Cable12 -2.242 -1.651 2.244 1.657 1.9 5.6 98.5 98.7 0.17
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating Cable13 -2.242
load of a bus exceeds the bus marginal limit ( 95.0% of -1.651
the Continuous2.244 1.657
Ampere rating). 1.9 5.6 98.5 98.7 0.17
Cable14 -28.303 -11.882 28.313 11.955 10.0 72.4 98.7 98.8 0.12
Cable15 -28.303 -11.882 28.313 11.955 10.0 72.4 98.7 98.8 0.12
T14 -89.141 -37.386 89.197 40.160 55.5 2774.4 98.8 100.0 1.18
2254.3 47700.9
ETAP
Project: Page: 54
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal
Marginal Report
Alert Summary Report
Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Critical Report
Marginal Report
ETAP
Project: Page: 6
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal
MW Mvar MVA % PF