REQUEST FOR PROPSAL (RFP)

FOR SOLAR CONSULTANTS

BAJAUR AGENCY

INFORMATION FOR THE CONSULTANTS

1. RATIONALE

Technical & Financial Proposals are invited on Single Stage Two Envelopes Basis from the
under mentioned pre-qualified Consultancy Firms Notified by FATA SECRETARIAT vide
Notification No. FS/E/100-1/DS/SOL-Const/VOL-II/2908-19 Dated 07/12/2017.

1. BARG Engineering
2. Ultimate Engineering Consultants
2. NAME OF THE PROJECT

Design and Supervision of “Solarization of existing AHQ/THQ Hospital FATA A/FDWP and
solarization of 1 No water supply scheme under ADP 193/130322 (2017-18) in the following
region:

PACKAGE: BAJAUR AGENCY

Numbers / Details of projects are attached as Annex -I.

3. NAME OF CLIENT:

Building FATA Division Bajaur

4. SCOPE OF WORK & TOR

Scope of work covers Design, Preparation of Bidding Documents, Preparation of BOQ,


Procurement of Contractor/Firms, Project/Bid Evaluation, Preparation of Detail Cost Estimate
and Supervision of the Project.

Estimates Cost: 28.449 Million

Note: Details of projects attached as annexure-1. (i.e: Nos of Schemes, and Estimated Cost).

5. VALIDITY

The proposal will remain valid for a period of 60 days from the last date of submission of
proposal.
6. SUBMITTAL

Consultant must submit the original, along with 1 copy of the technical & Financial proposal in
sealed envelope, by 12:00 hours, 8 May, 2018 at the following address:

Office of the
Executive Engineer
Building FATA Division Bajaur Agency,
FATA Ph: 0942-222215

The consultants are required to provide evidence/documentary proof of the credentials


mentioned in the profile/technical proposal.

7. LIST OF STAFF TO BE DEPLOYED ON THIS PROJECT

List of staff along with CV’s on prescribed format as given in this RFP shall be provided for all
the key staff to be deployed on this project.

8. PROPOSAL FORMAT:

Technical proposal shall provide the following and any additional information:
I-From-1 A brief description of the Consultant’s organization (Profile).
Firm’s Tax Returns / Financial Statements for the last three Years.
I-Form-2 A list of projects completed or presently being under taken by the Firm and data
Sheets for Each Project.
I-Form-3 Consultants’ understanding of the objectives of the project, their approach
towards the assignment and a description of methodology that the consultants
propose to perform on the activities and completion of the assignment.
I-Form-4 Any comments or suggestions; The Consultant’s comments, if any,
I-Form-5 CVs of the proposed key professional staff. Key information should include
number of years with the firm, and degree of responsibility held in various
assignment.
I-Form-6 A Proposed work plan, illustrated with a bar chart of activities and graphics of the
critical path method (CPM) or Project Evaluation Review Techniques (PERT)
type.
I-Form-7 A schedule for compilation and submission of various types of reports.
I-Form-8 Staffing Schedule.
I-Form-9 The composition of the proposed staff team, the tasks which would be assigned to
each staff members and their positions.

I-Form-10 Tools and Equipment Capabilities


9. CRITERIA FOR EVALUATION OF TECHNICAL PROPOSAL:

# PARAMETER marks TOTAL MARKS (100)

If “YES” the applicant will


be Eligible for further
Eligibility for Qualification:
Evaluation for qualification
A Consultancy Project Profile Code -1210 for Yes / No
(copy of valid PEC
Renewable Energy Sources and Systems certificate shall be
attached).

B. Experience and standing of the Firm


Relevant Projects Completed (Buildings and Solar
Home Systems):
Experience of Consultancy Firm is solar projects,
relevant to the assignment. Number of similar
Solar Projects Completed in the last Five years
(i) (LOA & Completion Certificates to be attached as 10
proof) (3 marks will be given for Each Project
Completed) (Value of Each Consultancy project
should be equal or more than One (1) million, For
Consultancy Projects of value more than Five (5)
Million double marks will be given).
Relevant Projects In-Hand (Buildings and Solar
Home Systems):
Experience of Solar Projects In-hand relevant to
the assignment.
Number of similar Solar Projects In-Hand (Work
(ii) orders/ LOA Certificates to be attached as proof), 15
70
(3 Mark will be given for each project In-hand)
(Value of Each Consultancy project should be
equal or more than One (1) million, For
Consultancy Projects of value more than Five (5)
Million double marks will be given).
GENERAL SOLAR Projects:
Experience of General Solar Projects In-hand or
Completed (i.e: Solar Street Lights, Solar Pumping
Systems other projects etc).
Number of projects (Work orders/ LOA
(iii) Certificates to be attached as proof), 10
(3 Mark will be given for each project) (Value of
Each Consultancy project should be equal or more
than One (1) million, For Consultancy Projects of
value more than Five (5) Million Double marks
will be given).
Academic qualification of personnel to be
deployed (80% Bachelor Degree; 20% Masters).

(iii) Engineers Required. 20


Electrical/Electronics
1. Team leader/Design Engineer (1) = 12Marks
2. Solar system design engineer (1) = 4 Marks
3. Project Engineer (1) = 4 Marks
Experience of Key staff, to be deployed;
(3-10 years’ experience Required)
(iv) Experience in similar Solar projects 15
1. Team Leader (1) = 10 Years
2. Solar system design engineer (1) = 5 Years
3. Project Engineers (1) = 3 Years
C Registration, Approach & Methodology

(i) Understanding of Objectives 4

(ii) Proposal Presentation 4

(iii) Quality of Methodology 8

(iv) Work Plan

Testing Equipment.
1. PV Analyzer = 3 Mark 30
2. Irradiance Meter = 1 Mark
3. Ultrasonic level meter= 01 Mark
(v) 4. Digital Clamp Meter = 01 Mark 10
5. GPS = 01 Mark
6. Ultrasonic Thickness Gauge = 01 Mark
7. Film/Coating Thickness Gauge = 01 Mark
8. Infrared Thermometer = 01 Mark
Tax Returns / Financial Statements –Last 3 years
(vi) 4
(1.33 marks for Each Year)
S. NO of Total
Man
N Description posts Man Qualification Experience Remarks
Months
o / Qty Months
A. Key Staff Years
Services to be
M.Sc.
Team provided for
Electrical/Electronic
1. Leader/Design 1 1 1 10 intermitted
with experience in
Engineer based for the
Solar Energy system.
project duration
Solar System
Design During Design
2. 1 2 2 5
Engineer Phase

Services to be
B.Sc
provided for
Project Electrical/Electronic
3. 1 6 6 3 intermitted
Engineers with experience in
based for the
Solar Energy system.
project duration
Sub Total Key Staff 9

A Non Key Staff


S. NO / Total Relevant
Description Months Qualification
No Qty Months Experience
Services to be
provided for
DAE
intermitted
4. Sub Engineer 1 3 3 Electrical/Civil/Electr 3
based for the
onics
project
duration
two weeks per
Office BSCS/ BSIT
5 1 3 3 month
Assistant
Sub Total
Non-Key 6
Staff
Total Man
15
Months
B. Logistics
S.
Description Qty Unit Months Total Months Remarks
No

Project
5. 1 No 8
office

Transportati
One vehicle on
6. on including 1 NOs 3
intermitted based
POL & Driver

1. Minimum technical qualifying score required is 70% (70 Marks)


2. Formula for determining the financial score is:
Financial Score of Firm Fs = 100xfm/f; where,
- fm is the lowest price, and
- f is the price of the proposal under consideration
3. The weight age assigned to the technical and financial proposals are:
Technical: 80%
Financial: 20%
4. Expected date of commencement of the assignment/consulting services is May 2018.

5. Expected date of completion of assignment/ consultancy services is 6 Months.