Cable12 -1.893 -1.432 1.894 1.436 1.4 4.1 98.6 98.7 0.15
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating Cable13 -1.893
load of a bus exceeds the bus marginal limit ( 95.0% of -1.432
the Continuous1.894 1.436
Ampere rating). 1.4 4.1 98.6 98.7 0.15
Cable14 -27.962 -11.664 27.971 11.735 9.7 70.5 98.7 98.8 0.12
Cable15 -27.962 -11.664 27.971 11.735 9.7 70.5 98.7 98.8 0.12
T14 -88.468 -36.950 88.522 39.679 54.6 2728.5 98.8 100.0 1.17
2207.9 47035.7
ETAP
Project: Page: 54
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal
Marginal Report
Alert Summary Report
Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Critical Report
Marginal Report
ETAP
Project: Page: 6
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal
MW Mvar MVA % PF
Number of Iterations: 3