BAJAUR AGENCY
1. RATIONALE
Technical & Financial Proposals are invited on Single Stage Two Envelopes Basis from the
under mentioned pre-qualified Consultancy Firms Notified by FATA SECRETARIAT vide
Notification No. FS/E/100-1/DS/SOL-Const/VOL-II/2908-19 Dated 07/12/2017.
1. BARG Engineering
2. Ultimate Engineering Consultants
2. NAME OF THE PROJECT
Design and Supervision of “Solarization of existing AHQ/THQ Hospital FATA A/FDWP and
solarization of 1 No water supply scheme under ADP 193/130322 (2017-18) in the following
region:
3. NAME OF CLIENT:
Note: Details of projects attached as annexure-1. (i.e: Nos of Schemes, and Estimated Cost).
5. VALIDITY
The proposal will remain valid for a period of 60 days from the last date of submission of
proposal.
6. SUBMITTAL
Consultant must submit the original, along with 1 copy of the technical & Financial proposal in
sealed envelope, by 12:00 hours, 8 May, 2018 at the following address:
Office of the
Executive Engineer
Building FATA Division Bajaur Agency,
FATA Ph: 0942-222215
List of staff along with CV’s on prescribed format as given in this RFP shall be provided for all
the key staff to be deployed on this project.
8. PROPOSAL FORMAT:
Technical proposal shall provide the following and any additional information:
I-From-1 A brief description of the Consultant’s organization (Profile).
Firm’s Tax Returns / Financial Statements for the last three Years.
I-Form-2 A list of projects completed or presently being under taken by the Firm and data
Sheets for Each Project.
I-Form-3 Consultants’ understanding of the objectives of the project, their approach
towards the assignment and a description of methodology that the consultants
propose to perform on the activities and completion of the assignment.
I-Form-4 Any comments or suggestions; The Consultant’s comments, if any,
I-Form-5 CVs of the proposed key professional staff. Key information should include
number of years with the firm, and degree of responsibility held in various
assignment.
I-Form-6 A Proposed work plan, illustrated with a bar chart of activities and graphics of the
critical path method (CPM) or Project Evaluation Review Techniques (PERT)
type.
I-Form-7 A schedule for compilation and submission of various types of reports.
I-Form-8 Staffing Schedule.
I-Form-9 The composition of the proposed staff team, the tasks which would be assigned to
each staff members and their positions.
Testing Equipment.
1. PV Analyzer = 3 Mark 30
2. Irradiance Meter = 1 Mark
3. Ultrasonic level meter= 01 Mark
(v) 4. Digital Clamp Meter = 01 Mark 10
5. GPS = 01 Mark
6. Ultrasonic Thickness Gauge = 01 Mark
7. Film/Coating Thickness Gauge = 01 Mark
8. Infrared Thermometer = 01 Mark
Tax Returns / Financial Statements –Last 3 years
(vi) 4
(1.33 marks for Each Year)
S. NO of Total
Man
N Description posts Man Qualification Experience Remarks
Months
o / Qty Months
A. Key Staff Years
Services to be
M.Sc.
Team provided for
Electrical/Electronic
1. Leader/Design 1 1 1 10 intermitted
with experience in
Engineer based for the
Solar Energy system.
project duration
Solar System
Design During Design
2. 1 2 2 5
Engineer Phase
Services to be
B.Sc
provided for
Project Electrical/Electronic
3. 1 6 6 3 intermitted
Engineers with experience in
based for the
Solar Energy system.
project duration
Sub Total Key Staff 9
Project
5. 1 No 8
office
Transportati
One vehicle on
6. on including 1 NOs 3
intermitted based
POL & Driver