Professional Documents
Culture Documents
,'" {
"
-') ,'1 /:r' ":' ..,, ....;r. ;':.. "+.~ C
" ")4e'pub1ic 'of¥~he~itippines
1898 - 1998
."~
J
M.aY,15, 1998
DEPARTMENT ORDER)
NO. __ ,..
Ser' i €?Si
Zl.. 'r\t';
of :I.<19..••
- - - - - - .- - - - - - - - - - -
Ef·fE?ct:i.
ve clarfuar'y 2 , 1999, on I y accredited project
engirH;:~er'sand i nspectol"~?J may be assigned to supervise DPWH
pr·c3jf:,"ctsi.
1
b. Materials Quality Control 4% maximum
1 - projects
10 = 4%
11 -
15 pr'oJects = 6%
16 - 20 projects = 8%
More than 20 projects = 10%
2
For each rating period, the equivalent points
prescribed in Department Order No. 207, Series of 1991
as shown below shall be applied.
ADJECTIVAL RATING VALUE POINTS
a 1.0 100
1.1 99.26
1.2 98.55
1.3 97.84
1.4 97. 13
1.5 96.42
1.6 95.71
1.7 95.00
VB 1.8 94.00
1.9 92.68
2.0 91 • 40
2.1 90.12
2.2 88.84
2.3 87.84
2.4 86.28
2.5 85.00
S 2.6 84
2.7 83
2.8 82
2.9 81
3.0 79
3.2 78
3.3 77
3.4 76
3.5 75
3
The classification of field engineers shall be as
follows
4
3.2 All Chiefs of the Construction Section of the District
Offices must apply for accreditation. Only accredited
Chiefs of the Construction Section may act as Project
Engineer.
Project Engineer
5
Project Inspector
1..
l ...=
b) The applicants will be evaluated strictly in
accordance with the criteria set forth in the
preceding sections of these Guidelines.
Weight
8
c. Project Management and Supervision
NAME
OFFICE
OFFICE ADDRESS
POSITION TITLE
AGE
ELIGIBILITY
LENGTH OF SEF~VICE c\) Wi th DPWH: . _
b) Outside DPWH: __ . _
TRAININGS/SEMINARS:
" --------
----.-------.------.
------.-------------------- -------- "
(Provide separate sheet, if necessary)
"
EXPEF\ I ENCE ~
Numerical Rating
Rating Per'iod Adjectival Rating
.
------------. -------- --- ...
- ...-----.-.--.-
ACCREDITATION EXAMINATION:
Rat:. i ng ::::
Applicant's Signature
:1. 1
OTHER RELEVANT INFORMATION
RE - ACCREDITATION OF DPWH FIELD ENGINEERS
About 21% (735 out of 3,500) of our field engineers are not
registered civil engineers.
TAB L E
Number of projects handled by
field engineers per year, before accreditation
.--------------.-------.-------.-------------------.-------.---------
• ••• I. .
I
..--------------.-------.-------.-------------------.-------.---------
... ... .
:--------------:-------:-------:-------------------:-------:---------:
TAB L E 2
Number of projects to be handled
by field engineers per year, after accreditation
------------------------------------------------------------------------
:Number of Field:Number of Projects :Ave. No. of Proj. to:
District Engineers :Per CY 1997 Program:be handled per year:
Office :-------:-------: (Includes APP, CDF :---------:----------:
PE PI: and DECS projects): PE PI
--------
...
1 1
"
1 -------------,---
... 1 _
.........
1 ---_--_-1----_-_1 1 ------- 1_- 1, 1•.
..............
I I I C I 1 1
..............
1 -- 1 1 1 ---------_- __ 1_- 1 1
TABI....E :j
Number of Projects Handled by a
Project Engineer At Any One Time
-.-----.- -----.--------.------------------.---------
..
Before After
Di st!"·
ict Accreditation Accreditation:
Of f i c:e . Rem.::\r- k f:5
u
PE PI PE PI =
" ~