiong volume requiremet is only 32000 m3/hr, can
be managed by running a single fan of 75 KW.
✓ Action taken :
▪ An inhouse modified tapping is provided from the small bagfilter to larger one . the dedusting duct at designated
sources kept unaltered.
▪ The dedusting fan ( 37 KW, 23000M3/HR) is stopped. & through the suction of the remaining bigger fan ( 75 KW, 46000
M3/HR) the whole dedusting purposed is successfully resolved.
▪ saving of around 15 Kw/Hr for two packer each i.e 30 KWH .
Benefits :
▪ Energy saved : 60000 KWH in 2016-17
▪ Energy saved : 0.2 KWH/T
▪ Money saved: 0.52 Million INR
Bengal Cement Works 24
9/2/2017
Innovative Project (without investment): 3
❖ Project : Elimination of Auxiliary bag filter fan through tapping in main bag filter fan in each packer
❖ Objective : To save the power consumption for two dedusting fan with successfull dedusting of the circuit
9/2/2017
Bengal Cement Works 25
Renewable
energy
KWH
Solar 15%
Panel Transformer 12000000
Rating: 2500 MVA
Volts: 11KV / 415 10000000
Volts 85%
Nos of Tx.: 2 8000000
Solar Module, Poly 6000000
Photovoltaic Inverter
Crystalline Rating: 310
Watt
Rating: 648 KW/ 406 4000000 1910991
Volts
Nos of module: 17760 2000000
Total Output: 5.5 MWp Rating: 800 Amp HT Breaker 0
Volts: 12KV
Nos of Breaker: 2 Own
Solar Grid
consumption
System
Monitoring SOLAR POWER UTILISATION
20%
15%
15% 11%
10%
5%
0%
FY17 FY18
9/2/2017
Bengal Cement Works 27
Water
consumption
reduction
Bengal Cement Works 9/2/2017 28
33
Reduction in process Water consumption :
Water consumption KL/T
0.17
0.18
0.16
0.14
0.12
0.10
0.08
0.08 0.07
0.06
Zero water spray for PSC
0.04
0.02
water spray for PPC is only 2 % of total feed.
0.00
2014-15 2015-16 2016-17
▪ Reduction of Fuel oil consumption by improving reliability Scope 1 : Direct CO2 emissions Scope 3: Indirect emissions from
0.047 recieved clinker
0.262
0.026 0.221
Slag % in PSC Fly ash % in PPC 0.025 0.180 0.169
0.020
80 35.5
63.15 63.16 64.06 34.89 34.83 34.86
35
60 50.14 34.5 2014-15 2015-16 2016-17 2017-18 2014-15 2015-16 2016-17 2017-18
34
40 33.21
33.5
33
20
32.5
0 32
2014-15 2015-16 2016-17 2017-18 2014-15 2015-16 2016-17 2017-18
9/2/2017 31
Bengal Cement Works 31
Going
green
Bengal Cement Works 9/2/2017 32
35
Greenbelt Development Initiative
PLANTED SAPLINGS ( SURVIVED) PLANNED DEVELOPEMENT OF GREEN BELT
16000 14378
14000 3% valuable trees with
11423 big trunk
12000
10000 8701 flower
8000 31% 38%
6000 fruits
4000 3031
2000 medicinal
0 6%
2014-15 2015-16 2016-17 2017-18(4M) 7% ornamental
15%
❖ Systematic green belt development initiative :
▪ Total 37500 nos of survived saplings till FY 2017-18 . Survival
rate is around 85%.
▪ 25% of total acquired area is developed as a green belt
▪ 126 types of different species is planted through out the plant
area.
▪ Quick growing forest tree plantation initiative along boundary
line having wood value & dust prevention potential.
▪ Landscaping garden development at around 3 acre area for
beautification
Greenbelt Development Initiative
Green house for seedling development