ETAP

Project: Page: 321


12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: HASNAN HABIBI / D400160049 Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06
6 Config.: Normal

BusLoading
Loading
Branch
Branch SummaryReport
Losses Summary
Summary Report
Report

Directly Connected Load Total Bus Load


Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
Transformer % Drop
Bus CKT ID / Branch MW
Constant kVA
MvarCable &MW
Constant
Reactor Z
Mvar
Constant
kW
I
kvar
Generic
From To in Vmag Percent
ID kV Rated Amp MW Mvar
Ampacity MW
Loading Mvar MW
CapabilityMvar Loading
MW (input)Mvar Loading
MVA (output)
% PF Amp Loading
T1 244.049 127.778 -244.049 -111.841 0.2 15936.3 100.0 97.5 2.55
ID 500.000 Type (Amp) Amp (MVA)
Bus1 0 0 0 0% 0 0 MVA 0 % 0 MVA
550.952 %
88.6 636.2
T6 244.049 127.778 -244.049 -111.841 0.2 15936.3 100.0 97.5 2.55
Bus3 T1 150.000 Transformer 0 0 623.018 260.893 0500.000 0 275.476 0 55.1 0 268.455
675.438 53.7
92.2 2667.8
Cable1 -62.304 -17.751 62.844 20.416 539.9 2665.4 97.5 99.4 1.95
Bus7 T5 150.000 Transformer 0 0 0 0 0500.000 0 68.396 0 13.7 0 67.984
67.984 13.6
94.6 263.3
Cable2 -72.617 -19.459 73.226 22.468 609.5 3009.1 97.5 99.3 1.84
Bus8 T6 150.000 Transformer 0 0 9.858 4.437 0500.000 0 275.476 0 55.1 0 189.654
268.455 96.5
53.7 735.2
Cable3 1.477 1.600 -1.476 -1.597 0.6 2.7 99.4 99.3 0.11
Bus9 T7 150.000 Transformer 0 0 0 0 0500.000 0 0 0 0 0.0 0.0
T5 -64.321 -22.016 64.347 23.185 26.0 1169.2 99.4 100.0 0.60
Bus11 T8 150.000 Transformer 0 0 403.386 56.301 0500.000 0 0 0 595.257 98.4 2291.1
Cable4 -90.791 -23.994 91.025 25.692 234.0 1697.4 99.3 100.0 0.71
Bus12 T9 150.000 Transformer 0 0 0 0 0500.000 0 0 0 0 0.0 0.0
Cable5 -90.791 -23.994 91.025 25.692 234.0 1697.4 99.3 100.0 0.71
Bus13 150.000 0 0 0 0 0 0 0 0 0 0.0 0.0
T10 Transformer 500.000
Cable6 49.986 11.340 -49.754 -10.659 232.0 681.6 99.3 98.6 0.72
Bus14 150.000 0 0 47.603 47.604 0 0 0 0 120.553 82.5 470.8
T11 Transformer 500.000 47.414 9.5 46.762 9.4
Bus18 Cable7 150.000 49.986 0 11.340
0 -49.754
0 0-10.659 0 232.0 0 681.6 0 99.3 0 98.6
46.762 0.72
0.0 182.5
T12 Transformer 500.000
Bus20 T7 500.000 0.000 0 0.000
0 0.000
0 0 0.000 0 0 0 99.3 0 99.3
47.414 0.00
0.0 54.7
T14 Transformer 500.000 97.008 19.4 95.874 19.2
Bus21 T8 500.000 0.000 0 0.000
0 0.000
0 0 0.000 0 0 0 99.3 0 99.3 0 0.00
0.0 0.0
* Indicates a branch with operating load exceeding the branch capability.
Bus22 T9 150.000 0.000 0 0.000
0 0.000
55.669 23.3100.000 0 0 0 99.3 0 99.3
60.352 0.00
92.2 235.7
Bus23 Cable8 150.000 0.000 0 0
0.000 52.134
0.000 20.4570.000 0 0 0 98.6 0 60.594
98.6 92.3
0.00 236.3
Bus24 Cable9 150.000 0.023 0 0
-46.733 32.525
-0.013 13.480
46.762 0 9.6 0 28.6 0 98.6 0 95.874
98.6 92.3
0.06 373.4
Bus25 Cable10 500.000 51.867 0 0
20.441 0
-51.867 0-20.440 0 0.1 0 0.4 0 98.6 0 97.008
98.6 91.3
0.00 112.0
Bus26 Cable11 150.000 0.016 0 0
0.006 0
-0.016 0 -0.006 0 0.0 0 0.0 0 98.6 0 68.396
98.6 94.1
0.00 263.3
Bus27 150.000 0 0 0 0 0 0 0 0 0 0.0 0.0
T12 0.000 0.000 0.000 0.000 98.6 98.6 0.00
Bus28 150.000 0 0 0 0 0 0 0 0 0 0.0 0.0
T11 0.013 -46.762 0.000 47.414 13.0 651.8 98.6 100.0 1.37

Cable12 -1.893 -1.432 1.894 1.436 1.4 4.1 98.6 98.7 0.15
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating Cable13 -1.893
load of a bus exceeds the bus marginal limit ( 95.0% of -1.432
the Continuous1.894 1.436
Ampere rating). 1.4 4.1 98.6 98.7 0.15

Cable14 -27.962 -11.664 27.971 11.735 9.7 70.5 98.7 98.8 0.12

Cable15 -27.962 -11.664 27.971 11.735 9.7 70.5 98.7 98.8 0.12

T14 -88.468 -36.950 88.522 39.679 54.6 2728.5 98.8 100.0 1.17

T10 0.000 0.000 0.000 0.000 98.6 98.6

2207.9 47035.7
ETAP
Project: Page: 54
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal

Marginal Report
Alert Summary Report
Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus3 Bus Under Voltage % AlertkVSettings 146.177


150.000 97.5 3-Phase

Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Cable16 Cable Overload 626.500 Amp 2429.231 387.7 3-Phase

Gen1 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen1 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen2 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen2 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen3 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen3 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen4 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen4 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen6 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen7 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen7 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Marginal Report
ETAP
Project: Page: 6
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 1226.402 426.104 1298.317 94.46 Lagging

Source (Non-Swing Buses): 0.000 47.414 47.414 0.00 Leading

Total Demand: 1226.402 473.518 1314.641 93.29 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 1224.194 426.482 1296.355 94.43 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 2.208 47.036

System Mismatch: 0.000 0.000

Number of Iterations: 3