PROJECT : 3 STOREY SHOP OFFICE IN ALAM AVENUE, SELANGOR

BILL NO.1 : INFRASTRUCTURE WORKS (ALL PROVISIONAL)


RATE AMOUNT
(RM) (RM)
ELEMENT NO.2 : SEWERAGE WORKS
Soil Description and Existing Services
Sewerage Pipe
A. Excavating trenches to receive pipes size 225mm
Diameter, starting at ground level, maximum depth not
exceeding 2.00m deep, average depth 1.50m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil M 47
B.
M 5
C.
M 63
D.
M 6
E.
M 33
F.
M 3
G.
M 8
TO COLLECTION RM
Excavating trenches to receive pipes size 225mm
Diameter, starting at ground level, maximum depth not
exceeding 2.00m deep, average depth 1.75m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil
Extra over excavating trenches to receive pipes size
225mm Diameter, starting at ground level, maximum depth
not exceeding 2.00m deep, average depth 1.75m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil for excavation in
rock.
Excavating trenches to receive pipes size 225mm
Diameter, starting at ground level, maximum depth not
exceeding 4.00m deep, average depth 2.00m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil
Extra over excavating trenches to receive pipes size
225mm Diameter, starting at ground level, maximum depth
not exceeding 4.00m deep, average depth 2.00m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil for excavation in
rock.
Excavating trenches to receive pipes size 225mm
Diameter, starting at ground level, maximum depth not
exceeding 4.00m deep, average depth 2.25m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil
ITEM
REF.
DESCRIPTIONS UNIT QUANTITY
This bills of quantities shall be read in conjunction with
preambles and specifications
1.0 Ground water level was established at 3.00m below
existing ground level on 9 September 2014 which shall be
designated as the pre-contract level.
2.0 The work is to be carried out a minimum distance of
50m from a canal the normal level of which is 3.00m below
ground water level.
3.0 Telephone wire cross over the site at a height of 15.00m
on the line shown on the location drawing.
BQ 1/1
Extra over excavating trenches to receive pipes size
225mm Diameter, starting at ground level, maximum depth
not exceeding 2.00m deep, average depth 1.50m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil for excavation in
rock
PROJECT : 3 STOREY SHOP OFFICE IN ALAM AVENUE, SELANGOR
BILL NO.1 : INFRASTRUCTURE WORKS (ALL PROVISIONAL)
RATE AMOUNT
(RM) (RM)
ITEM
REF.
DESCRIPTIONS UNIT QUANTITY
ELEMENT NO.2 : SEWERAGE WORKS (Cont'd)
Sewerage Pipe (Cont'd)
A.
M 1
B.
M 20
C.
M 2
D.
M 20
E.
ITEM
M 174
F.
M 172
G.
M 172
H.
M 1
J.
NO 3
K.
NO 1
TO COLLECTION RM
Extra over 45 degree bend for pipe fittings size 225mm
Diameter verified clay pipe
Extra over 90 degree bend for pipe fittings size 225mm
Diameter verified clay pipe
Allow for keeping surface of the site and the excavation free
of surface water
Verified clay pipe (VCP) 225mm Diameter laid in trench
including all necessary approved by S.O
20mm Crusher rock aggregrate 100mm Thick around pipe
Class 'B' bedding 300mm Thick selected compacted backfill
Extra over tee pipe fittings size 225mm Diameter verified
clay pipe
Extra over breaking up tarmacadam to receive pipes size
225mm Diameter, starting at ground level, maximum depth
not exceeding 4.00m deep, average depth 2.00m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil
Extra over excavating trenches to receive pipes size
225mm Diameter, starting at ground level, maximum depth
not exceeding 4.00m deep, average depth 2.25m deep,
including earthwork support , treating bottoms, filling in,
compaction and disposal of surplus spoil for excavation in
rock.
BQ 1/2
This bills of quantities shall be read in conjunction with
preambles and specifications
Excavating trenches next to existing building to receive
pipes size 225mm Diameter, starting at ground level,
maximum depth not exceeding 4.00m deep, average depth
2.00m deep, including earthwork support , treating bottoms,
filling in, compaction and disposal of surplus spoil
Extra over excavating trenches next to existing building to
receive pipes size 225mm Diameter, starting at ground
level, maximum depth not exceeding 4.00m deep, average
depth 2.00m deep, including earthwork support , treating
bottoms, filling in, compaction and disposal of surplus spoil
for excavation in rock.
PROJECT : 3 STOREY SHOP OFFICE IN ALAM AVENUE, SELANGOR
BILL NO.1 : INFRASTRUCTURE WORKS (ALL PROVISIONAL)
RATE AMOUNT
(RM) (RM)
ITEM
REF.
DESCRIPTIONS UNIT QUANTITY
ELEMENT NO.2 : SEWERAGE WORKS (Cont'd)
Sewerage Pipe (Cont'd)
TOTAL COLLECTION
BQ 1/1
BQ 1/2
TOTAL TO SUMMARY RM
BQ 1/3
This bills of quantities shall be read in conjunction with
preambles and specifications