CONTENTS
PAGE
Foreword 111
introduction IV
Class F: Earthworks 37
Class L: Metalwork 79
Class O: Pipework 95
Bibliography 161
Acknowledgements 163
Malaysian Civil Enginee rig
Standard Method o Me as rein nt
COMMITFEE REPRESENTATION
COMMITTEE
E RESENTATION
The Working Grou n M~Ia
of Measurement S con dit'o o C
deve oped this docume t q n t t
Developme t Board a ys'a a B S vs
from the fo lowing rganisat ons C
~
My GESM 2
FOREWORD
FOREWORD
This Malaysian Civil Engineering Standard Method of Measurement Second Edition (My CESMM2) was
developed by the Working Group under the authority of the Industry Standards Committee on Building,
Construction and Civil Engineering. Development of this standard was carried out by the Construction
industry Development Board Malaysia which is the Standards-Writing Organisation (SWO) appointed by
SIRIM Berhad to develop standards for construction practices.
In developing this MyCESMM2, reference was made to the Malaysian Standard Civil Engineering Standard
Method of Measurement (MsCESMM) (JSM, 2018) and Malaysian Civil Engineering Standard Method of
Measurement (MyCESMM) (CIDB (M) 2011)
Compliance with a Malaysian Standard does not in itself confer immunity from legal obligations
MyCESMM2
Malaysian Civil Engineering
SEndard Method o1 Measurement - Second Edilion
(MyCESMM 2) INTRODUCTION
INTRODUCTION
MyCESMM2 has been designed to cater for various aspects of local con t t' t' d '
published to accommodate a comprehensive coverage of civil engineerin work in Mala sia.
This document is to be read in conjuction with the following documents to rovide detail clarifi t' f
the work items and to assist measurers in simplifying their tasks when describing the work items.
a> The Malaysian Standard Method of Measurement in Civil Engineering Works (MsCESMM) (JSM, 2018).
b) 'Guide to My CESMM2' which offers detailtechnicalclarifications on workitems foundin MsCESMM d
My CESM M2.
c) 'Library of Standard BQ Descriptions for My CESMM2' which contains a comprehensive o tion of list f
descriptions of work items from which measurers can extract to facilitate efficienc in the re r t'
of the bill of quantities.
IV I MyCESMM2
SECriONS IN MscESMM
^
SECTIONS IN MsCESM"
This section defines the scope, normative references, terms and definations, abbreviations and units as
of described in MsCESMl, ! (JSM, 2018).
Id This section explain about item description, modes of description, separate items, units of measurement.
measurement rule, definition rules, coverage rules, additional description rules and application of rules
as described in MsCESMM <JSM, 2018),
of
in
This section explain about coding, item numbers, coding of unclassified items and numbering of items
with additional description as described in MsCESMM (JSM. 2018)
This section explain purpose of the bill of quantities. measurement of completed work, sections of the
bill of quantities, preamble, work items, division of the bill of quantities into parts, daywork schedule,
heading, sub-headings, extent of itemisation, descriptions, ranges of dimensions, prime cost items,
provisional sums, quantities, work affected by water, form, setting and grand summary as described in
MscESMM (JSM, 2018)
This section explains insertation of rates, prices and parts to be totalled as described in MsCESMM <JSM,
2018).
MyCESMM2 I
Malaysian Civil Engineering
Standard Method of Measurement , Second Edition
IMyCESMM2) SECTIONS IN MscESMM
Class F Earthworks
Class L : Metalwork
Class O Pipework
MyCESMM2
^=^=
,,,,,,,
=..
.
11 . *
11
-^..
I"'
CLASS A
GENERAL ITEMS
MyCESMM2
CLASS A: GENERAL ITEMS -co^
MEASUREMENT RULES EFINITION RULES ADDITIONAL
COVERAGE RULES ^""
DESCRIPTION RULES
^ Measurement covered under other classes. in
< a^!'
A1 ~ -.
^ The unit of in a^
in Item description for co ^ c,
co Method. related charges (refer Section 6) measurement for
Enginee, /'SolPD/ER
^
Z general items shall =-
n,
Plant and equipment (included in Class D. Site invest19atibn work, Class G: be the sum, unless
requirements shall ^'in
Geotechn, cal work, and Class H. Pillhg work). otherwise stated. A
state the provision
~--.
re oco
for establishment.
Temporary road diversion (included in Class C: iteffic management and control quantity shall be given maintenance and
^ to
and Cbss R. Roads and pavings) against all items for co.
removal where =co
Temporary staging for piling (included in Class H: Piling work) Eng, nee, ,"SolPD/ER applicable.
^
,D
requirements of which 3
to
the value is to be ,
ascertained and
Un
determined by co
t,
reineasurement. The o
=
unit of measurement a
-
in
^
co
ADDITIONAL
SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
FIRST DIVISION DESCRIPTION RULES
M6 01 C2 A4
2 EngineerI'SO/ 2 Equipment I Office equipment sum
PD/ER 2 Maintenance of inth A quantity shall be All works other than Items for Engineei?"Sol Item description for
requirements office equipment given against all items the permanent works PD/ER requirements office equipment shall
3 Laboratory sum for Engineec, ,"Sol which is expressly shall be deemed to state the type and
equipment PO/ER requirements stated in the contract include the provisions quantity.
4 Maintenance of inth of which the value such as facilities, of water supply,
is to be ascertained equipment. services, electric ty, sanitary. A5
laboratory
equipment and determined by attendance and work and communication item description for
5 Surveying sum measurement. A unit to enable the Engineer/ facilities office, laboratory and
equipment of measurement shall SolPD/ER to carry out surveying equipment
6 Maintenance of inth be stated for each such the supervision of the CS shall specify the type
survey equipment item work sha I be classed items for Enginee","' and quantity required.
as Engineec^,"SolPD/ER SolPD/ER
requirements. requirements shall be A6
deemed to include item description
3 Services I Provision of sum
the maintenance of for equ", merit and
transport vehicle
2 Maintenance of inth camera transport vehicle shall
state when items are
vehicle
to be reverted to the
3 Provision of mobile sum
DESCRIPTION RULES
= 3 Project I Survey and setting < o. <
requirements A1o -, -.
^ out
In a ,
in
co
item description for coZ,
^ survey and sett, ing
Z
to
out shall state type of
surveys and when
^^^;
^ag,
N o00
*^ - -
licensed surveyor is Zco
required to carry out
the work. co=
C 09
2 Quality assurance/ I aA/aC plan sum M7 03 CS An
^
to
Quality control 2 Testing of materials sum B
Items shall be given in resting and tosting and item description for to
3 Testing of works sum
this class for all test, hg commissioning shall
=
commissioning shall factory acceptance
4 Factory acceptance sum for which items are be performed and
test be deemed to comply test shall state the to
separately as set out in fulfilled in accordance with the requirements material to be tested.
,D
c,
5 Testing and sum other classes. with relevant Q
as expressly stated type of test. and the a
commissioning authorities/ employer
a
number of person to
requirements/ witness the test.
I^!
^.
^
specification o
.
At2
04
item description
Testing and for testing and
commissioning commissioning of plan
shall include man shall state the duration
hours, mobilisation. in months
demobilisation.
competent personnel. A's
specific tools and all Item description for
other required items to testing of the works
operate fully functional. shall state particulars
of samples and of the
methods of testing.
A14
item description
for test, hg and
commissioning shall
state the material to be
tested and type of test.
3 Operation and I Operation and 05 A's Ci
maintenance of maintenance
The operat, bn and Item description
plant manual
maintenance of plant S;:
for operation and co
2 Training of only applies to work co
maintenance of
operating where the process
personnel
plant shall state the >
plant is required to be sequence/interval.
3 Provision of Gi
tested.
type, requirement and in
manpower Z
duration in month.
4 Provision of in
=o
chemicals >
and consumables F
5 Utility cost H
in
.^
co
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
3 Project 06 A16
07
Operation and
maintenance manual
shall include all
operational manual
material.
man hours, competent
personnel, and all
other required items to
complete the operation
and maintenance
manual for the training
4 Maintenance I Scheduled DB C6
maintenance Care of works Items for scheduled
2 Care of works shall start after the maintenance shall be
certificate of practical deemed to include
completion until labours, mobilisation
the end of defect and demobilisation
liability period or line of plant. specialist
completion whichever personnel, specific
applicable tools and all other
required items to
operate fully functional
C7 o
items for care of works
shall be deemed to
S;:
co
co
include providing
security services. >
payment of all the C,
^ utilities charges and in
Z
^
in
maintain existing in
co facilities. ^
= >
^ I~
co
-
in
^
co
Co
FIRST DIVISION SECOND DIVISION THIRD DIVISION ADDITIONAL -!,^
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
< o. <
= 3 Project 5 Maintenance of I Routine 09 C8 A17 O 9! g!
<
a requirements road maintenance - Maintenance of road nab
in
Rout, he and periodic Item description for co to-
<0
co existing road shall be as defined maintenance shall be mathtena"ce of road
=
^.
6 Clearance of C9
site upon Clearance of site upon
completion completion shall be
deemed to include
making good all
affected works.
7 Temporary works I Traffic diversion sum 0,2 CIO A18
2 Traffic regulation sum Item traffic divers^^n is 77affic diversion shall Item description for
3 Access roads sum diversion of traffic on be deemed to include de. watering shall state
4 Bridges sum existing road. temporary road controlled de-watering
5 Cofferdams sum diversion. when required.
6 Pumping sum
7 De-watering sum
Ci
8 Compressed air sum
for tunnelling
S;:
co
co
a Access to site I Restrictions on sum Me >
working hours Items access to site
2 Restrictions on Ci
sum shall be provided in
working methods where there are Z
in
restrictions on working =.
hours, >
I~
^
in
.^
co
ADDITI AL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I^
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD D VISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
2 Bridges sum
3 Cofferdams sum
dewatering
o
5 River diversion sum
6 Jetty sum ^;
co
7 Staging sum co
a Compressed air sum
>
3 Temporary work I Access scaffolding sum
C)
Z 2 Support scaffolding sum in
^
in
and propping Z
in
co 3 Piling sum :.
^ 4 Formwork sum >
^ F
N 5 Shafts and pits sum
-
6 Hardstanding sum in
^
co
^
o ~coZ
FIRST DIVISION SECOND DIVISION THIRD DIVISION ADDITIONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^
I^I
^
o
.
6 Mobilisation and C, 4 A22
demobilisation Mobilisation and Item description for
demobilisation shall mobiliset, bn and
be deemed to include demob"isetion state
reinobilisation. if the conditions on
expressly required. how reinobilisation is
required.
C>
511
co
co
>
6 Independent I Structural sum
Gi
checkers fees 2 Geotechnical sum in
Z
3 Road safety sum
in
20
>
I~
H
in
^=
co
TEMS
o
85
545
00 1140
CLASS B
ENVIRONMENTAL
PROTECTIO N AN D
ENHANCEMENT
MyCESMM2 I
^
~coZ
N ADDITIONAL
CLASS a ENVIRONMENTAL PROTECTION AND ENHANCEMENT MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
MT CT O, -
^ Measurement covered under other classes: in=
.:^ Temporary works and Preparation of ENp co ^ CD
in
co Traffic management and control (included in Class C. 778ff!c management and permanent works shall flora survey report, ^.
of the environmental a
.
specialists registered
with DOE required
for carrying out the C)
respective survey and
the preparation of the ^:
co
said survey report. co
^
C2
in
item for appointment Z
of environmental <
officer shall be deemed ^
o
to include appointment Z
of qualified and ^
experienced officer. in
Z
FIRST DIVISION SECOND DIVISION THIRD DIVISION >
r
I Environmental I Preparation of D, A1 ^
=O
management plan environmental EMP is a document Item description on the o
management plan describing the preparation of the EMP
in
2 Appointment of man-inth contractor's proposal shall state additional
environmental on the contractor's requirements. SI
officer organisation o
Z
structure, work
>
programme related Z
to environmental
o
abatement and in
mitigating measures, Z
environmental =
>
monitoring Z
programmes, and Ci
in
environmental auditing Z
and reporting. in
Z
^
.
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION UNIT MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
a
and reporting. in
Z
H
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I Environmental 02
=
gabion mattress. Filling mattress shall state in
shall be deemed to Z
^ material type and wire =
in
un
be imported, unless gauge size >
^ otherwise stated Z
^ Ci
As in
N
Item description for ^
in
rock-filled gabion Z
mattress and r^>rap -I
shall state the thickness
^
-cog
ADDITIONAL
.^: ^^
^
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^^
2 Erosion and a Maintenance I Silt fence sum C7
^ in,
sediment control 2 Silt curtain sum Items for maintenance CJD ^ ,
c,
in
co
plan 3 Sand bag sum of s"t fence, slit :^ - ^ ^.
81
^
o
3 Water quality I Skid tank bund sum M2 06 C8 A9 a
control and 2 Water treatment sum Water treatment and Water treatment Items for skid tank Item description for
monitoring facilities sewage treatment focilities are used bund shall be deemed skid tank bund shall
3 Sewage treatment sum foci/in^s shall only be to treat effluent to include traps. oil state the intended o
facilities measured where it is produced by the work and grease separators, location. material and
processes in the work and its maintenance principal dimensions
S;:
expressly required. co
that are required to and removal upon co
sampling and in situ 2 Total suspended nr Sewage and effluent Sewage and effluent Items for water item description for !^
testing solid testing shall be test, hg are tests and quality testing shall water quellty testing o
5 Water quality 3 Biochemical nr measured for project analysis carried out be deemed to include shall state interval and Z
sampling and oxygen demand involving sewage on raw samples to testing by approved type of testing, testing >
laboratory testing 4 Chemical oxygen nr treatment. determine content of accredited laboratory location, duration of Z
demand o
6 Sewage and effluent or wastewater for analysis, compile report and analysis
in
effluent testing 5 Dissolved oxygen nr within parameters and submit the analysis on monthly basis for Z
6 ESCher, 'chib coli nr stated. report to the engineer the duration of the ::r
7 Ammoniacal nr on a monthly basis contract. >
for the duration of the Z
nitrogen o
a Oil and grease nr contract. in
^
in
Z
^
ADDITIONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES DESCRIPTION RULES
THIRD DIVISION UNIT
FIRST DIVISION SECOND DIVISION
S
in
Z
H
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
CIO All
3 Water quality
control and Items for sewage and Item description for
monitoring effluent testing shall water quailty sampling
be deemed to include shall state the water
testing and analysis by parameters required
accredited laboratory. by DOE, the interval
and type of testing
including the sampling
location
A12
Item description for
sewage and effluent
testing shall state
the parameters
and as required
by the regulatory
requirements
4 Air quality control I Tyre washing set CT, A's
and monitoring facilities items for tyre washing item description for Ci
2 Wash trough focilit, ^s shall be tyre washing facilities
3 Water bowser truck
nr
nr deemed to Include shall state type and
S;:
co
construct on of tyre equipment required co
4 Water sprinkler sum
washing concrete co
platform and provision A14 in
and maintenance of Item description for Z
<
water supply system wash trough shall
=.
and portable water jets state the material and o
principal dimensions Z
C12 ^
in
terns for water bowser A's
Z
truck shall be deemed Item description
>
to include the provision for water bowser F
and maintenance of truck shall state the .
the vehicle. water minimum number of ,a
C, 3 A16 :^
Items for watersprfr, kler item description for o
shall be deemed to water sprinkler shall Z
include provision and state the type. location >
Z
maintenance of water and equipment .
supply. required. in
^ Z
5 Air quality sampling I Total suspended C, 4 A17
^ particulates =
in
co
Air qua"ty sampling Item description >
= 2 Wind velocity and shall be deemed to for air qua"ty Z
Z direction include testing by sampling shall state C)
to in
3 Particulate matter
accredited laboratory. the air parameters, ^
interval and type in
Z
testing including the -
sampling location.
^ ~coZ
O. ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES EFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
5 Noise and vibration I Noise barrier in DC4 CIS Ale O 9; !!!
^ in=
< control and 2 Vibration control sum Measurement for Items for noise barrier Item description for co^o
a to-
in monitoring item of noise barrier shall be deemed noise barrier shall 73
co
Z shall be the exposed to include supply, state the height. type. ^'in
Z plain surface area on fabrication. installation. material and enclosure I. , o co
re ^^-
the traffic side of the bolts, nuts, posts and ^ to
barrier. other ancillary work. A19
3 Noise level I Ambient noise nr un,
measurement level measurement Item description cco
-,
o
a
ADDITIONAL
DEFINITION RULES COVERAGE RULES DESCRIPTION RULES
THIRD DIVISION MEASUREMENT RULES
FIRST DIVISION SECOND DIVISION
ourIng upgraaing, ^
refurbishment or in
Z
maintenance. -
ADDITIONAL
THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
FIRST DIVISION SECOND DIVISION DESCRIPTION RULES
0,2 C, 9
6 Waste management
The temporary Items for biomass
treatment I;aci"ties disposal shall be
shall be designed deemed to include
to comply with preparation and
related parameters as construction of
expressly stated. temporary area and the
disposal to approved
0,3 site.
Construction so"d
waste means any solid C20
waste generated from Items for temporary
any construction or treatment faci"ties
demolition activity, shall be deemed to
including improvement, include design and
preparatory and repair construct prior to
or alteration work divert existing flow into
as prescribed in the temporary treatment
Sol^^ Waste and Public facility and able to
Cleans, 'rig Management maintain existing Ci
Act. performance.
S;:
co
014 c21 co
Organic matter Items for bio. solid CD
including forest and waste shall be deemed in
agricultural waste to Include collection, Z
<
generated from site composting temporary
a.
clearing activities shall storage area, o
be classed as biomass. transportation and Z
haulage to designated ^
0,5 locations in
Z
Bio. solid waste H
is treated sewage I~
sludge converted to ^
5011 conditioner for =a
agricultural purposes o
in
!^
o
Z
>
Z
a
in
Z Z
^
.^,
in >
an Z
= C>
^ in
N
^
in
Z
^
^
OS ADDITIONAL -coZ
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
Z 7 Conservation/ I Preservation of I Flora survey report 0,6 C22 A21 a--
< Preservation flora 2 Relocation of flora ing^
c, Flora survey report is a items for the relocation Item description for CJD ^ ,
in
co to approved sites document identifying of flora shall be the flora survey report ==
= 3 Relocation of flora the flora species and deemed to include shall state the number
^ ^C,
N
to arboreta their distribution. in the cost of relocation or sets of documents I\, o co
^--
particular those of to the temporary to be produced. ^ 40
rare, endangered, and the final sites
un.
and endemic flora specified. it shall also c00
-
ADDITIONAL
UNIT MEASUREMENT RULES DEFINITION RULES COVERAGE RULES DESCRIPTION RULES
FIRST DIVISION SECOND DIVISION THIRD DIVISION
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES RAGE RULES
DESCRIPTION RULES
programme prior to Cj
the issuance of the o
certificate of practical Z
completion. >
Z
a
in
^ Z
<
a Z
in >
co
Z
^
C>
^ in
re
^
in
Z
H
This page is deliberately left blank,
20 I MyCESMM2
o
s'
1140 5.5
C LAS S C
TRAFFIC
MANAGEM ENT
AND CONTROL
MyCESMM2 I
N
N ADDITIONAL ~coZ
CLASS C. TRAFFIC MANAGEMENT AND CONTROL MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
Q< o. <
Measurement covered under other classes: M, or CT A1 O. ~
= in a.
^, Temporary road The traffic The preparation of item description for CJD <0
in
co Earthworks (included in Class A Earthworks). diversion involving management plan is a traffic management traffic management 7~
^ earthwork, roads, document describing plan shall be deemed plan shall state the
^ Roadwork (included in Class R: Roads and pavings). ^'in
re and pavings shall be the contractor's to include the cost of number of copies and I^, o on
^^-
measured separately proposed strategy any survey required, format of the report. Zto
under their respective and procedure to literature, references, "-
co.
classes mitigate and minimise consultations, and = 00
^
^
>
Z
>
C)
3 Traffic management I Traffic manager man-inth in
team 2 Traffic management man-inth ^
officer in
Z
3 Supervisor man-inth H
4 Traffic controller man-inth >
Z
.
C)
o
Z
^
=.
^
o
ADDITIONAL
THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
FIRST DIVISION DESCRIPTION RULES
ADDITIONAL
THIR 01VIS ON MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I Non-illuminated M3 03 CS A2
retro-reflect ve Lengths measured Barriers and barricades Items for traffic signals Item description for
sheeting for linear temporary are Impenetrable shall be deemed to temporary traffic signs
2 Portable changeable road markings shall devices meant to guide include signal posts shall state the type,
message signs not include gaps in and channel traffic or signal mast arms. size, substrate. the
<PCMS) intermittent line. away from hazardous signal lanterns, traffic reflective sheeting,
3 Traffic signals work zone area. controllers. cabling material, grade and
M4 and removal upon whether they are fixed
Area measurement for 04 completion or portable.
chevron markings shall Dellneators are devices
be the gross area to guide and channel C4 As
traffic through a work Items for temporary Item description
zone area. road furniture shall for traffic signals
be deemed to include shall state the
2 Barriers and I Heavy duty watery'
barricades sand-filled PVC 05 the supply, installation. number of optical
barrier The colour of the maintenance and systems for each set
2 Concrete barrier temporary road removal upon and the mounting
3 Wooden barricade markings, unless completion. requirements.
otherwise stated shall
4 Sand bags
be deemed to be C5 A4
5 Temporary guardrail
yellow. The supply of Item description heavy
temporary road duty PVC barrier shall
06 furniture shall be state to be filled with
Heal*, duty watery' deemed to include water or sand
sand filled PVC barrier base preparation, cost
shall include plastic of material. fabrication,
hoarding where and fixing including 61
A5
expressly required. posts, struts. bolts and
Item description
^;:
nuts. base, storage and co
for barriers and co
07 transportation.
barricades shall state I^
Super cones shall be
classed as cones where C6 the type, material. H
dimensions and ^
expressly required. Installation of >
temporary road whether fixed or ,I
Tl
3 Defineators I Cones nr
furniture shall be portable.
C,
2 String dellneators in
deemed to include
3 Flashing arrows nr A6 ^
cost for multiple >
4 Beacon lights nr
shifting within the item description for Z
5 Blinkers nr super cones shall >
contractual boundaries
6 Delineator strip nr
and its vicinities that is state the materials, Gi
in
affected by the traffic size and shape ^
management plan. including fixed or in
Z
portable. -
^ >
Z
^
in a
co
Z C)
^ o
N Z
-I
=o
o
F
N
^ ADDITIONAL -co^
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^",,
< o. <
2 Temporary road 4 Temporary road I Letters and shapes nr C7 A7 O 9! !!!
^ in' ^;
< furniture 2 Continuous line
c, markings in Temporary road item description for co^,
in
co
3 intermittent line in furniture shall be denneators shall state ^.
missing or stolen o
^
items throughout to
.
the duration of ^
the construction, co
to
and removal upon r,
o
completion. =
a
81
^
5 Mechanical robot CB A8 ^.
o
=
flagman Mechanical robot Item description for
6 Temporary street flagman shall be mechanical robot
lightings deemed to include flagman shall state
7 Vehicle-mounted cost of power whether half-man or
impact attenuator pack. installation. full-man.
maintenance and
removal upon A9
completions item description for
vehicle-mounted
impact attenuator shall Ci
state the type
S;:
co
3 Traffic management I Traffic management DB C9 A10 co
report safety report 77affic management The preparation of item description for Ci
2 Road safety audit safety report is road safety audit traffic management -
report the report on the report shall be deemed safety report shall ,a
assessment of the to include the cost of state the interval of >
71
effectiveness of the 71
any survey required, the report submission
Ci
traffic management literature, references, and the number of
plan and to identify consultations and documents or sets to ^
any unsafe conditions the production of the be produced. >
Z
and to collect any road document. it shall also >
accident data for the include the cost to An 61
in
purpose of corrective engage the road safety Item description for ^
and preventive action. auditor to carry out the road safety audit in
audit and prepare the report shall state the Z
H
09 audit report interval of the report
>
The road safety submission and the Z
audit report shall be number of documents .
prepared in accordance or sets to be produced. C>
with the Guidelines for o
The Setoty Audit of Z
H
Roads in Malaysia by :o
o
the relevant authority ,-
) NTR O L
,.
~ji^
inn
-..
>, ;^,
I'D"'..,.
I
I~ I, : S
CLASS D
SITE INVESTIGATION
WORK
MyCESMM2 I
N ,~ co <
a ADDITIONAL
CLASS D: SITE INVESTIGATION WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^^^
O 91 12
Measurement covered under other classes: M, or CT A1
^ in a g;
^ The depth of boring. Plant movement is the Items for plant Item description for coZ,
in
co Excavation not carried out for the purpose of soil investigation work (included in drilling, sampling shifting of plant and movement shall be water sample shall r=
= and testing shall be ancillaries/ equipment deemed to include state the volume. ^O,
Class A Earthworks).
^ measured from the from one borehole/test dismantling and NOco
n, .., ^ -
Mobilisation and boring for piling (included in Class H: Pillhg work). commencing surface as position to the next erecting from one A2 ^ 10
Survey and setting out (included in Class A: General items). follows: position. position to another Item description for ai -
an=
disturbed sample shall cco
Instrumentation (included in Class G : Geotechn, Cal work). ^
ADDIT ONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I t rid to nr C7 A6
Ci
S;:
co
co
.
co
I Mechanical cone A9 ^
in
2 Piezocone Item description for
dissipat, bn test shall Z
3 Dissipation test <
state the maximum in
co
hours of test required. H
= Gi
^
in
-I
co o
^ 3 Miscellaneous I Test location Z
^ marker
N
^;
o
^
^
1.1 ~co^
00 ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
4 Miscellaneous test I Hand auger I Auger ing in soil C9 A10
=
^ Miscellaneous tests
rr, a ,.
a 2 Disturbed sample item description for CJD ^ ,
in 3 Undisturbed shall be deemed miscellaneous test
co ==
Z samples using thin to include plant shall state special ^'in
^ wall tube sampler movements on the site. preparation for I^, o on
re ~--
4 Water sample equipment when ^to
CIO expressly stated to be
co=
Hand auger shall be provided separately c00
.,
deemed to include CD
a
ground water An CD
.
2 Trial pit I Excavation nr observation Item description for
2 Small disturbed nr trial pit shall state the 0'1
to
sample C, I dimensions. F1
o
3 Bulk sample nr 71.1alpit shall be =
a
4 Block sample nr deemed to include A12
lateral support, ground Item description
;;I
5 Water sample nr ^
Z
<
in
co
C)
>
o
Z
^
o
-~~- - ~~~. ~-.." *,.. ". =O
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^
o
=a
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES C VERAGE RULES
DESCRIPTION RULES
electro-chemical content Z
2 Loss on ignition nr <
in
3 Total sulphate nr co
H
content
^ Gi
<
a
4 Sulphate content nr
>
in 5 Chloride content nr
co
^ 6 pH value nr o
^ Z
re
7 Resistivity test nr
a Contaminants nr ^:
o
.o
^
ADDITIONAL
-co^
by
o MEASUREMENT RULES DEFINITION RULES COVERAGE RULES DESCRIPTION RULES
^""="
FIRST DIVISION SECOND DIVISION THIRD DIVISION < o. <
CD e: !!:.
5 Rock strength I Uriconfined in a ^;
^
6 Laboratory tests co z F1
< compress!v
CD
in strength
^^ =;
co
2 Uriconfined
='in
Z Noco
^~-.
= compressive
re ^to
strength with
Young's Modu us co=
con
and Poisson s ratio ^
40
measurement ^
to
3 Point load 5
^
4 Petrographic co
examination to
r,
o
6 Compress bi ity and I One dimension .
a
permeability consolidat on in
a
2 Variable head ^
permeability o
=
3 Fixed head
permeability
M2 07 CIS A19
7 Geophysical survey I Seismic refraction I Setting out sum
and mapping survey 21nstallation and spread Intervals of geophones A spread of installation Sett, hg out for seismic tern description
for installation and
2 Multi-channel readings for seismic refraction and readings shall refraction survey
3 Preparation of sum survey and multi, include a 24-channel multi-channelana!ysis readings for seismic
analysis of surface refraction survey and
channel analysis of seismograph with of surface wave and
wave (MASW) bedrock and soil
surface wave shall be geophones at not more resistivity prof, Ting multi-channelana!ysis
contour maps
measured along the than 5-metre intervals shall be deemed of surfoce wave shall
3 Parallel seismic I Setting out sum
for seismic refraction to include survey state the interval of
slope.
logging 2 installation and point survey and not more coordinates, reduced geophones, number of
readings than 3-metre intervals levels and topographic shots per set and the
3 Preparation of sum
for multi. channel profile for each set type of shots required.
subsurface of installation and
analysis of surface
profiles wave survey readings. A20
Item description Ci
for installation and
ISI
readings for resist, Vity co
co
profiling shall state the
type of configuration. a
number, and interval of co
electrodes required. ^
in
08 A2, Z
4 Resistivity profiling I Setting out sum M3
2 Installation and spread Intervals of electrodes Resist, Vity profiling Item description for <
fit
for res^stivity profiling shall be two- installation and reading co
readings
shall be measured dimensional with for gravity imaging
3 Preparation of sum
Gi
resistivity profiles along the slope. electrodes at not more and prof, ling shall state
than 5-metre intervals. the interval distance -I
5 Gravity imaging I Setting out sum
of every gravity meter o
M4
2 installation and point point reading. Z
readings A spread shall be
115 in line ^:
3 Preparation of o
.=.
gravity imaging ,,., - , *= ,,_10s==^,;=. '.~_ ,='4.2 a, ,~ _ "'~'~,~ -
^
.. --- an a of A1
..
7 t=annhv<ifa1 <11rvPv 6 Geological terr I Preparation of
A spread shall be point reading C
readings
115 in line ^
3 Preparation of sum
o
gravity imaging =o
n .,.
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I Preparation of Ms 09 C, 6 A22
7 Geophysical survey 6 Geological terrain
and mapping mapping them atic maps Area measured for Geological terrain items for verification item description for
geological terrain mapping and with ut, Titles provider seismic refraction
mapping and engineering geologica shall be deemed to survey and geological
engineering geological mapping shall include purchasing of terrain mapping and
mapping shall be the be in accordance necessary documents engineering geological
plan area. with guidelines and verification on mapping shall state
by the Minerals the utilities detected. the location and
and Geoscience as compared with the area of the site to be
7 Engineering I Preparation of Department Malaysia records of the utilities investigated.
geological mapping engineering
,rovider.
geological map A23
Item description for
geological terrain
mapping and
engineering geological
mapping shall state
8 Utilities detection I Locate, detect. and the requirement
and mapping map all utilities and in the Minerals
services and Geoscience
2 Verification with Department guidelines.
utilities provider
3 Conduct site
verification
by special sts Z
<
in
co
-
= 61
.<
a H
in
co o
= Z
=
Iq,
^:
o
^
^
This page is deliberately left blank.
32 I MyCESMM2
...
S'
^,*.~.**.~ , .
,~.
go 1140 sag '~' \~~*~
- -..^i^=
!,,,,,,,,
"..~^
~ .I
^.
~^,.
I"
C LAS S E
DEMOLITION AND
SITE CLEARANCE
MyCESMM2 I
L. I
^ ADDITIONAL _ !41,
CLASS E DEMOLITION AND SITE CLEARANCE MEASUREMENT RULES EFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< a<
or a A1 09:!!!
= Measurement covered under other classes in a^
Site clearance shall terns for demolition item description for
^ co ^ c,
in include general and site clearance work from which
co Str PPIng of top soil (in Iuded n Class F Earthworks) ^.
etc. o
a
ADD TIO AL
THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
FIRST DIVISION SECOND DIVISION DESCRIPTION RULES
C4
, General clearance
Items for general
clearance which
include the removal
of hedges shall be
deemed to include
the removal of
hedges stumps of any
diameter where these
are also required to be
removed.
Ms CS A4
I Trees of girth:
0.5 in - 1.0 in Girth of trees shall be items for clearance Item description for
measured I in above of trees shall be general clearance
2 Trees of girth:
1.0 in 2.0 in ground level deemed to include the and trees shall state
3 Trees of girth: uprooting and removal the nature of the
20 in . 5.0 in of stumps backfilling material
where holes left
4 Trees of girth:
exceeding 5.0 in by stump removal
are required to be
backfilled
05 A5
3 Buildings I Concrete I Individual buildings
2 Brickwork and 2 Group of buildings Methods of demolition Item description for
masonry of buildings shall be building and structures
in accordance with Ms shall state the number
3 Timber
4 Metal 2318: Code of practice of storeys and principal
for demolition of dimensions.
building. o
A6
S;:
06 Item description for co
co
The material used building and structures
in
in the classification shall state special
of buildings and method of demolition a
in
structures shall be the where required.
^
predominant material. o
A7 r
40
3
co
.
co
co
n
Q
a
a
I^!
^
o
=
M4 07 C6
in
7 Pipelines I Nominal bore:
Pipelines within Water mains, sewers. Items for demolition
Exceeding 300 mm of pipe"nes shall be
buildings and other ducts, and other
structures shall be utility services shall be deemed to include
measured separately classed as pipe"nes. demolition and removal
only where their of supports
nominal bore exceeds DB
300 mm. Pipelines shall include
pipes laid below and
above ground.
o
S;:
co
co
in
o
in
sum Ms ^
a Relocation of I Water o
sum Relocation of r
existing utilities 2 Sewerage
3 Gas sum exist, hg utilities and ^
4 Electrical sum materials reused shall o
sum be measured and Z
5 Telecommunication
described as A1. >
Z
.
co
-
in
Ci
F
in
>
,a
>
Z
.EARAN
&...
o
88
on
^
I ,O 535 ^
.........,.
^
,,,,,,
,
.
..
.
^.,.
.
+
J
,,,
~....
,
I'"'
CLASS F
EARTHWORKS
MyCESMM2 I
LLD
Co ADDITIONAL -co^
CLASS F: EARTHWORKS MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^-
DESCRIPTION RULES
< o. <
^ Measurement covered under other classes: in or Cl A1 O 9: !!!
< in.
a The quantities of Earth shall be deemed items for excavation The commencing co Z r,
in earthwork shall be
co Geotextile and geogrid Oncluded in Class G: Geotechnical work). to be materials other shall be deemed to surface shall be
7=
= computed nett using than topsoil, natural include disposal of identified in the
= Site clearance <included in Class E Demolition and site clearance). ^'in
I. ,
dimension from the hard material. rock, excavated material description of each Noco
^^-
Excavation and backfill for drain and pipe in trenches Oncluded in drawings with no artificial hard material unless otherwise item or work involving Z do
Class O. Pi^ework and Class Q. ' Dr^hage work> allowance for bulking, or unsuitable material. stated. excavation for which "-
co=
shrinkage. or wastage unless otherwise stated the commencing Cto
Excavation for piles Included Oncluded in Class H. . Plying work) Where boundaries
^
Excavation for foundation for fences and gates (included in Class shown on the drawings, Natural hardmateria/ include up holding be identified in the co
40
Miscellaneous work) measurement shall be shall be material sides of excavation, description of each n
o
made on the site other than rock and additional excavation item of work Involving a
a
artificial hard material to provide working excavation for which
M2 that requires ripping space and removal of the excavated surface !^!
^
The commencing and other specialised dead services is not the original o
a
surface adopted in equipment. surface.
the preparation of C3
the bill of quantities 03 Items description for A2
shall be used for the Rock and artificial excavation shall be Item description for
measurement of the hard material shall deemed to include artificial hard material
completed work. be material that removal of existing shall state the material.
requires the use of pipes not exceeding and depth to which
M3 hydraulic rock breaker. 300 mm of any extent it shall be
An item shall be given pneumatic tools or material or diameter. excavated
for each separate stage explosives.
of excavation where As
separate stages in the 04 item description for
conduct of the work Disposal of excavated excavat, bn in rock shall
are expressly required material shall be state the method of
deemed to be disposal blasting. and whether
M4 off the site, unless for reuse or disposal.
Detached pieces of otherwise stated in
boulders shall only be item description. A4
regarded as natural Item description for
hard materia4 rock, or 05 excavation in natural
artificial hard material Sub-ballast shall be hard material and rock
if each individually ballast placed before shall state the method
exceeds 0.5 in' in the bottom ballast is of excavation, where Ci
volume and shall be laid appropriate. ;;
co
measured separately. co
71
in
>
=O
H
^
^:
o
23
Ms 06
An isolated volume of The commencing
-
Z
^
o
^
Ms 06
An isolated volume of The commencing
artificial hard material surface shall be
or rock occuring within Identified un the
other material to be description of each
excavated shall not be item for work involving
measured separately excavation. boring. or
unless its volume driving for which the
exceeds I m' except commencing surface is
that the minimum not the original surface.
volume shall be 0.25
m' where the net width 07
of excavation is less The depths of
than 2 in. excavation stated in
accordance with the
work classification shall
be measured from the
commencing surface to
the excavated surface
I Topsoil M6 A5
I Excavation I Stripping
Area measured for Item description for
topsoil shall be the stripping of topsoil
plan area. shall state whether for
reuse or disposal.
A6
item description for
stripping shall state
the thickness of
excavation.
0,2 o
a
Disposal of excavated
material shall be
deemed to be disposal
off the site unless
otherwise stated in
item descriptions
2 Natural hard in3 The volume measured Items for excavation Excavation for
material for the excavation for for foundation shall foundation around
3 Rock ms foundat, bn shall be the include up holding pile shafts, and for
4 Artificial hard in
volume which is to be sides of excavation, underpinning. shall
material either occupied by or preparation of each be so described.
5 Unsuitable material ms vertically above any excavated surface.
part of the structure or additional excavation A12
building to provide working Item description
space and removal of for excavation for
dead services. foundat, bn to be
carried out under
water shall be so
described. C>
A13
^;
co
Maximum depth co
of excavation for r,
foundation shall be so in
described in the item >
=U
description ^
^
.^.
o
D =FINITION RULE
C7 A14
I Excavation 5 Under water M, O
Measurement of Items for excavation Item description for
excavation under under water shall be excavation under water
..
description. ^
^
^
o
^
COND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
M, ,
The volume measured
for excavat, bn below
a body of open water
shall be the nett
volume of excavation
commencing from
firm ground level such
as river or sea bed as
shown on the drawing
to which reference is
given in the preamble
in accordance with
414.
M, 2
Item classed as
excavation under water
shall be measured,
irrespective of the
method of excavation
adopted by the
contractor
o
silt shall be measured =
only to the extent that
is expressly required.
2 Excavation in3 M, 7 A16
I Double handling of I Earth
ancillaries excavated material 2 Natural hard m' Double handling of item description for
material excavated material excavation ancillaries
3 Rock ms shall be measured, only in connection with
4 Artificial hard m' to the extent that it is excavation by dredging
material expressly required shall be so described.
M, a
The volume measured
for double handling
of excavated material
shall be that of the
void formed in the
temporary stockpile
from which the
materials are removed
2 Timber support M, 9
left-in The volume measured
3 Metal support for excavation within C)
left-in borrow pits shall be the ;;:
co
net volume measured
co
for filling Tl
M20 I;!
The area measured =.
-
for timber or metal ^
supports left-in shall be ^.
the area of supported o
=.
surface for which the 7<
supports are expressly co
required to be left-in
, . ,, U, UV , . .~,,,. ~V
IRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMEN ULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
M25
Backfill material for
excavation to remove
unsuitable material
shall be measured as
Ci
filling under item for
filling for replacement. ^;:
co
co
M26
Tl
When rock is
=
.<
r, deposited into soft ^!
in
co
areas, the volume shall ^
Z be measured as in the Z
=
re transport vehicle at the ^:
place of deposition. o
^
^
co
-coZ
:^: FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES EFINITION RULES COVERAGE RULES
ADDITIONAL
^""
DESCRIPTION RULES
< o. <
^ -.
^ 3 Filling M27
in=
^ Filling of excavation co^,
in
un
around completed ^.
^ structures shall ^ 8. in
Z be measured nett re oon
re - --
between the volume of ^to
excavation under rule
co=
M9 and the completed = 00
^
structure measured co
B
from the commencing co
.
surface.
Un
co
M28 et
o
Where filling is to be =
a
deposited below water.
I^!
and the quantity ^
^.
o
cannot be measured =
satisfactorily by
any other means.
the volume shall be
measured as in the
transport vehicle at the
place of deposition.
Where filling is by
pumping, the volume
shall be measured by
settlement plates
7 High energy impact I Selected excavated M29
compaction general material other than High energy impact
filling topsoil or rock compact, bn general
21mported natural finexisting ground
material other than shall be measured to
topsoil or rock the surface area to be
3 Existing ground treated.
C,
^:
co
co
,I
^:
=O
H
=
^:
o
=o
.
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASURE E T RUL S DEFIN1 10N RULES COVERAGE RULES
DESCRIPTION RULES
A24
Item description for
landscaping and
hydroseeding shall
identify work upon
surface which is C,
46 I MyCESMM2
o
@^
go 1140 5.5
C LAS S G
GEOTECHNICAL
WORK
MyCESMM2 I
^.
00 ADDITIONAL -. co ^
CLASS G. GEOTECHNICAL WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^""
DESCRIPTION RULES
< a^
Z Measurement covered under other classes: or a A1 a e! !!:
rig^
r, Earth shall be deemed Items for pull out test item description shall co^,
in do -
on Excavation, filling. and turfing for retaining structures (included in to be materials other shall be deemed to state the location of
=. =
Z Class A Earthworks). than topsoil. natural include all necessary the item if the work is
^ ^0,
N hard material, rock, equipment. and more than 6 in above I. , 0 o0
Reinforced concrete foundation for retaining structures (included in artificial hard material submission of test or below the road level.
^--
Class A Earthworks, Class I. ' Concrete work, Class H: Piffng work). Natural hard material co
do
shall be materials ,
o
other than rock and a
a
artificial hard material,
and requires other 81
^
specialised equipment. o
=
03
Rock and artificial
hard material shall be
materials that require
the use of either
hydraulic rock breaker
or pneumatic tools or
explosives.
CS Gi
in
items for moving o
and hand"rig shall be ^
in
deemed to include the C,
=C
moving and handling of Z
all necessary plant and
C>
equipment within the >
site and from location F
ADDITIONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES DESCRIPTION RULES
HIRD DIVISION
04 A2
, Rock-filled gabion Item description for
Gabions filled with
2 Rockfilled gabion
mattress rocks exceeding 300 gabion shall state the
3 Filter layer mm high shall be type and size of filling,
classed as rock-filled and the type, gauge. and
separator
gabion. and those not protective coatings of
exceeding 300 mm the wire mesh. If laying
high as rock"filled underwater is required. it
gabion mattress. Filling shall be so stated.
shall be deemed to
be imported, unless As
otherwise stated. Item description for rock-
f"led gabion mattress
shall state the thickness.
C4 A4
2 Cribwall I Single cell in' ",
2 Double cell in' The area of single ce" terns for cribwall shall Item description for
ing cribwa/I shall be the be deemed to Include cribwall shall state the
3 Triple cell
4 Quadruple cell in' sloping area from the precast reinforced concrete grade, length
5 Filter layed' in' commencing surface concrete components of precast concrete
and granular in fill header, combination
separator
M2 materials. and type of granular
The area of inulttole In fill.
cells cribwall shall be
the sloping area of the
highest cells from the
commencing surface
Ms 05 A5
3 Reinforced soil I Reinforced earth
Reinforced earth fff"rig Reinforced earth item description for
slope filling
and reinforced ginnular filling and reinforced reinforced soil slope
2 Reinforced granular
shall state the location,
filling f""^g shall be measured granular fMing 15
3 Erosion protection nett volume within defined as fi I'rig within type and strength of
the reinforced zone the reinforced zone material used.
mats
M4 06
C,
The area of erosion Reinforced earth A6
Item description for ;;:
protection mat shall be fill^^g and reinforced co
the nett area to the granular filling shall be erosion protect, bn mats co
07 CS A7 ^
in' Ms
4 Reinforced soil wall I Wall facing Precast concrete panel
in
2 Reinforced earth ms The area of re, nforced Items for we" focing shall Item description a
shall be classed as be deemed to include for wall facing shall ^
soil wall Is measured
= filling Z
^ ing from the commencing wall facing in retainlng soil reinforcement and state the type. size,
3 Reinforced granular stucture. C>
in
surface galvanising where and shape, where >
un filling
^ 4 Pull out test nr applicable connections applicable, and the I~
Z and/orjointing, 900teXtile concrete grade type of
N
M6 ^:
Sub-soil drainage shall be and accessories for wall soil reinforcement and o
wall height ,.
measured under Class a. joints ><
^.
\O
V, ~co<
ADDITIONAL
Q
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES EFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
C6 A8 CD 9: ::!.
= 3 Slope stabilisation I Soil nailing I Stated length ^ a ^'
2 Pull out test Items for soil nailing Item description co^n
^
in shall be deemed to for soil nat7ing shall ^-< ^.
co
include drilling of state the diameter ^Qin
=
=r borehole. corrugated of the borehole and reoco
^--
,.,
HDPE pipe if reinforcement bar, ^ 40
applicable, sleeve concrete grade and the "-
co=
grouting. sealant size of concrete pad. Cto
^
10
compound, galvanised B
steel bearing plate and to
=
all associated works
co
to
c,
Q
2 Rock bolt I Stated length C7 A9 a
a
2 Pull out test Items for rock bolt shall item description
be deemed to include for rock bolt shall 81
^
Ci
4 Concrete buttress C9 An
Items for concrete Item description for ;;:
co
butt, ess shall be concrete buttress shall co
deemed to include state the grade and C>
steel wire mesh. PVC average thickness of
the concrete.
61
drain pipe. dowel bars. in
filter materials and all o
^
associated works. in
Ci
=
5 Horizontal drain I Earth in M7 CIO A12
Z
2 Natural hard in Concrete channel for Items for horizontal Item description for a
material horizontal drain shall drain shall be deemed horizontal drain shall >
F
3 Rock in be measured under to include drilling. state the type and
4 Artificial hard in Class R740. perforated pipe and all diameter. ^.
associated works. o
material =.
5 Unsuitable materials in 7<
ADDITIONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
FIRST DIVISION SECOND DIVISION THIRD DIVISION DESCRIPTION RULES
c, I A13
in2 MB
4 Surface protection I Guniting items for guniting shall Item description for
2 Articulating slab in2 The area of guniting
in a and articulating slab be deemed to include guniting shall state the
3 Rock netting
in' shall be their nett area steel wire mesh, PVC average thickness of
4 Stone pitching
5 Stone revetment in2 to the slope. drain pipe, dowel bar, the concrete and the
filter materials, and all concrete grade
M9 necessary formwork.
The area of rock A14
netting shall be C, 2 Item description for
measured nett with no Items for articulating articulat, hg slab shall
allowance made for slab shall be deemed state the thickness,
laps. to include preparation type and jointing of the
of surface, blinding, slab.
aggregate, geotextile
and all necessary A's
concrete and item description for
formwork. rock netting shall state
the type and gauge
CIS of chain mesh and
items for rock netting anchoring system.
shall be deemed to
include all necessary A16
accessories. Item description for
stone pitching and
stone revetment shall
state the stone size
and thickness.
A17
I Prefabricated in HID
5 Ground treatment
Any fil"rig required Item description for
vertical drains
nr under this class to prefabricated vertical
2 Dynamic
be used as a working drains shall state type
compaction and cross-section al
3 Vinro compaction nr platform shall be
in measured under Class dimensions of drainage
4 Sand column
in F3" tube, wrapping
5 Stone/Aggregate material and vacuum C)
column
6 Soil-cement column in M, , consolidation where ^:
co
Surcharge material required. Type of soil co
shall be stated.
(for pre-loading) used 61
with pre, abricated
Ale C,
vertical drains shall be in
measured under Class Item description for o
dynamic compaction ^
F3 ". in
shall state the weight C>
of the drop hammer, Z
= Z
< number of drops and
a Ci
in
co
height of drop. >
^ F
=
re ^:
o
^
7<
Ul
N
FIRST DIVISION SECOND DIVISION ADDITIONAL ~co^
THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES ^""
< a<
=
5 Ground treatment O 9; g!
A19
^ in a^
In
item description for coI^o
CD vib, o compaction shall
^ 7=
A2, o
=
item description for
soil. cement column
shall state the grout mix
design.
7 Geotextile M, 2 A22
8 Geogrid The area of geogrid Item description for
and geotextile shall be geotexti/e and geog, id
measured nett with no shall state the type.
allowance for laps. grade and the technical
specification of the
materials or reference
number of the product.
6 Grouting work I Drilling for grout I Earth in MIS C14 A23
holes 2 Natural hard in Drilling through Items for sleeve pipe item description for
material previously grouted shall be deemed to drilling for grout holes
3 Rock in holes in the course of include grouting of shall state the method,
4 Artificial hard in stage grouting shall annulus space between diameter and maximum
material not be measured. the sleeve pipe and the depth Ci
5 Unsuitable material in Where grout holes are drilled holes ;;:
expressly required to co
co
2 Sleeve pipes in be extended, drilling A24
C)
through previously item description for
grouted holes shall be sleeve p^, e shall state C>
in
measured as drilling the diameter and type o
through rock. of material
in
3 Injection I Cement M14 C,
2 Sand ^
The mass of grout Z
3 Bentonite inI'ection measured
o
4 Aluminium powder kg shall not include the >
5 Chemical t mass of mixing water. F
C15 A25
6 Grouting work 4 Connection for
grouting
Connection for item description
grout, hg shall be for connection for
5 Water pressure test
deemed to include grouting shall identify
provision of packer as those which are in
expressly required. stages, distinguishing
between those which
are in ascending and
descending stages.
I Earth MIS 08 C, 6 A26
7 Diaphragm walls I Excavation
2 Natural hard in The depths of concrete Diaphragm walls are Items for excavation item description for
material in diaphragm walls walls constructed with for diaphragm walls excavation shall state
3 Rock in' shall be measured from the use of bentonite shall be deemed to the maximum depth
4 Artificial hard ms the cut. off level to the slurry or other include preparation and thickness of wall.
material toe level. temporary support and up holding sides of
5 Unsuitable in3 fluids. excavation.
materials MIG
The mass of steel C, 7
reinforcement shall 09 Items for A27
2 Concrete
be taken as 0,785 The nominal diameter reinforcement shall The mix specification
kg/in per 100 mm' of stated in the item be deemed to include or strengths shall
cross-section (7.85 t/ description for bar labour for cutting, be stated in item
3 Reinforcement I Mild steel bar t in'). The mass of other reinforcement shall bending and placing. description for concrete
2 High tensile steel t reinforcing materials be the cross-section al in diaphragm walls.
bar shall be taken as stated diameter defined in
in2 in the contract. Ms 146. A28
3 High tensile steel
fabric Item description for
4 Fabric of other in a steel bars shall state the
stated material size of the bars
^ 2 inclinometer nr in a^
in
co 3 Surface marker nr
Items for piezometer Item description co^o
Z and inclinometer for piezometer and
4 Settlement plate nr <-,
7=
Z
5 Displacement shall be deemed to mennometer shall state
re nr ^Qin
marker include pre-boring and the type. depth and reoto
^--
installation. material used.
6 Magnetic nr ^"
40 to
extensometer
A30 in.
7 Deep levelling nr cco
datum Item description for co
^
settlement plate shall to
.
state the dimensions
of plate, depth and to
material used. to
a
o
=
a
I^!
^
^.
o
=
Ci
;;
co
co
C>
Gi
in
o
in
Ci
Z
Z
o
>
F
^
o
=a
PC
.
* "
,
,
.
,
.
mm. ,*. ...
^.= ^
I, ,,,,, ,
-..
~ ~.
-,^'
-r.
I'"'
C LAS S H
PILING WORK
MyCESMM2 I
un
a - !e ^
CLASS H: PILING WORK ADDITIONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
< 9. <
a: Measurement covered under other classes: in C, A1 C, 9! !!!
<
Bored and driven rig. ^
a Items for piling work item description for co to-
Z cj
in
co depths shall be shall be deemed to piles shall identify
Z Boring for site investigation work (included in Class D. ' 511e invest1:7ation work).
=
measured along the include disposal of preliminary piles. ^^^
^8. g^
co Setting out of piles and as-built drawings (included in Class A: General items). axes of piles from the excavated and surplus item description shall N oco
^^
commencing surface: materials. identify raked PMes and
Ground anchor and stone column (included in Class G: Geotechnica/ work) Z CD
their inclination stated. AD -
Walling and tie rod (included in Class L. ' Metalwork). a) to the toe levels of C2 on.
=on
^
Diaphragm wall (included in Class G .. Geotechnica/ work) bored piles; and Items for piling work A2 in
a
shall be deemed to Item description for to
=
b) to the bottom of include piling records PMes shall state the
casing of driven and number stated. materials composition 01
cast in situ piles to
r,
Q
CS A3 .
a
M2 Items for pre-boring Items description
The commencing shall be deemed to for piles shall state I^I
^.
^
A9
Item description for
10^^rimgs shall state
type, method and
detail of jointing
required.
FIRST DIVISION SECOND DIVISION THIRD DIVISION
C8
Items for moving C)
and handling shall be
deemed to include ^:
co
moving and handling co
all piling plant and Z
Z equipment within the
< ^
a site. and from location
in r-
", to location as often
= Z
= as is. and whenever 61
"
necessary for the
execution of the whole ^
o
piling operation. ^
7<
L, I
Co ADDITIONAL -, co ^
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
< 9. <
2 Piles I Bored piles , Depth bored or in M6 or C9 A10
== ^a^'
2 Driven cast in situ driven
^ Each group of items for Piles consisting of Items for bored PMes Item description for co^,
in
co
concrete piles 2 Boring through in
bored piles, bar, ette driven permanent steel and bar, ette p"es shall bored, cast in place, "-
a' =
^ 3 Barrette piles rock pile, driven cast in casing. which is filled be deemed to include barrette piles and ^'in
Z
re 3 Permanent casings in situ concrete piles, with concrete, shall be temporary casings, car^son piles shall state I'D 0 o0
^ ^ -.
4 Reinforcement t and caisson piles shall classified as driven cast stabilising agent, and the diameter 1< to
straight bars comprise: in situ piles where the enlarged bases.
co=
5 Reinforcement piles are designed for An cco
-,
helical bars a) An item for the total the load to be carried CIO Item description for CD
B
6 Concreted length in depth bored or total on the concrete. Items for boring and bored piles shall state co
.
7 Cut-off pales nr depth driven or excavation through contiguous bored piles ^
b) An item for the total sectional diameter materials shall state materials, o
a
concreted length of defined in BS 4449 or thickness, and details
piles Ms 146. C, I of treatments and
Items for permanent coating.
M7 casing shall be
The lengths of deemed to include the A13
permanent casings for supply and jointing of Item description for
bored piles shall be casings. driving heads, concreted length shall
measured from the cut. and shoes. where state when required
off level to the bottom applicable. particular method of
of the casings. The concrete placement.
length of permanent C, 2 concrete grade,
casing for driven cast items for poured at a stated
in situ concrete piles reinforcement speed. temperature.
shall be measured from shall be deemed to compacted or cured in
the cut-off levels to the include supporting a particular method.
toe levels. reinforcement.
C, 3
Items for driven castin
situ concrete piles shall
be deemed to Include
pre-boring. where
applicable. C)
S;:
co
co
^
b
r
Z
CT
^:
o
=o
7<
ADDITIONAL
THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
FIRST 01VISIO SECOND DIVISION DESCRIPTION RULES
I Depth excavated Me 03
4 Caisson piles
2 Excavation through The length of permanent Piles comprising
rock casings for caisson piles placement of
3 Permanent casings shall be measured from permanent concrete
4 Reinforcement bars the top of casing to the or steel casing. where
5 Concreted length bottom of the casings. the material within the
casing 15 excavated and
M9 filled with concrete
The mass of steel shall be classified as
reinforcement shall be car^son PMes when the
taken as 0 785 kg/in piles are designed for
per 100 min' of cross the load to be carried
section <785 t/in') on the concrete
The mass of other
reinforcing materials
shall be taken as stated
in the contract
concrete piles 2 Depth driven in Each group of items for The supply lengths of items for filling hollow Item description for
7 Precast prestressed 3 Pre-boring in precast reinforced and precast reinforced piles with concrete filling hollow piles
precast prestressed concrete piles and shall be deemed to with concrete shall
concrete piles 4 Jointing in
5 Filling hollow piles in concrete piles shall precast prestressed include removal of state the specification
with concrete comprise concrete PMes shall be materials from within of the concrete and
the total number of the piles before reinforcement
6 Cut. off piles nr
^ 4 Filling hollow piles in steel pipe piles shall and steelp!!, e piles .
with concrete be the tore number of shall state the mass per
^ F
in
on 5 Cut-off piles nr piles of stated lengths meter, cross-section al Z
^ 6 Jointing nr expressly required to dimensions and grade Gi
^ 3 Piles I Steel pipe piles
7 Preparing head nr be supplied of steel, length and
re
concrete In fill, where
^:
o
applicable .g
7<
a
Q ADDITIONAL ~coZ
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< a<
3 Piles Ale a, -
= ing^
^ Item description for co^o
in
in steelH. piles and steel ==
= piae piles shall state ^Qin
a= details of treatments, I^ 0 09
re .., - -
coatings and cathodic ^to
protection where
un=
required. con
^
to
B
A19 to
=
item description for .
MIG A25
The lengths measured Item description for
for cutting of surplus ground anchorages
lengths of interlocking shall state the
steel sheet piles composition and
shall be the mean working load.
undeveloped horizontal
lengths to be cut
<1ncluding lengths
occupied by special
piles)
7 Bi-directional nr A28
static load Item description for
a Global strain nr ^Ie test shall identify
extensometers those which are for
static load preliminary plies.
Ci
62 I MyCESMM2
o
S^
1100 5'5
CLASS I
CONCRErE WORK
MyCESMM2
I^ ADDITIONAL ^co^
CLASS I' CONCRETE WORK MEASUREMENT RULES EFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
^^
Measurement covered under other classes: M, Cl A1
Z rig^
^ The volume of Items for in situ Item description for co ^ ci
in
In situ concrete for: concrete measured concrete shall concrete shall state ^-<
co = -.
^ shall include that be deemed to mass, reinforced ^Qin
^ Concrete diaphragm walls (included in Class G. . Geotechnica/ work) occupied by: include placing prestressed concrete N o00
N ^--
Piling work <1ncluded in Class H. Pi/^^g work) and compaction of and maximum size of ^co
a) reinforcement and concrete. aggregate.
Manholes for sewerage pipework (included in Class O: PIj, ework). co=
other metal sections; cco
-
Formwork and reinforcement for fences and gates foundation (included in d) rebates, grooves.
^.
o
=
Class V^ Miscellaneous work) throats, fillets, a) the principal
Formwork and reinforcement in manholes for sewerage pipework (included i chainfers or internal dimensions of the
Class O: Pfy, ework). splays each not concrete component;
exceeding 0.01 in2
Precast concrete piling work Oncluded in Class H. . Piling work). cross-section al area b) a type or mark
number of a concrete
Precast concrete manholes for sewerage pipework (included in
e) voids not exceeding component for which
Class O: Pfy>ework)
0.05 in'; principal dimensions
Precast concrete pipeworks (included in Class O: Pi^>ework) are given on the
Precast concrete paving. kerbs. and traffic sign supports Oncluded in f) joints or joint drawings; or
Class R. ' Roads and pavings). components
between adjacent c) a statement locating a
Precast concrete fencing (included in Class V Miscellaneous work). volume of in situ concrete component
Precast Concrete drain and sumps (included in Class Q: Oral'nage work). concrete. and nibs for which principal
or external splays dimensions are given
Precast concrete panel for reinforced soil wall (included in Class G:
on the drawings
Geotechni'cal work).
g) not exceeding
0.01 in2 cross- A3
sectional area. Item description for
cement component
other than ordinary C,
portland cement shall S;:
be so described. co
co
A4
Item description for Ci
o
concrete required Z
to be placed by a Ci
particular method, ^
poured at a stated !q
in
speed, temperature,
and compacted or ^:
o
cured in a particular =O
way shall be described. 7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
3 In situ concrete 04
61
o
Z Z
';^ o
in ^
Un
Z 1.1
^ in
co
^:
o
,o
>^
at
a
FIRST DIVISION SECOND DIVISION THIRD DIVISION ADDITIONAL -co^
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES ^^;^
*< o. <
= 4 Precast concrete I Columns nr M4 05 C3 A9 ^ ^.
<
2 Beams ^ a ^;'
a
in
nr Parapet shall be Concrete components Items for precast Item description for
co 3 Prestressed beams nr measured as wall which are cast other
co Z c,
concrete shall be each type of precast CD -
Z 4 Walls nr ==
= than in their final deemed to include concrete unit shall state
N
5 Slabs nr Ms ^Qin
position shall generally reinforcement, the position of the work re oco
6 Segmentsl units nr Plank shall be ^--
be classed as precast formwork joint and and specification of the Zo
7 Units for subways. nr measured as slab concrete units. finishes concrete to be used
vehicular or "-
un=
=co
pedestrian culverts 06 C4
^
A10 to
and viaducts ^
Where site precasting Items for prestressed Item description for to
8 Other concrete =
of units is adopted precast units shall be each precast concrete
forms
(excluding those deemed to Include unit shall state the co
with multiple use of prestressing concrete mix type or to
r,
formwork), and the mark number Units with
o
=
a
nature of the work Is different dimensions shall in
the characteristic of be given defferent types a
A12
Item description for
columns, beams,
segmentsl units, units for
subways, and vehicular
or pedestrian culverts
and ducts, copings,
viaducts and other
concrete forms, shall
state the cross-section,
type and total length Ci
A's
^;:
co
Item description for co
walls and slabs shall
state the type. area and o
o
average thickness Z
C>
A14 =o
item description for units PI
in
for subways, vehicular
or pedestrian culverts ^:
and VBducts shall state o
.:u
the mass per metre 2<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
M8 A19
Formwork to upper Item description for
surfaces of concrete formwork to curved
shall be measured to concrete components of
surfaces inclined at constant cross-sections C)
angle exceeding 15' shall state the radii.
from the horizontal.
^:
co
and to other upper A20 co
sofaces for which item description for
formwork is expressly formwork to concrete C>
o
^ required. constant cross
Z
^
CD section shall state the C)
in
co M9 principal cross-section =.
Z The area of formwork dimensions of the !^
= in
re measured shall include components. location
the area of formwork or other unique ^:
o
obscured by voids and identifying feature ^
inserts. 7<
O.
00 ADDITIONAL -co^
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
< o. <
5 Formwork 8 For voids , Depth not NIO 09 A2, ^-
= in '- S;
<
a exceeding I in Formwork for the The size of voids for Item description co Z c,
in Co-
an 2 Depth exceeding surfaces of voids larger 158' shall be as follows: for vords shall state
==
= tm than the upper bound the cross-section or
= Class Cross ^O,
values as defined diameter and the Noco
N
section - --
in rule 09 shall be depth of voids. Zto
measured as set out in Circular 0.35 in -
un.
this class.
(diameter) 0.7 in cco
^
CD
^
Ml, to
perpendicularly to the ^.
o
=
adjacent surface of
concrete
D, ,
The maximum
diameter or cross-
section shall be taken
when the voids have
two unequal diameters
or cross-sections
6 Reinforcement I Mild steel bars I Nominal diameter: M, 2 0,2 C7 A22
2 High tensile bars 6 mm The mass of steel The nominal diameter items for Item description for
3 Reinforcing bars of 2 Nominal diameter: reinforcement shall stated in item reinforcement shall specialIbint shall state
other stated 8 mm be taken as 0785 description for bar be deemed to include the type of joint and
materials 3 Nominal diameter: kg/in per 100 mm' of reinforcement shall labour for cutting, size of reinforcing bars.
4 Stainless steel bars 10 mm cross. section <785 t/ be the cross-sectional bending. and placing.
of stated quality 4 Nominal diameter: in'). The mass of other diameter defined in Ms A23
12 mm reinforcing materials 146. C8 Item description
5 Nominal diameter: shall be taken as stated items for for steel fob, IC
16 mm in the contract. 0,3 reinforcement reinforcement to Ms
6 Nominal diameter: Sleeve joints. steel shall be deemed to 745 shall state the type, C}
20 mm MIS welded, swaged or include supporting fabric ref number or
7 Nominal diameter: The area of additional screwed and the like in reinforcement other letter in accordance
511
co
25 mm fabric in laps shall not reinforcing bars shall than steel supports to with Ms 145. co
8 Nominal diameter: be measured be classed as special top reinforcement.
stated exceeding joints. C,
32 mm o
Z
61
^
!^
in
^
o
^
^
FIRST DIVISION SECOND DIVISION THIRD DIVISION ADDITIONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
6 Reinforcement 5 Special joints M, 4 A24
The mass measured Item description
6 Steel fabric I Nominal mass: for steel support to for other fobric
7 Fabric of other not exceeding top reinforcement reinforcement shall
stated material 2 kg/in2 shall include the mass state the materials,
2 Nominal mass in' of reinforcement fabric reference sizes
2 - 3 kg/in a expressly required in and nominal mass per
3 Nominal mass in a laps and special chairs. square meter.
3 - 4 kg/in a
4 Nominal mass inz M, 5
^:
o
^
^
^
o
FIRST DIVISION SECOND DIVISION THIRD DIVISION ADDITIONAL ~co^
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES ^21~
< 9. <
= 7 Concrete ancillaries 3 Finishing of I Class Ul finish in2 Mig DIG C, 2 A28 ^-
^:
co
by those which project co
from two surfaces of
the concrete; and o
o
co those which are Z
C>
totally within the =.
concrete volume
:q
in
^:
o
=a
7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
CIS
items for sternising and
flushing of tanks shall
be deemed to include
provision of potable
C,
water and chemicals as
expressly required ^;:
co
co
in2 C,
4 Linings and I High alumi M24 C, 6
o
^ coatings cement Area of PVC and Items for I'mings and Z
<
c, 2 PVC in' HOPE I'mings shall be coatings shall be C>
in =.
co 3 HDPE in2 measured nett not deemed to include
^ 4 Sodium silicate in? inclusive of laps supply and installation/ !^
Z in
re 5 Epoxy coatings in2 application.
^:
o
,g
7<
This page is deliberately left blank.
72 I My CESMM a
o
SL
go 1140 "s
C LAS S J
BRICKWORK,
BLOCKWORK
AND MASONRY
MyCESMM2 I
^ ~coZ
ADDITIONAL
^.
CLASS J: BRICKWORK, BLOCKWORK AND MASONRY MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^ 61 ^.
< o. <
M, A1 091!e
^ Measurement covered under other classes in a,
<
c, Each skin of brickwork, Item description for co^o
in brickwork, blockwork,
on Prefabricated panels (included in Class M: Building work). block, vork, or masonry, ^.
sills. No deduction o
=
from. or addition to.
areas measured shall
be made for Intruding
or projecting surface
features. No deduction
from the areas
measured shall be made
for holes and openings C>
in walls where surface of I^:
the hole/opening each co
co
not exceeding 0.25 in a
<-
in cross-section al area
co
FIRST DIVISION SECOND DIVISION THIRD DIVISION a.
Ci
I Brickwork I Vertical straight in2 M3 01 C, A2 7<
2 Blockwork walls Mean dimensions shall In determining the Items for brickworkItem description ^
3 Masonry 2 Vertical curved in2 be used to calculate thickness of walls, and blockwork walls for walls, focing to o
^
walls the areas of wa14 facing, and casing, the shall be deemed concrete, casing to X
3 Battered straight in2 facing to concrete, presence of surface to include joint metal sections, and
co
walls and casing to metal features shall be reinforcement. columns and piers
4 Battered curved in2 sections and the ignored. movement joints, fixing shall either state the o
o
walls heights of columns and ties. bonds to existing materials, nominal 7<
5 Vertical facing to in2 P, ers. 02 work, and fixing dimensions and ^
concrete Walls or facing clamps types of brick, block o
in2 battered on one or =o
6 Battered facing to and stone or give X
concrete both sides shall be C2 equivalent references
>
7 Casing to metal in2 classed as battered items for masonry shall to the applicable Ms Z
sections walls or battered be deemed to include or BS. o
8 Column and piers in3 lacing, fair facing finish. ^
>
03 co
o
The thickness of
Z
battered walls shall be ^
their mean thickness. <
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES EFINITION RULES ADDITIONAL
COVERAGE RULES
DESCRIPTION RULES
I Brickwork 04 A3
2 Blockwork
Isolated walls having item description for
3 Masonry a length on plan not masonry walls, focing
exceeding four times to concrete, casing to
their thickness shall be metal sections, and
classed as piers. columns and piers shall
state the surface finish.
A4
Item description
for walls, focing to
concrete, casing
to metal sections,
columns and piers
shall state the bonding
pattern. type of mortar,
type of jointing and
pointing.
A5
item description
for walls, foci"g to
concrete, casing
to metal sections,
and columns and Ci
piers, either in cavity S;:
or composite wall co
co
construction. shall be
so stated. C_
Z thickness laps of damp proof deemed to include and infills shall state
Z
^ a. in
I. , 3 Built-in pipes and nr course and joint their supply, unless the materials and N o oa
^ --
ducts reinforcement shall not otherwise stated. dimensions. ^to
4 Bonds to existing in2 be measured
co,
works C4 A9 c o0
^
5 Movement joints in items for bonds to item description for to
6 Joint ^
in existing works shall built-in pipes and to
=
reinforcements be deemed to Include ducts shall stated the ^
Ci
^:
co
co
C-
co
,g
o
==
^:
o
.o
7<
co
r
o
Ci
^
^:
o
=.
7<
>
Z
a
^
>
co
o
Z
^
<
.
.
q
\,,..*,,.,
Q
. ,
**
.^ .
.
.
.
,
^.. ..
.
,~~~.~~
^^
..~.~. "~
C LAS S K
TIMBER WORK
MyCESMM2 I
^
co ADDITIONAL -coZ
CLASS K TIMBER WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
Measurement covered under other classes. D, C, A1 O^^
= in=
';^ Grades A, B, C, and D items for timber shall Item description for co^o
in
co Formwork to concrete Oncluded in Class I' Concrete work) shall be in accordance be deemed to include timber shall state the <-^ ^.
Timber roof structure, doors, windows and skirting Cineluded in Class M. Buffdfrig work) governing authorities. to
3
co
Finishes (included in Class N. Paintihg work) =
2 Decking I Floors M2 03 C2 A3
3 Boarding 2 Walls No deduction from the Surfaces of columns items for wa"s and
Item description for
3 Soffits areas measured for shall be classed as so, fits shall include
decking and boarding
timber decking shall walls. Surfaces of any temporary staging shall state the use and
be made for openings beams and ceiling sha required. thickness of timber.
and holes each not be classed as soffits
exceeding 0.50 in2. C3 A4
04 Decking and boarding Item description for
M3 The thickness stated shall be deemed to decking and boarding
Structural load bearing shall be the nominal include framework shall state the size
timber forming part of thickness. where expressly and spacing of the
the framework shall be required. members in framework
measured under timber where expressly
components. required.
Ci
511
co
4 Miscellaneous work I Handrails A5 co
2 Cornice Item description for 7<
3 Dado handrails, cornice and H
dado shall state the
^
location and size co
in
=O
^:
o
^
7<
,
,..
"
,.~
~.~..
.
.
,..........
I^ ^^ .~~.-.....
,
, 1.11 ,
...,. I
\ ,.
.,,-,,-.
*~**~-" ' '
~.*~ .
.-
I, , ",
,
.\ o
,,
CLASS L
M ErALWO R K
MyCESMM2
Co ~co^
o ADDITIONAL
CLASS L. METALWORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< a<
Measurement covered under other classes: in A1 O e: 12
= in a ^;
No allowance shall Item description shall
^
in
coZ,
CD -
be made in the state the surface
co Traffic signs (included in Class C. 77affic management and control and 3=
a= Class R. ' Roads and pav, hgs) measurement for treatment and painting ^ 8. in
^
to rolling margins and carried out prior to I\, o co
Metalwork in piling work (included in Class H: Piling work). other permissible delivery of components
^^-
^to
Metal formwork in concrete (included in F. Earthworks and deviations. The mass to site where required.
co=
Class I. ' Concrete work) of welds, fillets, bolts. con
-,
co
Gantries (included in Class R: Roads and pav, hgs) CD
M2 e,
o
Permanent and temporary rail tracks and accessories (included in No deduction shall be =
a
Class T Rail track). made for the mass of
metal removed to form 81
Metalwork in fences (included in Class V. Miscellaneous work). ^
M3
The mass of members,
other than plates shall
be calculated from
overall lengths of the
members with no
deductions for splay
cut or initred ends.
M4
The mass of member
measured shall be that
of rolled or extruded
sections, built up and
fabricated sections.
bracings, external
diaphragms. shear
connectors, stiffeners.
Ci
cleats. packs, splice
plates, and other ;;:
co
fittings. co
F
>
r
^:
o
=O
^
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I Vertical members Ms or Cl A2
I Supply and erection I Hot rolled section
of structural 2 Cold rolled section and columns The mass of steel to Frames shall include Items for supply and Item description for
members 3 Built-up box or 2 Horizontal BS 4449 or Ms146 plane frames, trusses, erection of structural supply and erection
fabricated sections members shall be taken for space frames. lattice members shall be of structural members
4 Extruded sections and beams measurement as 785 frames and tower deemed to include shall state the
3 Portal frames kg/in' per 100 mm structures delivery, protective materials, grades, and
4 Frames thickness <7.85 t/in'), and decorative surface their use
5 Decking panel unless otherwise stated 02 treatment, jointing
6 Ancillaries in the specification Decking shall include type, fabrication. and As
7 Grillages or in the supplier's plates and deck panels. handling and hoisting. Item description for
8 Overhead crane catalogue. The masses supply and erect, bn
of other metals shall 03 C2 of structural members
be taken as stated in Anciliaries shall include items for supply and shall state the
the specification or bracings. purlins. erection of structural alignment on plan. and
supplier's catalogue. cladding rails. and members shall be camber requirements
struts. deemed to include
non. destructive testing A4
04 as expressly required. item description for
Overhead crane shall supply and erection
be permenant structure CS of structural members
with platform, crane items for supply and shall state separately
runways. bridge crane, erection of structural and locate separate
hoist. frame. motor. members shall be structural frames and.
track as expressly deemed to include where appropriate the
stated. bolted connections parts of the frames.
using bolts of nominal
diameter less than 16 A5
mm. together with Item description for
gusset and end plates. supply and erection
of structural members
C4 shall state tapered or
Items for supply and castellated members.
erection of structural
members shall be A6
deemed to include Item description for
welded connections supply and erect, bn
Welded connections of structural members
shall be deemed to other than for portal
include gusset and end frames shall state
plates. cranked members.
C,
A7 S;:
co
item description co
for overhead crane r:
^
< shall state the crane
CD ^
In capacity tonnage, type,
co
= materials and principal !:I
>
= dimensions. F
Iq,
^:
o
=o
^
co
N
ADDITIONAL
^co^
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES <0"
DESCRIPTION RULES < a<
= I Supply and erection C5 A8 a e: !!!
of structural ing^
^ Items for overhead item description for co^o
in
co
members crane shall be deemed overhead crane shall ^^ ^ = -.
^ to include runways. state where fixing
Z
^Qin
I'D bridge. motor. track. clips and resilient pads N 0 00
-, - -
fabrication, installation, are used to secure ^ to
in to
foundation work. overhead crane rails.
un.
and protective and c00
^
decorative surface do
a
treatment. to
.
5 Black bolts I Nominal diameter: nr C6 A9
6 High strength 16 mm - 20 mm items for black bolts Items description for 0'1
to
friction grip bolts 2 Nominal diameter: nr and high-strength high-strength frict, bn a
o
=
20 mm - 24 mm friction grip bolts shall grip bolts shall state a
3 Nominal diameter: nr be deemed to include the grade and load I^!
24 mm - 30 mm nuts. washers. gusset limits ^
^.
Q
4 Nominal diameter: nr and end plates. and =
30 mm - 36 mm other accessories.
5 Nominal diameter: nr
36 mm - 42 mm
6 Nominal diameter: nr
42 mm - 48 mm
7 Nominal diameter: nr
48 mm - 56 mm
8 Stated nominal nr
diameter exceeding
56 mm
drilling or cutting of
o
other work. ,a
7<
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES ADDITIONAL
DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
2 Miscellaneous 6 Decking I Plate flooring in a MB C8 A's
metalwork 2 Open grid flooring in a No deductions from Items for ladders and item description
3 Welded mesh inz the area measured parapets shall be for miscellaneous
paneling for miscellaneous deemed to include the metalwork assemblies
4 Trench covers in2 metalwork shall be full assemblies items shall state the
5 Ducts covers in2 made for openings for handrails shall be specification and
and holes each not deemed to include thickness of metal
exceeding 0.50 inz. balustrade. surface treatments and
principal dimensions
7 Cladding M9 C9
8 Walings The lengths of ladders Items for decking shall A14
shall be measured be deemed to Include Item description for
along the lengths supporting metalwork, ladders shall state
of stringers. The unless otherwise Include safety oops,
lengths of handrails expressly stated rest platforms or
and parapets shall be returned stringers
measured along their
top members
2 Tie rod
84 I MyCESMM2
C LASS M
BUILDING WORK
MyCESMM2 I
Co
a ~coZ
CLASS M. BUILDING WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
ADDITIONAL
DESCRIPTION RULES
^""
.< o. <
^ Measurement covered under other classes' o--
< in o. ^;
r,
in
co <6
un Concrete roof structure <1ncluded in Class I Concrete work) ^.
Z
= Pipework and septic tank Oncluded in Class U Mechanical and electrical work). ^C,
N I^, o co
^^-
roofing system and components to roofing system and include connecting state the member I
and components be designed by the components to be plates. bolts and nuts, nominal size. grade to
to
to be designed contractor shall be designed by the and other fastening of materials. and c,
o
a
by the contractor the plan area of roof contractor system structural locations a
3 Metal of stated structures for roof structures
81
roof structure C2 not designed by the
^.
^
o
member sizes Metal roof structure contractor a
3 Mitred vertical in
angles. fillets, built"up
edges, overlaps and
angles
laying to cambers or
4 Ridge and hip in
falls including frame.
capping
5 Vertical angle in
6 Saddles nr
7 Glass tiles nr
I
monomer rubber
co
3 PVC to
e,
4 Polypropylene o
=
a
5 Polyethylene
6 Polyurethane 151
^
7 Proprietary system o
=
Q
ceilings shall be deemed .
to include associated
primary support or
hanger systems
C, 7
Items for ceiling
finishes shall be
deemed to Include
sloping ceiling.
8 Floor and wall I Wall partitions I Solid in2 MB CT8 A22
system 2 Full board in2 The length measured Items for wallpa, titions Item description for
3 Half board with in2 for wall partitions shall shall be deemed to wall partitions shall
fixed glass exclude the length of include fixing. supply of state the materials,
4 Cubicle sets nr voids which extend to fixing components. and finishes and finished
the full height of the drilling or cutting of thickness.
partition. associated work.
A23
C19 item description for
items for wallpa, tit^^ns cubicle sets shall state
shall be deemed to the overall dimensions.
C>
include forming holes.
cutting and making ^:
co
good for services. co
2 Raised access floor 0,3 ^
Item for Far^ed access
co
floor refers to a false C
floor raised from the F
ground to serve as a
an accessible floor Z
system for the laying of C>
flooring services such ^:
as power lines and o
^
cables.
><
r
,^
.
.
. +
.~,
.
.
.
\ *..,,.
.
..> . .
11, ~ J. ~.~ .
-.. .
. .
mm~... ....
^.. ^.
.......~....
^ .
,
.
,
^.,.. b :,-.."~'
.,.,_*,*.
^, . *
C LAS S N
PAINTING WORK
MyCESMM2
LO ~co^
N ADDITIONAL
CLASS N: PAINTING WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^
o
=
2 Alkyd gloss paint metal sections and members: Isolated groups of Concrete formed using Items for painting of Item description for
3 Emulsion paint pipework exceeding sun^ces of different Class F1 formwork shall metal shall be deemed isolated groups of
or acrylic paint 2 Timber 300 mm girth shape or dimensions be classed as rough to include painting the surfoces shall identify
4 Cement paint 3 Smooth surfaces 2 Surfaces of shall be measured as surf^ces and concrete surfaces of connecting the work to be painted
5 Epoxy or members: not separate items. formed using Classes plates, brackets, rivets. and its location.
polyurethane paint exceeding F2 and F3 shall be bolts, nuts and similar
6 Bituminous or coal 300 mm girth M3 classed as smooth projections.
tar paint 3 Isolated groups In calculating the surfaces.
7 Chlorinated rubber of surfaces painted area of C4
61
paint metal. the presence 03 Items for painting
8 Fire resistance paint of connecting plates. Smooth concrete of timber shall be ^;:
co
brackets, rivets, bolts. surfaces and plastered deemed to include co
nuts and similar and rendered surfaces painting the surfaces of Z
projections. and inner shall be classed as recesses, projections,
b
surfaces of openings smooth surfaces. and fittings. >
and outer edges shall Z
be ignored. 04 ^
Rough concrete Z
surfaces and rough C)
rendered surfaces shall ^:
be classed as rough o
=.
sunaces.
7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I Oil paint 4 Rough surfaces I Surfaces of M4 CS
2 Alkyd gloss paint 5 Masonry members: The area measured Items for painting
3 Emulsion paint 6 Brickwork and exceeding for painting p*>ework of pipework shall be
or acrylic paint blockwork 300 mm girth shall be the length deemed to include
4 Cement paint 2 Surfaces of multiplied by the girth painting the surfaces of
5 Epoxy or members: not of each length of flanges. valves. other
polyurethane paint exceeding pipe or lagged pipe projecting fittings and
6 Bituminous or coal 300 mm girth with no deductions or hangers.
tar paint 3 isolated groups additions for flanges,
7 Chiorinated rubber of surfaces valves, other projecting
paint fittings and hangers.
8 Fire resistance paint
7 Metal sections
a Pipework
C,
S;:
co
co
Z
.
^ >
^
in
Z
-
co
^ Z
= C,
n,
^
o
=a
7<
~
,*.
'*
$3<* $<;:
*
$1*
***
>
*'^.
*; 4
e-
',!yGESMM,
,* 4844 *
o
S.
un
54
90 1140
.
.
.
^ -.........,-.
111,
....
^
...~
,,,,-..
o ill
I'
\,
CLASS O
PIPEWORK
MyCESMM2 I
LD
ADDITIONAL
^co^
a
CLASS O: PIPEWORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
C, A1 - -.
2 Depth: 1.5 in - 2.0 in in excavation shall be classification of trench excavat, bn shall be for excavat, bn .
Q.
3 Depth: 2.0 in " 2.5 in in measured along the excavation shall be deemed to include shall identify the ;;I
4 Depth: 2.5 in - 3.0 in in centre line of the measured from the preparation of surfaces. commencing surface ^
o
5 Depth: 3.0 in - 4.0 in in Pipeline. commencing surface to multiple handling. of each item for work ^
6 Depth: 4.0 in - 5.0 in in the inverts of the pipes. disposal of surplus involving excavation
7 Depth: 50 in - 6.0 in in M2 excavated material which the commencing
a Depth: Length of trench 02 (including unsuitable surface is also the
Exceeding 6.0 in in excavation shall be Unless otherwise material). up holding original surface.
measured through expressly required. sides of excavation.
and include any space the nominal width of allowance for working A3
occupied by valves the trench shall be space. backfilling, Item description for
(except those in the nominal diameter and removal of dead excavation shall state
chambers) and fittings. of the pipe or of the services. where more than
larger pipe if laid one one pipe is expressly
above the other, plus required to be laid in
500 mm. Where pipes one trench and also
are laid side by side. identify the pipe runs
the nominal trench
width shall be the A4
sum of all the internal Item description for
2 Extra over I Rock ms M3 diameters and spacing C3 trench excavation shall
2 Natural hard ing Excavation in rock, between the pipes. Items for excavation in state the pipe diameter
material natural and artificial plus 500 mm. roads andpavements and location.
3 Artificial hard in$ hard material and shall be deemed to
material unsuitable materials include road cutting
4 Unsuitable in3 shall be measured and reinstatement.
materials as the volume of
5 Roads and in2 the respective item C,
M8
The volume of extra
over excavation and C>
backfilling for pipe laying ^;:
in headings. in thrust co
boring and pipe jacking co
=
^ shall be measured by o
in
co multiplying together the ^
= internal cross-section al ^
^ in
re area of pipe and the
length of the material ^:
o
excavated or backfilled =O
Packing in headings ^
shall not be measured
LO
00
FIRST DIVISION ADDITIONAL - !@ ^
SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
<""
,5^
< o. <
= 2 Below ground I River, stream, culvert M9 05 C8 A6 0 91 g!-
or canal width: in a ^'
^
in
crossings Below ground River; stream, culvert, Items for below ground Item description co ^doF1
Im-3m crossings shall be and canal crossings crossings shall be -
co for below ground r=
^ 2 Rivei; stream. culvert measured as extras shall be classified by deemed to include crossings shall state
^ or canal width:
^O,
re to items for pipes in their widths measured reinstatement, unless where existing linings I\, o co
^--
3 in - 10 in trenches. along pipe, duct or otherwise stated. to rivers, streams. ^to
3 River, stream. culvert culvert centre line culverts or canals are
or canal width; M, O when the water surface to be broken through
cos
=on
^
exceeding 10 in Below ground is at the higher level of and reinstated and the to
4 Fence 3
crossings of streams fluctuation. type of lining. to
=
5 Sewer or drain shall be measured ^
.
6 Wall only where their width A7 co
7 Other stated exceeds I in. Item description to
r,
Q
underground for below ground 3
a
services roll crossings shall state
Plye, ; stream, the diameter and 81
^
A18 81
^
^.
D, O C, 7
Quarter turn valve is Items for actuator shall
the valve that required be deemed to include
quarter turn motion valve where expressly
C,
such as butterfly, ball required.
valve etc. ^:
co
co
D, ,
o
Special valve is a valve
^
that the operation is
.
assisted by the special in
medium such as air ^:
or pressure or valve o
go
operated by itself. 7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
and joints 2 Welded slip nr Joints shall be Mechanical coup"rig Items for joints shall
3 Butt welded nr measured separately, shall mean normal be deemed to include
4 Mechanical nr unless otherwise mechanical coupling thrust block and supply
coupling nr expressly required and stepped of all jointing materials.
5 Flange adaptor nr mechanical coupling. bolts. nuts, washers,
6 Expansion nr gaskets. making good
7 Push-on collar nr of joints both internally
8 Push-on slip and external Iy as
expressly required.
C, 9
Items for welded collar
I Stepped coupling 10^^ts and welded slip
2 Universal coupling joints shall be deemed
to include welding to
the internal of the pipe
and air testing of joints
as expressly required.
7 Flow meter/bulk A20
meter Item description for
flow mete, /'bulk meter
shall state the diameter
and type.
I Jacking pit M20 0,3 C20 A2,
7 Special pipe laying I in heading nr
method 2 Thrust boring 2 Receiving pit nr Special pipe laying Pipe made with Items for special Item description for
3 Pipe jacking 3 Pipe sleeve in methods shall be reinforced concrete as pfy, e laying methods special pipe laying
4 Microtunneling 4 Composite pipe in measured only where the external shell and excluding submarine methods shall Identify
5 Utility pipes in pipe in they are expressly pipe from 04"' and pipe laying sha I be the material and
sleeves required 05*' shall be classed deemed to include nominal diameter, and
6 Pressure grouting ms as coinpos^te pine. mobilisation and the run of pipes.
demobilisation.
5 Controlled I Horizontal in A22
drilling directional drilling C2, Item description for
2 Impact in o11ing in
items for special p*>e ply, e sleeves and
laying methods shall composite pipe shall
6 Submarine pipe I Bathymetric survey in be deemed to include state the type of
laying 2 Sub-sea in
excavation, sheet material. diameter and
geophysical survey piles, shoring. and the class
3 Mobilisation and sum
backfilling.
demobilisation A23 C)
4 Provision of winch sum C22 Item description of ^:
co
equipment Items for sub-sea pipejacking pit shall co
^ 5 Trenching in
geophysicalsurvey state pit size and depth o
^
in
6 Concrete cladding in shall be deemed to of 2 in stages.
co to pipes ^
Include report by a
:= ^
Z 7 Pipes laid by float in
geophysicist. 171
co and sink
^
8 Pipes laid by in o
bottom pull aO
7<
^
o
FIRST DIVISION SECOND DIVISION ADDITIONAL ~ 01 ^
^^^
I\I THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
q< o. <
= 7 Special pipe laying 7 Submarine pipe I Pipes laid by lay in C23 A24 -^
thickness or grade, 16
to
a
Q
a Slip lining A26 =
a
Item description for ;;!
slip Jiming shall state ^
o
the offset where the 5
lining is curved to an
offset which exceeds
35 mm per metre.
S;:
co
C26 co
Items for manhole
o
with backdrops shall
be deemed to include ^
^
the pipework and
associated fittings ^!
comprising the o
=o
backdrops 7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
C29
Testing of gravity
sewer shall be deemed
to include testing by
infiltration as required.
C30
Items for pressure and
leakage testing shall
be deemed to include
provision of all water
required for testing.
c3,
items for flushing and
sternising shall be
deemed to include
chemicals and
provision of water.
CS2
Items for holiday
detector test and
ultrasonic test
shall be deemed to o
include provision of
equipment, testing and
5;:
co
maintenance. co
=
^
in
o
co .
^
Z .
in
I. ,
^
o
=.
>=
Aco^
^
ADDITIONAL
o MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
^ FIRST DIVISION SECOND DIVISION THIRD DIVISION DESCRIPTION RULES =-
< o. <
CSS ASO o. -
^
8 Miscellaneous work 4 Temporary I Temporary in.
< diversion diversion Items for temporary Item description for co^,
do -
c, of Version shall be temporary diversion
in
co
of existing utilities r=
in
existing sewer 2 Manhole junction Manholejunction items for connections Item description for co
c,
connection typical detail shall be as to existing sewer diversion shall state Q
system =
3 Sewer saddle per MslG. system shall be existing material. pipe a
deemed to include and manhole sizes.
connection ;;!
4 New manhole coordination with ^
o
authorities, payment 3
CSS
Items for new manhole
shall be deemed to
include breaking away
of existing sewer pipe
as required, and all
pipework and metalwork
within the manhole.
1140
CLASS P
PIPE
REHABILITATION
WORK
MyCESMM2
^ ADDITIONAL - un :^
o
CLASS P: PIPE REHABILITATION WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
a < 9. <
C, A1 c, , -
M, ing.
:r Measurement covered under other classes:
< The lengths of sewers Items for work which item description shall coZo
to-
n shall be measured is expressly required state the location of
in
co New manho e and pipework (included in Class O: Pfy, ework) to be carried out by work in each item or
^ along their centre ^8.9
= New fittings and valves used in pipe rehabilitation works (included in lines between the excavation shall be group of items. Work I\, o co
---
re
Class O: Pinework>. inside surfaces or deemed to include can be identified Zto
manholes but exclude preparation of by reference to the
Extras to excavation and backfiliing for new manhole and other chainb co=
lengths occupied surfaces, disposal of drawing =co
Oncluded in Class O: PIj, ework) excavated materials.
-,
to
by pipes and fitting a
up holding sides of A2 do
comprising backdrops ,
Q
excavation. crossing, is expressly required Item description a
^
A5 ^
Item description in
for preparation, ^
in
stabilisation, =
renovation and >
laterals shall state CD
r~
the material forming ^
the existing sewer or
-
water main.
o
Z
^
o
^
7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I Rehabilitation of I Cleaning M3 or C3 A6
existing pipework Length of pipework Items shall be Items for cleaning shall Item description for
system shall be measured classed as removal be deemed to include pipework shall state
along their centre of intrusions where pre-cleaning the location of the
lines between the intrusions into the work in each item or
inside surfaces of bores of existing C4 group of items. so that
manholes/ chambers pipework are to be items for cleaning shall it can be identified
but shall exclude removed prior to be deemed to include by reference to the
lengths occupied by renovation. temporary structure drawings.
pipes and fittings and removal after
comprising backdrops 02 completion A7
2 Removal of , Lateral bore n. e to manholes. The areas stated in the Item description
intrusions 150 mm item description for CS for pfy, ework shall
2 Laterals bore M4 local internal repairs Items for removal of state the principal
exceeding 150 mm External grout, ing shall be the finished intrusions shall be dimensions and pipe
3 Other stated shall be measured surface areas deemed to include profiles.
artificial intrusions only where grouting making good.
is expressly required 03 A8
to be carried out as External grouting shall C6 Item description for
a separate operation be grouting of voids Items for surveys shall surveys shall state type
from annulus grouting. outside the existing be deemed to include and copies required.
pipework from within report by licensed A
Ms the existing pipework surveyor. 9
The volume measured other than voids Item description for
for annulus grout, hg grouted in the course C7 removing intrusions
shall not include the of annulus grouting. items for local internal shall state the materials
I Closed-circuit volume measured for repairs shall be forming the intrusion.
3 Surveys
television external grouting. 04 deemed to include
Anflulus grouting shall cutting out. ATO
be grouting of the Item description for
annular voids between C8 pipe burst, hg shall
new lining and existing Items for pipejoint state the pipe diameter. o
pipework and of other seal, hg shall be
voids grouted in the deemed to include All S;:
co
4 Pipe joint sealing I Materials and course of grouting preparation of joints. Where external co
diameter stated annular voids grouting is .
carried out through 'U
pipe joints. 'O
description of items for in
the number of holes ^
in
shall be so stated.
^
5 Local internal >
co
repairs
F
= ^
<
c, ^
in
on
o
^ Z
=
re 6 Pipe bursting
^:
o
=O
7<
^
ADDITIONAL
-co^
Q
00 FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
I Rehabilitation of 7 External grouting I Number of holes A12 o- -
Z ing 5'
^ existing pipework 2 Injection of grout Item description for V, Z n
in
co
system and materials cured in place lining, ^-^
,=
stated in situjointed pipe
=
= lining, segmentallining
^a^,
N 000
N ^ --
and stated proprietary ^to
lining shall state the
co,
type of lining material. =co
-,
grade co
to
*,
o
A's .
a
8 Pipework I Cured in place lining in
Item description for
2 In situ jointed pipe in ;^!
in situj'Dinted pipe ^
A14
Item description for
gunite coating shall
state thickness
2 Rehabilitation of I Abandonment of
existing manholes existing manholes
2 Modification/ I identification of C9 A's
Alteration of lost manhole Items for abandonment item description
manholes 2 Raise-up manhole of existing manholes for rehabi"ration of 61
A18
item description
for water sampl, hg
stet, bn and special
treatment of sludge
shall state details
and descriptions that
can be identified
by reference to the
drawings
D
6 Reinstatement I Landscaping sum
C, 4 A24 ^
2 Roads in2 in
Items for Item description for
3 Pavements in a ^
reinstatement works landscaping, road in
4 Strip topsoil from in2 shall be deemed to and pavement shall T
easement and include connection >
state depth and
reinstate co
and to match existing method.
5 Connections to I~
work ^
existing manhole
and chambers ^
6 Connections to o
Z
existing pipes,
ducts and culverts ^:
7 Other structure o
^
^
CLASS Q
DRAINAGE WORK
MyCESMM2 I
^
^ ADDITIONAL ~ !,; Z
I\, CLASS Q: DRAINAGE WORK MEASUREMENT RULES COVERAGE RULES
DESCRIPTION RULES < 9. <
09:;!!
= Measurement covered under other classes: ing^
^\ co^,
in
co Horizontal and vertical drains (included in Class G: Geotechnica/ work). ^-<
3=
=
^ In situ culverts. sump and inlet/outlet (included in Class I: Concrete work). ^8.9
cooco
N ^^
Brick sidewall for surface drain (included in Class J: Brickwork, blockwork ^to
and masonry). on.
=co
In situ inlet and outlet structures (included in Class I: Concrete work). ^
10
3
Foundations for structures (included in Class H. ' Plying work and do
=
Class I. . Concrete work). .
co
to
FIRST DIVISION SECOND DIVISION THIRD DIVISION c,
o
a
a
I Excavation trench in earth I Depth: Not in M, or Cl A1
exceeding 1.5 in The length of d, ath The depth used Items for excavation Item description I^I
^
2 Depth: 1.5 in - 2.0 in in excavation shall be for classification of shall be deemed to for excavation o
a
3 Depth: 20 in - 2.5 in in measured along the excavation shall be include preparation shall identify the
4 Depth: 2.5 in - 3.0 in in centre line of the drain. measured from the of surfaces, multiple commencing surface
5 Depth: 3.0 in - 4.0 in in commencing surface to handling. disposal of each item for work
6 Depth: 40 in - 5.0 in in M2 the inverts of the drain. of surplus excavated involving excavation
7 Depth: 5.0 in - 6.0 in in The length of drain material Oncluding for which the
8 Depth: in excavation shall be 02 unsuitable material). commencing surface
Exceeding 6.0 in measured up to inlet Earth shall be deemed up holding sides of is also the original
and outlet structures, to be materials other excavation. allowance surface.
and to the sumps. than topsoil, rock, for joints, backfilling,
natural hard material, and removal of dead A2
and artificial hard services Item description
material. or unsuitable for excavation shall
material. unless identify separately
otherwise stated in the excavation which is
item description. expressly required to
be carried out by hand.
2 Extra over I Rock in3 Ms C2
2 Natural hard material ms Excavation in rock, Items for excavation
3 Artificial hard ing natural hard material, shall be deemed to A5
material and artificial hard include reinstatement Item description for
4 Unsuitable materials in3 shall be measured works. excavation shall state C>
5 Roads and in2 as the volume of the size and type of I^:
co
pavements the respective item CS drain and culvert
co
removed within Items for excavation in
o
the limits of drain roads and pavements A4
excavation. shall be deemed to item description for o
extra over excavation =.
include road cutting >
and reinstatement. shall state the width of
Z
trench. >
Gi
in
^:
o
=o
><
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
M6
Volume of excavation
in sumps shall be
measured between
their external surfaces,
or extended base.
until the limits of drain
excavation.
^
o
=.
7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
C, ,
Items for inlet and
outlet structure
shall be deemed to
include concrete.
reinforcement,
formwork, rip-raps,
river protection and all
associated works.
S;:
co
co
o
.
.a
= >
^ Z
in
co >
^ C,
in
^
N
^
o
^
^
This page is deliberately left blank.
1161 MyCESMM2
I
t. ~
,
~:^,,^^
I'm, ,
^I. ,.._,.,. ~
^^^
,,,_,~~-, ..-..~*. - ^^^
.
I^ID"..--
I"'
CLASS R
ROADS AND
PAV I N G S
MyCESMM2 I
^
^
ADDITIONAL -co^
00 CLASS R ROADS AND PAVINGS MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
^ Measurement covered under other classes: Ml or Cl a 91 !!!.
In .
,:^
in
The width of each Subgrade preparation Items for the work in
co to~
<0
co Earthworks (included in Class F: Earthworks) course of materials sub-base, road base, this class involving in =-
a: shall be measured at road shoulder and situ/precast concrete
= Maintenance of existing road and temporary road diversion (included in Class C. . ^'in
N the top of surface of pavement courses shall be deemed to Noco
77affic management and controb. that course. The areas shall be classified ---.
include concrete. Zco
Temporary traffic signs and barriers, barricades. and dellneators (included in of manholes covers as reference to JKR reinforcement, joints,
Class C: Tram'c management and controb and other intrusions Araban7i?knik Oafan) formwork to form and co=
con
^
Fences and gates (included in Class V:: Miscellaneous work). into a course shall not or by other relevant shape and finishes to 40
Geotextile and geogrid (included in Class G. Geotechnica/ work). less than I inz. co
to
c,
o
FIRST DIVISION SECOND DIVISION THIRD DIVISION .
a
in
I Subgrade I Earth C2 ^
o
=
3 Rock
preparat, bn shall be
deemed to include
clearing. grubbing,
stripping top soil. the
scarifying. levelling
and compaction of the
top 300 mm of the
subgrade.
<
Z
C)
co
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
2 Subbase I Drainage layer I Granular material 02 C4 A2
2 Subbase course 2 Latente The granular material Items for subbase Item description for
3 Lean concrete shall be classified course, roadbase shall subbase shall stated
according to gradation be deemed to Include the type, thickness
limits for subbase chainfer spread over and grade where
material in the the full width of the applicable
standard specification formation and to
for road works as include attainment of
expressly required the surface levels
03
Latente material shall
be according to the
gradation limits for
gravel surfacing in the
standard specification
for road works as
expressly required.
3 Roadbase , Removal of flexible in2 04 CS As
surfaces The crushed Items for removal of item description for
2 Crushed in2 aggregates shall be flexible SUFIbce shall roadbase shall state
aggregates classified according to be deemed to include the type, grade and
3 Bituminous mix in2 the gradation limits for scarifying the existing thickness of the
4 Wet mix in2 crushed aggregates roadbase before material.
roadbase in the receiving the new
standard specification roadbase material. A4
5 Stabilised roadbase I Lime for road works as Item description
2 Cement expressly required. for stabi/ised
roadbase shall state
the proportion of
stabilisation agent.
4 Road shoulder I Earth shoulder M2 C6 A5
2 Gravel shoulder The areas of subbase, Earth shoulders shall Item description
3 Paved shoulder roadbase and be deemed to include for road shoulders
bituminous pavement verge. shall state the size, o
courses for road thickness, type and S;:
shoulder shall be material used. co
co
measured under Class
=o
R2". R3", and R5'O
.o
5 Bituminous I Removal of 05 C7 A6 o
pavement courses flexible surface Item surface dressing Item removal of Item description for >
2 Prime coat
.
material shall be in flexible sur, ^ce of bituminous pavement co
= 3 Tack coat accordance with the bituminous pavement courses shall state the >
^
in
gradation limits for courses shall be type and compacted Z
co bituminous surface deemed to include thickness <where .
=
4 Binder course I Asphaltic concrete dressing in the scarifying the existing appropriate) 'u
=
n, standard specification exposed surface. >
<
for road works as
Z
expressly required. 61
co
^
ADDITIONAL ~coZ
I\,
o FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< a<
5 Bituminous 5 Wearing course I Asphaltic concrete in2 06 C8 A7 O 9; IQ.
^
in' Item bituminous Items for bituminous
in a^
^ pavement courses 2 Porous asphalt item description shall ,,, to-
Z,
in
3 Stone mastic asphalt in? pavement courses to pavement courses shall state where removal of
un
^.
= 4 Gap graded asphalt in2 be read in conjunction be deemed to include flexible surface is to be ^Oin
Z 5 Polymer modified in' with JKR Specification cutting of pavement done by milling. re oco
re ^--
asphaltic concrete for Roadwork - Section and attainment of ^ CD
in' 4: Flexible Pavement surface level. AB
6 Recycling I Hot in-place ai -
un.
2 Cold in-place in a Item description for = OQ
-,
to
7 Surface treatment in2
tack coat and prime
I Chip seal coat shall state the
^
to
2 Micro surfacing in2 .
spread rate of applied
3 Crack sealing in2
surface finishes. co
4 Coloured in' to
h
surfacing system Q
.
Q.
8 Regulating course t
of stated materials I^I
^.
^
Q
markings 2 Continuous line in Lengths measured The colour of the Item description for :,
3 Intermittent line in for linear pavement pavement markings, pavement markings
4 Chevron marking in2 markings shall not shall be deemed to be shall state the material
include gaps in white unless otherwise grade, size, and
intermittent line. stated. diagram number taken
from JKR Araban7ekmk
M, , Oafan) or by other
Area measured for relevant authorities.
chevron marking shall
be the gross area A21
item description for
pavement markings
shall state the
shape, type. e. g.
thermosetting plastic,
and colour if required.
A22
Item description a
shall state temporary S;:
pavement markings co
co
and its subsequent
removal =o
A28
Item description
for guardrail end-
treatment shall state
the type of treatment.
S;:
co
co
=o
ao
o
>
.
Z co
^ >
Un Z
in
^ .
= .
n,
<
Z
C)
co
^ -coZ
ADDITIONAL
N
^ FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
C, 7 A29 a. -
a Road furniture 5 Miscellaneous I Crash cushion nr
in a,
= Items for crash Item description of
< 2 Crash barrier nr co^n
c,
in 3 Kilometre post nr cushion, crash baffle, ; crash cushion, crash ,=
co
= 4 Hectometre marker nr kilometre post, barne, ; kilometre post, ^am
^ 5 Anti-glare screen in hectometre marke, ; hectometre marke, ; N 000
^~-
co
6 Noise barrier in anti. glare screen, noise anti-glare screen, noise Z CD
7 Right of way nr barne, ; and r^ht of barne, ; and right of in-
co.
marker way marker shal be way marker shall state cto
-,
to
deemed to inc ud the the Iz type and ^
supply and installation material 10
.
^
of the said items .
o
anti-glare screen, noise =
C, a A3,
6 Gantry
Items for gant, y shall Item description for
be deemed to include gantry sha I state the
fabrication Insta Iation, type, mater Ia s and
foundation work principal d mensions
and protective and
decorative surface
treatment
61
^:
co
co
^
=.
o
>
o
co
>
Z
.
.
>
<
Z
C)
co
q~
.^*..
C LAS S S
TUNNEL WORK
MyCESMM2 I
-un^
ADDITIONAL
^
,*., MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^""
a CLASS S: TUNNEL WORK DESCRIPTION RULES .< a<
C,
a. -
in a,
= Measurement covered under other classes: Plant and equipment co O-
Z cj
<
n shall be deemed to ^.
in
CJD
External stabilisation work (included in Class G: Geotechnica/ work). Include the purchase ^'in
^ reoco
a= cost. factory ^, - -
N
Micro tunnelling for pipework (included in Class O. . PIPework) acceptance test, Zco
External drainage system (included in Class Q. Drainage work) assembly and DJ -
co.
transportation to site =co
Excavation, filling, and turfing for external work Oncluded in Class F: Earthworks). ,
to
including maintenance ^
Cut and cover tunnel Oncluded in Class F: Earthwork and Class I: Concrete work) cost. to
=
^
o
=
C2 A1
I Temporary , Facilities I Power supply sum
Items for temporary Item description for
requirements system
2 Water supply and/ sum
facilities shall be temporary launch/
for Tunnel Boring deemed to include all retrieval shaft shall
Machine or treatment system
provision as expressly state the number of
3 Ventilation system sum
required. shaft.
4 Lighting system sum
^
Z
Z
in
F
^
o
=a
7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
tunnel boring 2 Twin track The volume measured Items for bored tunnel Item description for
co
machine for excavation shall shall be deemed to bored tunnel shall state to
n
be the payment lines include all plants and the external diameter. Q
a
shown on the drawings equipment during a
A14
item description for C,
shotc, ete reinforced
with fibres. shall state S;:
co
the dosages of the co
= fibres added to the mix. co
c,
2 in situ concrete I Mass
Un
co
2 Reinforced
M4
A's I^
= The volume for cast in Z
^
situ concrete shall be item description for Z
re
in situ concrete shall in
the nett dimension of F
state admixtures where
the lining volume. ^
required.
o
=O
><
-,
ADDITIONAL
-co^
9.1
o FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
<""
< a"
4 In situ lining 3 Reinforcement I Mild steel bar Ms 02 C, 6 A, 6 -, ^
= ing,
< 2 High tensile steel The mass of steel The nominal diameter items for reinforcement Item description for co I^ c,
n to -
in bar reinforcement shall be stated in item shall be deemed to bar reinforcement shall
co 7=
= 3 High tensile steel taken as 0,785 kg/in description for bar include labour for state the size of the ^'in
= fabric per loomm' of the reinforcement shall cutting. bending, and bars. Noco
N ^--
4 Fabric of other cross-section (7.85 be the cross-section al placing. ^in
stated material t/in'). The mass of diameter defined in Ms A17
on.
the other reinforcing 146 item description cco
-
"7
The areas of additional
fobric reinforcement
in laps shall not be
measured.
4 Formwork Ma C, 7
Formwork shall be the Items for formwo, k
nett surface of in situ shall be deemed
concrete. to include travel
steel form for all
inclinations. alignment
and end form to
the construction
joint form for all
inclinations, alignment,
and end form to the
construction joint.
5 Waterproofing I Waterstop M9 03 C18 AT8
C,
2 Membrane The length of Membrane shall be a Items for waterstop Item description for
waterstop shall be layer of impermeable shall be deemed to waterproofing shall I^:
co
measured along their materials installed include cutting, jointing state the type of co
centre lines. in the tunnel before and special fittings at materials and size. co
PIac rig in situ concrete angles and junctions
M, O or shotsrete. either I^
The area for membrane using sheet CT9 Z
Z
shall be the nett area system, to keep water Items for membrane in
Lapping shall not be from entering. shall be deemed to F
C23
Items for annu/us
grouting shall be
deemed to include
corrosion protection,
stiffener. fish tails. and
purpose made holes.
6 Tunnel support I Steel support I Steel rib M, 3 C24 C>
A22
The areas of additional Items for the steel item description for ^:
fobric re^^forcement co
support shall be steel support and co
in laps shall not be deemed to Include all lagging shall state co
measured necessary accessories the dimens ons and
= ^
*,, such as tie rod. end nominal mass C
in
co
plate bolts and nuts. Z
^ 2 Lagging I Steel section A23 Z
in
Z 2 Steel plate
re Item description for I~
3 High tensile steel permanent tunnel ^:
fabric reinforcement support shall be o
=O
measured separately X
^
LLD ADDITIONAL ~co^
N FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^
DESCRIPTION RULES
< o. <
6 Tunnel support 3 Bolting I Rock dowel C25 A24 09121
^ in a ^;
< 2 Rock bolt items for bolting shall Item description for
n coZa
CD -
in 3 Pull out test be deemed to Include
co bolting shall state the ^.
A27 o
=
Item description for fore
porng shall state the
6 Fore poling I Dowel bar
length and diameter of
2 Canopy tube the dowel bar
A2B
Item description for
canopy tube systan shall
state length, diameter
and thickness of tube.
7 Backfill I Invert I Concrete in3 MIS A29
2 Behind lagging 2 Shotcrete ing Volume for backfillshall Item description for
3 Other underground 3 Mortar ing be the nett dimension invert shall state the
space 4 Grout ms of volume to be filled principal dimension.
5 Tunnel inuck m' Backfill to over break
shall not be measured
MIG
item for backfiJl behihd
lagging shall be the
nett volume of gap
between the lagging C)
and the nett excavation
^:
profile co
co
a Tunnel I Convergence nr C26 Ago
co
Instrumentation measurement Items for tunnel Item description for tunnd
2 Settlement instrumentation shall be instrumentation shall state ^
nr
deemed to include all C
measurement
the specification detail
Z
provision and accessories Z
3 Stress I Strain gauge nr as expressly required in
measurement 2 Pressure cell nr F
3 Inclinometer nr ^:
4 Pneumatic nr o
=o
piezometer ^
, ..
~^---^I'
.,,,,,,,,,
\ ..^.
-^
I, .
. ~..
I""'
CLASS T
RAIL TRACK
MyCESMM2 I
^
IAI
CLASS T RAIL TRACK ADDITIONAL -. co ^
&. MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
< o. <
^ Measurement covered under other classes: C, A1 ^^
rig,
^
in
items for supplying Item description for coZa
co Earthwork, sub-grade preparation and sub-ballast (included In shall be deemed to supplying shall state
a= Class F: Earthworks). include delivery and all the location of delivery
=
re necessary associated where expressly
^a^
I\, o oa
Geotextile and geogrid (included in Class G: Geotechnica/ work). components to site required.
^--
^@
Concrete track foundations (included in Class I. . Concrete work)
on.
=to
-,
FIRST DIVISION to
SECOND DIVISION THIRD DIVISION
^
to
a
I Supplying I Track foundation I Bottom ballast M, or A2
2 Top ballast The volume of top Ballast below the Item description for to
3 Waterproofing ballast measured shall soffit level of sleepers. supplying bottom and do
r,
o
membrane include the volume timbers or bearers of a top ballast shall state a
a
occupied by sleepers track shall be classed the type of material
as bottom ballast. and grading. I^!
^.
^
M2 o
a
Sub ballast shall be 02 A3
measured under Class Ballast above the Item description for
F34. . underside of the waterproof membrane
sleepers, timbers shall state the type,
or bearers shall be grade and technical
classed as top ballast. specification
3 Sleepers I Timber A5
2 Concrete Item description for
3 Steel supplying of sleepers
4 Special type shall state the type, o
size and identify
the fittings which
I^:
co
are attached by the co
supplier. ,,
.o
>
I~
^
20
>
C>
7<
FIRST DIVISION SECOND DIVISION THIRD DIVISION ADDITIONAL
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
I Supplying 4 Conductor I Mass. not exceeding in
C2 A6
rails 20 kg/in Items for supplying Item description for
2 Mass, 20.30 kg/in in
of conductor rails supplying of conductor
3 Mass, 30 - 40 kg/in in
shall be deemed to felts shall state the
4 Mass. 40 - 50 kg/in in
include guard boards, type.
5 Mass, exceeding in
fixings. bolts, nuts.
50 kg/in screws, washers.
insulating bushes,
cable terminals, rail
insulators, rail supports.
rail expansion joints,
ramps (high/low
speed). covers and
packing.
5 Fittings I Chairs nr M4 C3 A7
2 Baseplates nr Fishp/ates and Items for supplying item description for
3 Rail fastenings nr '81/1bints shall be of f, ttfu, 95 shall be supplying of f, ttings
4 Plain fishplates nr measured by number deemed to include shall state the type.
5 Insulated fishplates nr of pairs fixings, keys, clips,
61nsulated rail joints nr
washers. bolts. nuts,
7 Glued insulated rail nr
screws. insulating
joints
bushes, spikes, ferrules,
track circuit insulator.
shoulders. pads, shims.
baseplates, inserts and
packing.
6 Turnouts
C4 A8
7 Diamond crossing
Items for supplying of Item description for
turnouts and diamond supplying of turnouts
crossing shall be and diamond crossing
deemed to include shall state the type,
timbers, fittings and type of joint and
check rails. length
2 Supplying I Sundries I Buffer stops nr
A9
2 Wheel stops nr
3 Lubr cators
Item description for
nr
4 Switch levers
supplying of sundries
nr
shall state the type
5 Rail expansion joints pr
6 Jumper cables nr
A10
7 Traction rail bonds nr
C,
Item description for
a Signalling rail bonds nr
supplying of buffer S;:
2 Sundries I Stray current nr stops shall state their co
= co
^ continuity cables approximate weight ^
in 2 Cross track ducts nr
co
=o
= An
^ >
re item description for F
supplying of cross track H
ducts shall state their ^
>
duct size and length. C>
7<
^
LLD
O, FIRST DIVISION SECOND DIVISION THIRD DIVISION ADDITIONAL ~ ;:! z
MEASUREMENT RULES EFINITION RULES COVERAGE RULES ^""
DESCRIPTION RULES
< o. <
Z 2 Supplying a Rail furniture I Kilometers marker A12 O e; !g
^ 2 Change of in a^
in
Item description co^o
co geometry, for supplying of re"
^ horizontal and ==
furniture shall state the ^am
^ vertical markers
N type. 1.3 0 on
3 Turnout markers nr ^, ^ -
Z to
4 Track slab markers nr
ai -
5 Conductor rail nr co=
= 00
-,
support marker co
6 Fouling point nr ^
10
markers =
^
,
7 Level crossing nr
co
to
4 Cable trough I In situ in CS A's r,
o
2 Precast in ^
Items for supplying Item description for a
of cable trough shall supplying of cable in
a
be deemed to include trough shall state the ^
o
the cable trough type and size. =
lid, reinforcement.
concrete, formworks,
jointing.
3 Gas pressure
flash butt welded laying of welded Joints
joints, alumino therinic shall state the rail
welded joints and section and the type of
gas pressure shall be weld.
deemed to include
welding kits.
C14 A23
7 Turnouts
Items for laying of Item description for
8 Diamond crossing
turnouts and diamond laying of turnouts and
crossing shall be diamond crossings
deemed to include shall state their type,
timbers, fittings. and type of joint and
check rails. length.
CIS A24
4 Laying I Sundries I Buffer stops nr
Items for laying of Item description for
2 Wheel stops nr
support marker
6 Fouling point nr
markers
7 Level crossing nr
^
ADDITIONAL -co^
Q FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES ^""
< a^
= 5 Dismantling I Flat bottom rails I Plain track M, 2 CT9 Ago O 9! !!!
.<
2 Turnouts The length of in a^
r, Items for dismant"rig Item description co^,
in
co
=
3 Diamond crossings dismantling of shall be deemed to for dismantfing of ^^ ^ ==
plain track shall be include taking up, work from which ^Qin
^
I'D measured along the lifting, packing and the materials arising I^ o co
^--
centre line of the track slewing. remain the property ^to
(two rail) taken over all of the employer shall
roads and shall exclude C20 be stated as well as co=
cco
^
lengths occupied by Items for dismant"rig the handing over and to
C2, described. o
a
Items for dismantling
2 Check and guard M, 3 of turnouts and A31
rails The lengths of diamond crossings item description for
3 Conductor rails dismantffng of shall be deemed to dismantling of plath
checkral/ and include checkrai4 track shall state the
guardrails and guardrail and approximate weight
conductor rails shall conductor rails. of taking up. details of
be measured along the disposal of the track
lengths of the rail <0ne and the type of rail.
rail) and shall exclude sleeper and joint
lengths within turnouts
and diamond crossings
A33 Ci
Where extra ballast ^;:
is required. item co
CD
description for
dismant"rig shall be ,,
stated. =o
>
I~
-
^
>
C>
7<
.~
o
'" 545
_ _, -'il 111!^';^.
,, .
I, ,,
I"'
CLASS U
MECHANICAL AND
ELECTRICAL WORK
MyCESMM2 I 141
^ -co^
^. ADDITIONAL
N CLASS U: MECHANICAL AND ELECTRICAL WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^
Valves <1ncluded in Class O .. Pipework). respective employer's and Install all fittings type of services and ^ CD
specification. and accessories and reference to the co-
co=
any modification works drawings. =co
-,
co
02 to authority's approval. =
terns for electrical A2 to
=
supplied and installed C2 Item description ^
shall be rated for the items for mechanical for mechanical and co
to
intended voltage and and electrical work electrical work shall F1
o
in accordance with the shall be deemed to state the type, material, =
a
relevant and latest IEC include mimic-panel, size. thickness. design
I^!
Standards. tagging. labelling, capacity, method of ^
^.
o
and painting where fixing and reference =
03 necessary given to applicable
Items for electrical specifications and
systems shall be CS specified qualities.
fire rated. weather items for mechanical
proof. waterproof and and electrical work
explosion proof as shall be deemed to
expressly stated. Include all ancillary
works as expressly
stated.
^:
I Ducted services I Circular ductwork I Straight M, As co
co
2 Rectangular 2 Curved Lengths of ducted Item description for
circular ductwork and C
ductwork 3 Fittings and cabled services
3 Flexible ducting 4 Insulation work systems shall be flexible ducting shall ^
measured along the state the diameter. in
C)
centre line including =
lengths occupied by >
fittings. Z
Ci
2 Cabled services I Cables/conductors I Laid/drawn into in >
I~
conduits, trunking
or duct >
Z
2 Laid on trays in .
3 Fixed to surfaces in in
4 Laid in trenches in I~
in
5 Suspended in
6 Busbar trunking/ in
^:I
=o
busduct C>
>
r
2 Conduits I Plain
2 Flexible ^:
o
3 Box fittings =a
7<
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES ADDITIONAL
DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
2 Cabled services 3 Final circuit I Cable only in C4
2 Cable and conduit in
Items for I, ^ht, hg/
3 Lighting/power point nr
power point deemed
4 Trunking I Plain in to include the cable,
2 Fittings in cable containment.
3 Busbar tr in and other necessary
accessories.
5 Earthing and I Tape in
bonding 2 Fittings nr
6 Accessories I Trays in
2 Switches nr
3 Lighting outlets nr
4 Sockets nr
Compressor
4 Fan Coil nr
4 Cooling tower nr
5 Water treatment nr o
system ;;:
co
4 Fan I Propeller nr 04 A4 co
2 Axial nr items for fun shall be Item description for fan C
3 Forward curved nr categorised as radial/ shall state the rating.
impeller propeller, centrifugal ^
in
4 Backward curved nr axial, centrifugal 61
impeller forward. etc ^
5 Radial type impeller nr >
Z
6 Airfoil type impeller nr
Ci
5 Accessories I Insulation in2 CS >
I~
2 Filter nr
items for grilles shall
3 Diffuser nr
>
be deemed to include Z
4 Air grille nr
termination box, air .
5 Acoustic grille nr
dampers (where in
6 Variable volume box nr relevant) and with
I~
in
= 7 Silencers nr or without acoustic
^ a Louvers nr insulation.
Cj
^
in
co
= 6 Dampers I Fire damp nr 05 C>
^ 2 Volume co nr >
N
Items for fire damper F
3 Isolation nr shall be caregorised as
^:
electric actuator. fusible o
link or pneumatic =o
7<
^
.
3 Total flooding fire I Gas kg C6 A6 01
extinguishing 2 Gas cylinder nr
Items for fire fighting Item description for to
r,
system/wet 3 Cylinder strap nr
shall be deemed total flooding fire
o
a
chemical system 4 Outlet adapter nr
to include groove extinguishing system/
a
5 Cylinder valve nr
coupling, groove wet chemical system I^I
6 Emergency nr
end cap, bracket, shall state the type of o
a
release handle
junction box. flexible gas.
7 Nozzle nr
connectors, strainers,
steel section, jointing
and other accessories.
5 Accessories C
I Breeching inlet nr
07 C8
2 Manual selection nr
^
switch items for controlpane/ Items for controlpanel in
shall be categorised as shall be deemed to Ci
3 Pressure gauge nr
=
4 Pressure switch manually or automatic. include built-in battery
nr >
5 Mechanical tee nr
and charger and other Z
6 interface terminal nr
accessories and any C>
modification works >
box F
7 Fire shutter nr
>
a Flashing beacon nr Z
.
6 Accessories I Alarm valve static nr C9
In
2 Sprinkler nozzle nr items for hose reel set F
in
3 Hose reel set nr deemed to Include
4 Cabinet nr drums, swivel arm, ^
^
5 Landing valve nr cradle. hose and nozzle Ci
>
I~
CIO
items for landing valve ^:
deemed to include o
=o
coupling. 7<
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES ADDITIONAL
DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
5 Piped services I Accessories I Pressure vessel nr M2 C, , A7
2 Multimedia filter nr Piped services Items for piped Item description for
3 Particle diverter nr measured over all pipe services shall ply, ed services shall
4 First flush device nr fittings. short running be deemed to include state diameter and
5 Basket strainer nr lengths and branches all fittings, jointing, jointing method
6 Oil & grease nr in linear metres fixing and perforating
Interceptor the pipe or flange. A8
Item description for
2 Pipework I Cold water sum Ms C, 2 purpose made and
plumbing system Item description for items for storage tank bare piped services
2 Soil and waste sum flexible p*, es and shall be deemed to shall be stated
plumbing system extensible pipes include supporting
3 Sanitary appliance sum Cineasured as fully frame. A9
and fittings extended) shall be Item description for
4 Recycle water sum stated pipework in or fixed
plumbing system in ducts, trenches and
5 Rain water sum
chases or embedded
harvesting system in in situ concrete or
6 Gas pipe sum
screeds shall be stated.
7 Storage tank nr
&.
SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES DESCRIPTION RULES
O, FIRST DIVISION < a<
C16
a. -
o10 in a,
6 Electrical services 4 Extra low voltage
^ All incoming electrical Items for incoming co^a
<below 50 V)
^:,
in
services and main electrical services shall 3=
co
^
installation shall be deemed to include ^8. g,
N oon
= be described in connection cable ends - --
I. ,
conjuction with and all cable tails and ^in
manufacturer's details cable termination co=
and specification. glands Con
^
in
3
C, 7 40
a
items for electrical
services shall be co
10
deemed to include e,
o
=
ratings. capacity. type, Q.
configuration <1/2 way 151
switches. single or ^
o
gang switches. switch =
C, B
The lightning
protection/earthing
installation shall C,
include all the
necessary excavation,
^;:
co
concrete pit. make co
a Low Voltage nr
enclosure
o
mechanical based. a
015
Items for aerat, bn type
shall consist of but not
limited to air blower
aerator, surface aerator.
brush aerator, fixed
type surface aerator,
submersible aerator,
paddle aerator, ejector, Ci
diffuser, membrane
aerator and etc.
I^:
co
co
C
0,6 C26 A14
Mixer is the device for
^
Items for mixer shall be Item description for in
mixing the chemicals deemed to include all mixer shall state the C,
Z
in the pre and post supply. install. jointing, type of mixers. >
treatment process. integration with other Z
structure and make C>
good >
r
>
Z
6 F10cculation
M7 0,7 C27 A's
o
Other ancillaries work F10cculation refers to The F10cculation shall item description for in
related to floccu/ation the process by which be deemed to include floeculation shall state F
in
and sedimentation fine particulates are all supply, install and the function.
shall be measured caused to clump make good.
q
^
using their respective together into a o
classes. flocculation. >
r-
^:
o
^
><
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
a Mechanical work , Equipment and 7 Sedimentation 018 C2B A16
appliances a Clarification Sedimentstibn is a Items for Item description for
process built with sedimentation shall be sedimentst, bn and
mechanical means for deemed to include all clarification shall
continous removal of design, endorsement, state the function and
solids being deposited approval drawing. as associated works
by sedimentation built drawing, fittings
inclusive of clarifier and accessories and A17
and thickener. any modification Item description for
works. supplied. clarification shall state
0,9 delivered and installed the type of dissolve
Clanficat, bn is the on site. air flotation CDAF).
process that solids or etc, function and
particles rising to the associated works.
surface
A18
Item description for
sedimentation and
clarification shall state
type i. e clarifier or
thickener and to define
the process i. e lamella.
tube settler, solid
contact. sand ballasted
^ system =o
to ^
^ -co^
ADDITIONAL
Ul
Q FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES EFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^"g
< a*^'
022 a 91 !!!
a Mechanical work 2 Equipment and in=
Z
appliances The chemical and co^,
CD to-
in
co
special treatment ==
Q
scrubber system, .
facility Item sludge treatment The sludge treatment Item description for
5 Dewatering system sum foci"ty and dewatering 16cMty and dewatering mechanical type sludge
system type shall system shall be treatment foci, ,ty and
consist of but not deemed to include dewate, ing system
limited to decanter, all design, drawings. shall state all related
belt press, filter press, endorsement, supply, components. function,
drum thickener, etc. deliver. installation, and associated works Ci
A23 C}
>
Item description for non r
mechanical type sludge >
treatment facility and Z
o
dewatering system
in
shall state in detail all I~
in
related components
type I e sludge lagoon, :^
^
sludge drying bed etc
C)
inclusive of all necessary >
associated works and F
CSS
The installation of
lifting equipment shall
be deemed to include
obtaining the PMA
Certificate from DOSH
^
in
equipment shall be A27 ^I
=.
co
deemed to include Item description for
= obtaining of the PMT non-pressure tanks o
^ >
re
Certificate from DOSH. shall state the function. r
^
o
=o
7<
^ ~coZ
V,
N FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
ADDITIONAL
DESCRIPTION RULES
^""
< o. <
^ -.
8 Mechanical work 026 A28
= 3 Equipment and I Other equipment in a,
appliances and accessories Items for other item description for co^a
^ other equfy, merit and <-^
Un equipment and S=
Un
accessories shall accessories shall state ^ 8. in
Z
^ be categorised but the function. re oco
^--
re
not limited to odour ^ 10
control, exhaust fan, co=
pump guide rail, guide = 00
^
co
barholder and float
^
switch CD
.
co
to
h
o
.
a.
4 Miscellaneous I Rotating 027 CS6
028
Item for non-
C>
rotating equipment
shall include but ^;:
co
not limited to tube co
diffuser. universaV C
flexible coupling/
adaptor. analyser rack, ^
in
laboratory equipments, o
headstocks/ spindlers. T
portable actuator, tools >
Z
and spare parts etc
C,
>
F
3 Effluent equipment 029
Item for effluent >
Z
equ^, merit shall .
include but not limited
in
to flowmeter, parshall F
in
flume. thickener, UV
disinfection system. !^
^
ozone etc.
C>
>
r-
^:
o
go
7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
8 Mechanical work 5 Instrumentation I Flow measurement nr MB 030 CS7 A29
2 Level measurement nr The associated works Item for quality Instrumentation item description
3 Pressure nr to instrumentation measurement shall shall be deemed to for flow measuring
measurement shall be measured consist of but not include all wiring. equ", merit shall state
4 Quality nr separately under limited to water and air control panel, fittings, the system plant
measurement respective classes of quality in compliance hacking, conduit. type. function and
5 Water content nr work. to authorities related accessories and associated Integration
analyser requirements. all associated works with other system.
including making good.
03, A30
Item for water Item description for
contents analyser level pressure and
type shall consist of quality measuring
but not limited to pH equdy, merit shall state
analyser. temperature, the system plant
turbidity, conductivity, type i. e ultrasonic,
iron aluminium, etc. . function and
manganese, chlorine. associated integration
colour, fluoride with other system.
hydrocarbon, oxygen
demand. sludge stray. Asl
chlorine. ammonia, Item description
salinity. stream current for water content
monitoring (SCM) analyser shall state
type of analyser and
all associated works as
expressly stated o
;;:
co
co
C
^
in
C>
=C
>
Z
C)
>
F
>
Z
o
in
r-
in
^
.^, !^
^
in
co Ci
^ >
= r-
N
^:
o
=o
7<
..
ADDITIONAL ^co^
Ul
^ FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
=""
< a. ^
a Mechanical work 6 Pumps I Positive nr M9 032 C38 As2 O 9! !!!
^ in a^
<
CD
displacement Item for replacement Pumps shall be Items for pumps Item description for co^,
in
co
2 Dynamic nr of motor to be stated categorised to type of shall be deemed to motor shall state the ^^^ ==
Z 3 Special nr separately when pumps Ie dosing pump, include all fittings and type of motors. power ^0,
^ 4 Diesel nr expressly required metering pump. jet accessories and any capacity. I^, 000
re ^ --
5 Motor nr pump etc. modification works ^to
supplied, delivered and As3
co=
DSS installed on site and Item description for cco
^
in
Positive displacement make good all joints motor with pumps a
pump is a pump which shall be stated when co
=
is catsgorised whether C39 expressly required ^
034 o
washers, and gaskets ,
DSS
Ci
Special pump is
the pumps that is
^:
co
determined to be used CD
for special purpose C
other than positive
^
displacement and in
dynamic pump. Ci
=
>
036 Z
A motor is a machine Ci
which converts electric >
r
energy into mechanical
>
energy which Z
categorised under o
synchronous (plain and in
F
super) and induction in
<5quirrel cage and slip
ring) motors.
!^
=o
Ci
>
F
^
o
^
7<
t. ..
- -:^^.^^^.
,,
-^^
o I''"!,, ,,,.
I"'
\
CLASS V
MISCELLANEOUS
WORK
MyCESMM2
^
in ADDITIONAL ~ co :<
01 CLASS V: MISCELLANEOUS WORK MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
o- -
^ Measurement covered under other classes rig=
^
c, co ZCDF1-
in
on SIIt fence (included in Class B. . Environmental protectibn and enhancemen
^
= Brickwa11 <1ncluded in Class J .' Brickwork, blockwork, and masonry). ^am
Noco
I. , ^, ^ -
^ 10
FIRST DIVISION SECOND DIVISION THIRD DIVISION
91 -
on=
con
I Fences I Timber in in Cl A1 ^
co
2 Metal in The length of fences items for I^, rices and Item description for a
CD
3 Chain link in shall exclude lengths gates shall be deemed tonces and gates =
4 Barb/bladed wire in occupied by gates. to include excavation. shall state the types,
dimensions and size of to
5 Composite material in foundation. preparation to
a
6 Concrete in of surfaces. type of foundations. o
a
7 Precast concrete in finishing, disposal of a
panel excavated material. A2 81
up holding sides of Item descriptbn for ^
o
excavation, backfilling. fonces shall state the a
2 Gates C2 As
items for tonces shall Item description for
be deemed to include it?rices shall state the
all posts and their types of metal and
foundation. grade of timber used.
CS A4
Items for chain link shall Item description for
be deemed to include chain link shall state
all posts, raked angle, the size. gauge and
straining wires, barb protective coating of
wires. kerbs where wire mesh
applicable and their C>
foundation. A5
Item description for
I^:
co
C4 gates shall state number co
Items for gates shall size of leaf and type of <
be deemed to include finishing. ^
posts and foundations. co
hinges, bolts. rollers, A6 C)
in
lockplates and all Item description for I~
necessary welding. gate shall state the E;:
mode of operation. Z
CS in
o
it mode of operation of C
gate is automatic. the co
items shall be deemed
^:
to include the control o
system =o
7<
ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
A8
Item description for
external and internal
signage shall state the
type of material. size
and location.
<
co
61
in
F
Z
^:
Z
^ in
in o
co
^ C
co
^
re
^:
o
=o
7<
This page is deliberately left blank.
158 I MyCESMM2
I, ., ,,,
I, ' ~~"'.'
.,
~~~:=^! ,
C LAS S W
PROVISIONAL AND
PRIME COST SUM
MyCESMM2
^
ADDITIONAL -co^
a
Q CLASS W: PROVISIONAL AND PRIME COST SUM MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< 9. <
o, -
Z Measurement covered under other classes: in=
^ co Z cj
to-
in
CJD ^ ^^;
= FIRST DIVISION SECOND DIVISION THIRD DIVISION Zori
a: N o00
I\, ^ --
I Provisional sums I Item stated M, or C, A1
Zco
Each prime cost The term 'jinme Items for provisional item description for ~-
ms
sums item shall be cost sum' is defined sums shall be deemed provisional sums and c00
^
followed by an item as a sum provided to include allowances prime cost sums shall to
^
for attendance and for work or services to programme, plan identify the work to
.
percentage for profit. to be executed and price the works included.
by a nominated within the tenderer's co
in
M2 sub-contractor. a general items FD
o
Where provisional and government or a a
a
prime cost sum form a statutory authority or
separate bills in the bill for materials or goods I^!
^.
^
02 I;:
co
The term t>rovi^brief co
sum' is defined as a
^:
sum provided for work
or for costs which ,
.O
cannot entirely be o
foreseen. defined or <
detailed at the time the co
3 Prime cost sums I Item stated sum
tender documents are o
2 Attendance sum Z
issued.
3 Profit % >
F
03 >
Item stated is the Z
item identified to o
be measured as .
,a
provisional sum or
^
prime cost sum. in
C>
o
co
co
C
^
o
.
">
.
9
a 9.15
.
.
.
us. ........
^
^
~~..... ~..,
,^,,,,,
in, ,
-..
.-. e--
I, ,, *
. ~^..
,
I"'
BIBLIOGRAPHY
MyCESMM2 I
Malaysian Civil Engineering
Standard Method of Measurement . Second Edition
(MyCESMM 2) BIBLIOGRAPHY
BIBLIOGRAPHY
L51 Malaysian Standard Method of Measurement for Civil Engineering Works, CESMM,
Construction Industry Development Board (CiDB), 2003
[6] Malaysian Standard Method of Measurement for Civil Engineering Works, MyCESMM,
Construction Industry Development Board (CIDB), 2011
E71 Malaysian Standard Method of Measurement of Building Works, Second Edition, SMM2,
Instituitionsof Surveyors Malaysia <1SM), 2000
162 I MyCESMM2
ACKNOWLEDGEMENTS
My CESMM2 I
Malaysian Civil Engineering
Standard Method of Measurement . Second Edinon
IMyCESMM 2) ACKNOWLEDGEMENTS
ACKNOWLEDGEMENTS
Members of Working Group on Malaysian Standard Civil Engineering Standard Method of Measurement
Datuk Ir. Abdul Kadir Mohd Din (Chairman) Ranhill Capital Sdn Bhd
Prof. Ir, Dr. Hanah Siti Hawa Hamzah Board of Engineers Malaysia
Mr. Abdul Rahim Abdul Salam Indah Water Konsortium Sdn Bhd
Mr. Ahmad Hafizullah Amir Ahmad Razali Suruhanjaya Perkhidmatan Air Negara
164 MyCESMM2
c Copyright 2018
All rights reserved. No part of this publication may be reproduced or utilised in any form
or by any means, electronic or mechanical, including photocopying and microfilm, without
permission in writing from the CIDB Malaysia.
!;!P, ^^
CONSTRUCTION INDUSTRY
DEVELOPMENT BOARD
T '60s 4047737117372
F '60s 404T 7330
WWWCidb gov my
TSBN 978-967-0997-22-3
9 789670 9,7223