Concrete Curing Log: Project Name: Fadhili Industrial Support Facilities

This concrete curing log documents the curing of an uplift test pile for the first stage of construction of the HA Tower at the Fadhili Industrial Support Facilities project from May 21 to May 29, 2017. The log tracks whether the concrete was covered by burlap at various times over the 7 day curing period and notes that curing was witnessed on the first 4 days at 9:00 AM and 2:00 PM.

Uploaded by

razi khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
555 views1 page

Concrete Curing Log: Project Name: Fadhili Industrial Support Facilities

This concrete curing log documents the curing of an uplift test pile for the first stage of construction of the HA Tower at the Fadhili Industrial Support Facilities project from May 21 to May 29, 2017. The log tracks whether the concrete was covered by burlap at various times over the 7 day curing period and notes that curing was witnessed on the first 4 days at 9:00 AM and 2:00 PM.

Uploaded by

razi khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

PROJECT NAME: FADHILI INDUSTRIAL

SUPPORT FACILITIES

CONCRETE CURING LOG


Date of DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 DAY 7
Pouring Start Date of Finish Date of Covered by
SN LOCATIONS Curing Curing Burlap?
Concrete 9:00AM 2:00PM 9:00AM 2:00PM 9:00AM 2:00PM 9:00AM 2:00PM 9:00AM 2:00PM 9:00AM 2:00PM 9:00AM 2:00PM

Uplift Test Pile - HA Tower


1 Type(1st Stage) 21.05.2017 22.05.2017 29.05.2017 YES WITNESSED WITNESSED WITNESSED WITNESSED

Page 1 of 1