You are on page 1of 5

TITLE OF THE PROJECT

VISVESVARAYA TECHNOLOGICAL UNIVERSITY


BELGAVI, KARNATAKA

“TITLE OF THE PROJECT”


Phase I Project Report
Submitted in partial fulfilment for the award of degree of
Bachelor of Engineering
in

MECHANICAL ENGINEERING
By

NAME1 (USN)
NAME2 (USN)
NAME3 (USN)
NAME4 (USN)

Under the guidance of

Internal External ( if applicable)


Guide Name Guide Name
Designation Designation
NIEIT, Mysuru-18 Affiliation

DEPARTMENT OF MECHANICAL ENGINEERING


NIE INSTITUTE OF TECHNOLOGY
MYSURU-570018
Dept. of -----------, NIEIT, Mysore-18 Page 3
TITLE OF THE PROJECT

2018-2019

NIE INSTITUTE OF TECHNOLOGY


#50(Part), Hootagalli Industrial area, Koorgalli Village
Mysuru-18

DEPARTMENT MECHANICAL ENGINEERING

CERTIFICATE

Certified that the project work entitled ………………………………………………... carried


out by Mr./Ms. ………………………….……………….., USN…………………..………, a
bonafide student of …………………………………….in partial fulfillment for the award of
Bachelor of Engineering in ……………………………...………………………….………
of the Visvesvaraya Technological University, Belgaum during the year ……………………...
It is certified that all corrections/suggestions indicated for Internal Assessment have been
incorporated in the Report deposited in the departmental library. The project report has been
approved as it satisfies the academic requirements in respect of Project work prescribed for
the said Degree.

Name & Signature of the Guide Name Signature of the HOD Signature of the Principal

External Viva

Name of the examiners Signature with date

1.

2.

Dept. of -----------, NIEIT, Mysore-18 Page 4


TITLE OF THE PROJECT

UNDERTAKING

I, ___________, HEREBY UNDERTAKE THAT THE PROJECT WORK ENTITLED

“__________________________________________” IS CARRIED OUT BY ME

INDEPENDENTLY UNDER THE GUIDANCE OF ___________________, _________,

DEPARTMENT OF -----------------------------------------------, NIEIT, M YSURU-18, IN PARTIAL

FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF BACHELOR OF ENGINEERING

IN ------------------------------------------------ BY THE VISVESVARAYA TECHNOLOGICAL

UNIVERSITY, BELGAUM. THE PROJECT HAS BEEN MY ORIGINAL WORK AND HAS NOT FORMED

THE BASIS FOR THE AWARD OF ANY DEGREE , ASSOCIATE SHIP, FELLOWSHIP OR ANY OTHER

SIMILAR TITLES.

SIGNATURE OF STUDENT

Dept. of -----------, NIEIT, Mysore-18 Page 5


TITLE OF THE PROJECT

GUIDELINES FOR THE PREPARATION OF B.E./B. Tech. PROJECT REPORTS

CHAPTER 1 INTRODUCTION must include

1. Introduction
2. Scope of proposed work
3. Importance and relation to previous work and the present developments
4. Motivation behind the proposed work
5. Organization of the Report

CHAPTER 2 SYSTEM ANALYSIS must include

1. Introduction
2. Problem Definition/Framework
3. Proposed Methodology/Design Methodology(Block Diagrams, Theoretical
Derivations, Equations....)
4. Method of Analysis
**Hardware projects must include: the component layout, complete circuit with the
component list containing the name of the component, numbers used, etc.
5. Conclusion

CHAPTER 3 SYSTEM DESIGN must include

1. Introduction
2. Detailed Design
3. Conclusions

CHAPTER 4 SYSTEM DESIGN IMPLEMENTATION must include


1. Introduction
2. Implementation of Proposed Methodology
3. Developed Modules/Algorithms/Hardware tools/Software tools and its application.
4. Conclusions

Chapter 5 TESTING and RESULTS must include


1. Case Studies-Test Cases
2. Testing Methodologies
3. Results and Discussions for Each Test Case.
4. Tabulation of Results
5. Conclusions

CONCLUSION WITH FUTURE ENHANCEMENTS

BIBLIOGRAPHY
Relevant to project work comprising of

1. Technical paper References


2. Web references
3. Books references

Dept. of -----------, NIEIT, Mysore-18 Page 6


TITLE OF THE PROJECT

APPENDIX (if any)


Relevant to project work comprising of

1. Abbreviations (if any)


2. Hardware Component Data sheets ….(if any)
3. Data sheets of Test Cases etc...(if any)

PROJECT EXHIBITION & POSTER PRESENTATION


1. Project Carried out must be exhibited with all hardware and software
2. Project must be presented using Posters during exhibition.
(Separate Guidelines will be intimated later)

Dept. of -----------, NIEIT, Mysore-18 Page 7

You might also like