KY THUAT
QUI TRINH
ff. No.:
GIAO NHAN PHU‘ONG TIEN Le sno
HU’ HONG KHI DU’A VAO
fersion: 1.0
WORKSHOP
f
Nguyén Céng Thanh
Reviewed by
Le Tevong Long
Le Truomg Long
10 REVISION HISTORY/ LICH SU HIRU CHINE:
10 | 19-Jan-2017 Pht he
anh Le Truong Long,
Te Truong Long | Le Truong Long
eaponaepersn
Mobi Eeupmen Syperior
Pega TTP
Version Noo £0
‘Efetve Date 19 fn =2007
Revie Date 19-Jan-2019,
“Uncontrolled document when printed, check SPCT Eng. Dept. for latest version ifavailable.”QU! TRINH Ee Now
(@ SPCT. | Giao NHAN PHUONG TIEN EPctErasonioes
Kenuat HU’ HONG KHI DUA VAO :
WORKSHOP
20 MuUCBICH
> Tudin thi theo DPW Engineering Policy va SPCT Engineering Management System.
> Gitip nhimg ngudi lién quan dén cong vide nay ndm duge cde bude thyc hign khi c6
phuong tign hu héng cdn sira chita tai workshop.
3.0 PHAM VI AP DUNG
> Trién khai dén tit cd moi nguéi thyc hign cong vige may.
4.0 TATLIRU THAM KHAO,
5.0 THUATNGU VA DINH NGHIA
Operators | Vn bin vgn
‘Site Manager / Site | Gidm sat céng trrong
Supervisor
‘Shift Engineering(sy | at vid ‘a that
Toctareiteg | Trye ca Ky thus Ky thug vign/ Nha thd
Contractor
“Mobile Equipment | Gidm sét kj thuét cia nhém thiét bj di dong,
Supervisor
60 PROCEDURE & REQUIREMENTS/ QUI TRINH VA YEU CAU
% QUITRINE
‘Truée khi van hanh
thidt bi Operators
‘Kiém tra ting thé tinh trang thigt bi
theo miu: SPCI/Eng/F043 (for Operators
Tractor-Trailer)
apo pra Foge Top 10 (ire Date 19—Ton 2007
Mabie Bupoce Superson Verio Nos LO Revo Dates 19- Ja 2019
“Uncontrolled document when printed, check SPCT Eng. Dept for latest version if available.”(@ SPCT | giao NHAN PHUONG TIEN
PHONG
KY THUAT
QUI TRINH
HU’ HONG KHI BU’A VAO
WORKSHOP
ket No.
PCTIEng/SOP/008
fersion: 1.0
‘Thong béo cho site
manager hoic site
supervisor
¥
Tao yéu cdu kiém tra sira chfta theo mau:
SPCT/Eng/F043
+
‘Thong béo trye tip cho BG phan K¥ thuat
(bode théng qua WT)
‘Tiép nhén thiét bj hu hong
tai workshop
KY ahgn ban giao thiét bi theo n
SPCT/Eng/F097 (dinh kem)
aie
Tién hamh cong téc
‘bao tri sita chia
Operators
Operator/ site
Manager /Site
Supervisor
Operator/ site
Manager / Site
Supervisor
“Mobile Equipment |
Supervisor/
Technician(s)/ Shift
Engineering(s)
Mobile Equipment
Supervisor/
Technician(s}/ Shift
Engineering(s}
Mobile Equipment
Supervisor/
Techician(s)/ Shift
Engineering(s)
Mobile Equipment
Supervisor/
Technician(s)/ shift
Engineering(s)
Ky ban giao thiét bj sau sita
cchita theo Theo mi
sPCT/Ena/F097 (dinb kem)
: __ Ket thie ie
Mobile Equipment
Supervisor/
Technicianis)/ Shift
Engineerinals)
Shift Engineering(s\/
Technician(s\/
Taipan pr
Mobis Equipment Superior
Fags STO “ite Dat 19 Ta 7007
Version Wo: 10 Review Dates 18-Jon- 2019,
“Uncontrolled document when printed, check SPCT Eng. Dept. for atest version if available