You are on page 1of 3

ETAP

Project: Page: 321


12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: AGE SALMAN / D400160057 Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal

BusLoading
Loading
Branch
Branch SummaryReport
Losses Summary
Summary Report
Report

Directly Connected Load Total Bus Load


Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
Transformer % Drop
Bus CKT ID / Branch MW
Constant kVA
MvarCable &MW
Constant
Reactor Z
Mvar
Constant
kW
I
kvar
Generic
From To in Vmag Percent
ID kV Rated Amp MW Mvar
Ampacity MW
Loading Mvar MW
CapabilityMvar Loading
MW (input)Mvar Loading
MVA (output)
% PF Amp Loading
T1 246.896 131.333 -246.896 -114.910 0.2 16423.3 100.0 97.4 2.62
ID 500.000 Type (Amp) Amp (MVA)
Bus1 0 0 0 0% 0 0 MVA 0 % 0 MVA
559.307 %
88.3 645.8
T6 246.896 131.333 -246.896 -114.910 0.2 16423.3 100.0 97.4 2.62
Bus3 T1 150.000 Transformer 0 0 629.692 268.098 0500.000 0 279.653 0 55.9 0 272.327
684.389 54.5
92.0 2705.1
Cable1 -62.970 -18.344 63.525 21.080 554.2 2736.0 97.4 99.4 1.99
Bus7 T5 150.000 Transformer 0 0 0 0 0500.000 0 69.758 0 14.0 0 69.322
69.322 13.9
94.4 268.5
Cable2 -72.930 -19.935 73.547 22.983 617.4 3047.8 97.4 99.2 1.87
Bus8 T6 150.000 Transformer 0 0 9.850 4.433 0500.000 0 279.653 0 55.9 0 196.464
272.327 96.3
54.5 761.9
Cable3 1.903 1.826 -1.903 -1.822 0.8 4.0 99.4 99.2 0.13
Bus9 T7 150.000 Transformer 0 0 0 0 0500.000 0 0 0 0 0.0 0.0
T5 -65.428 -22.906 65.455 24.122 27.0 1216.3 99.4 100.0 0.63
Bus11 T8 150.000 Transformer 0 0 403.386 56.301 0500.000 0 0 0 601.490 98.3 2315.1
Cable4 -93.601 -25.723 93.851 27.538 250.3 1815.3 99.2 100.0 0.75
Bus12 T9 150.000 Transformer 0 0 0 0 0500.000 0 0 0 0 0.0 0.0
Cable5 -93.601 -25.723 93.851 27.538 250.3 1815.3 99.2 100.0 0.75
Bus13 150.000 0 0 0 0 0 0 0 0 0 0.0 0.0
T10 Transformer 500.000
Cable6 52.854 12.926 -52.592 -12.157 261.7 768.8 99.2 98.5 0.79
Bus14 150.000 0 0 55.255 55.256 0 0 0 0 128.885 81.6 503.9
T11 Transformer 500.000 50.954 10.2 50.201 10.0
Bus18 Cable7 150.000 52.854 0 12.926
0 -52.592
0 0-12.157 0 261.7 0 768.8 0 99.2 0 98.5
50.201 0.79
0.0 196.1
T12 Transformer 500.000
Bus20 T7 500.000 0.000 0 0.000
0 0.000
0 0 0.000 0 0 0 99.2 0 99.2
50.954 0.00
0.0 58.8
T14 Transformer 500.000 99.174 19.8 97.978 19.6
Bus21 T8 500.000 0.000 0 0.000
0 0.000
0 0 0.000 0 0 0 99.2 0 99.2 0 0.00
0.0 0.0
* Indicates a branch with operating load exceeding the branch capability.
Bus22 T9 150.000 0.000 0 0.000
0 0.000
55.548 23.2600.000 0 0 0 99.2 0 99.2
60.221 0.00
92.2 235.4
Bus23 Cable8 150.000 0.000 0 0
0.000 52.090
0.000 20.4390.000 0 0 0 98.5 0 62.719
98.5 92.1
0.00 244.7
Bus24 Cable9 150.000 0.026 0 0
-50.168 32.501
-0.015 13.470
50.201 0 11.1 0 33.0 0 98.5 0 97.978
98.5 92.1
0.06 381.7
Bus25 Cable10 500.000 49.888 0 0
19.221 0
-49.888 0-19.220 0 0.1 0 0.3 0 98.5 0 99.174
98.5 91.1
0.00 114.5
Bus26 Cable11 150.000 0.015 0 0
0.006 0
-0.015 0 -0.006 0 0.0 0 0.0 0 98.5 0 69.758
98.5 93.8
0.00 268.5
Bus27 150.000 0 0 0 0 0 0 0 0 0 0.0 0.0
T12 0.000 0.000 0.000 0.000 98.5 98.5 0.00
Bus28 150.000 0 0 0 0 0 0 0 0 0 0.0 0.0
T11 0.015 -50.201 0.000 50.954 15.1 752.8 98.5 100.0 1.48

Cable12 -2.822 -2.017 2.825 2.025 3.0 8.8 98.5 98.7 0.21
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating Cable13 -2.822
load of a bus exceeds the bus marginal limit ( 95.0% of -2.017
the Continuous2.825 2.025
Ampere rating). 3.0 8.8 98.5 98.7 0.21

Cable14 -28.870 -12.245 28.880 12.321 10.4 75.6 98.7 98.8 0.12

Cable15 -28.870 -12.245 28.880 12.321 10.4 75.6 98.7 98.8 0.12

T14 -90.262 -38.112 90.319 40.963 57.0 2851.7 98.8 100.0 1.21

T10 0.000 0.000 0.000 0.000 98.5 98.5

2333.7 48825.3
ETAP
Project: Page: 54
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal

Marginal Report
Alert Summary Report
Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus3 Bus Under Voltage % AlertkVSettings 146.070


150.000 97.4 3-Phase

Gen6 Generator Over Excited Critical


53.086 Mvar Marginal
50.954 96.0 3-Phase
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Cable16 Cable Overload 626.500 Amp 2427.452 387.5 3-Phase

Gen1 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen1 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen2 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen2 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen3 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen3 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen4 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen4 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Gen6 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen7 Generator Under Power 0.000 MW 0.000 0.0 3-Phase

Gen7 Generator Under Excited 0.000 Mvar 0.000 0.0 3-Phase

Marginal Report
ETAP
Project: Page: 6
12.6.0H
Location: Date: 01-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: TUGAS ETAP 06 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 1240.655 439.128 1316.077 94.27 Lagging

Source (Non-Swing Buses): 0.000 50.954 50.954 0.00 Lagging

Total Demand: 1240.655 490.082 1333.943 93.01 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 1238.321 441.257 1314.590 94.20 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 2.334 48.825

System Mismatch: 0.000 0.000

Number of Iterations: 3