1.1. INTRODUCTION
The primary purpose of a dam may be defined as to provide for the safe retention and
storage of water. The structural design life for dams depends upon the reservoir siltation.
a) Irrigation,
b) Water supply,
c) Hydroelectric power generation,
d) Flood control,
e) Recreation.
Dams are numerous types. An initial broad classification into two generic groups can be
made in terms of the principal construction material employed.
b) Concrete Dams: Constructed of mass concrete. Face slopes are dissimilar, generally
steep downstream and vertical upstream, and dams have relatively slender profiles
dependent upon the type. The concrete dams can be considered to include also older
dams of appropriate structural type constructed in masonry.
Embankment dams are numerically dominant for technical and economic reasons, and
account for over 85% of all dams built. The embankment utilized is locally available and
untreated material. As the embankment dam evolved it has proved to be increasingly
adaptable to a wide range of site circumstances. In contrast, concrete dams are more
demanding in relation to foundation conditions. They also proved to be dependent upon
relatively advanced and expensive construction skills.
1 A.Bulu
Possible time span
(years)
strategic planning:
project initiation
3 - 20
mapping, surveys
field reconnaissance
data collection
2-4
confirmation of
dam type
1-2
dam design
Foundation 2-6
construction feedback
Rivers are sources of energy (hydroelectric power) and water supply for municipalities
and agriculture. Many rivers also serve as transportation arteries and are sources of
recreation. Flooded rivers cause property damage and loss of life. Rivers are also often
used for sewage disposal. We design and construct water resources projects to control the
rivers to our advantage as our population increases and demand for food, water, power,
2 A.Bulu
recreation, and land grows. Careful planning should be done to achieve optimum
utilization of river basins as whole, as well as specific projects within them.
A satisfactory site for a reservoir must fulfill certain functional and technical
requirements. The balance between its natural physical characteristics and the purpose of
the reservoir governs functional suitability of a site. Catchment hydrology, available head
and storage volume must be matched to operational parameters set by the nature and
scale of the project served.
Technical suitability is dictated by the presence of a site (or sites) for a dam, the
availability of materials suitable for dam construction, and by the integrity of the
reservoir basin with respect to leakage. The hydrological and geological or geotechnical
characteristics of catcment and site are the principal determinants establishing the
technical suitability of a reservoir site. To these must be added an assessment of the
anticipated environmental consequences of construction and operation of the dam. The
principal stages involved in site appraisal, and leading to the selection of the optimum
dam site and type of dam are as indicated in Fig. (1.1).
In the preliminary study phase, which may extend over a substantial period of time, the
principal objective is to collect adequate topographical, geological, hydrological survey
data. Large-scale maps and any records already available provide the starting point, but
much more detailed surveys will inevitably be required. Aerial reconnaissance,
employing modern sensors in addition to the traditional photogrammetric survey
techniques, has a particular to play in the preparation of accurate and large-scale site
plans (e.g. 1/5000 and larger). In the hands of a skilled interpreter, aerial surveys also
provide valuable information on geology, on possible dam sites, and on the likely
availability of construction materials. Hydrological surveys are directed to determining
rainfall and runoff characteristics, and assessing historical evidence of floods.
3 A.Bulu
1.3.2. Feasibility Study
The feasibility report prepared at the conclusion of the preliminary study phase assembles
and interprets all available information, data, and records, and makes initial
recommendations with respect to the technical and economic viability of the reservoir.
Options with regard to the location, height, and type of dam are proposed, and
comparisons drawn in terms of estimated costs and construction times. On the strength of
this report a decision can be made with respect to further detailed investigations required
to confirm the suitability of the reservoir basin and preferred dam site (or sites).
In the final phase of planning, detailed designs are made and plans and specifications are
developed. Further investigations of the reservoir basin are principally directed to
conforming its integrity with respect to water retention. A thorough geological
assessment is necessary for this purpose, particularly in karstic and similarly difficult
formations and in areas with a history of mining activity. The availability of construction
materials, e.g. suitable fills, sources of aggregate etc., is also assessed in considerable
depth. Hydrological studies are continued as necessary to confirm and extend the results
of the initial investigations.
Whether it be for municipal water supply, irrigation, or hydropower several items must
be considered in the planning and design of a dam and reservoir.
• Hydrological data: Data of the stream that the dam is to be built on are analyzed to
determine flood and drought flows and to determine the required capacity and operating
procedure for the reservoir. Also, the required spillway capacity can be determined from
the hydrological data.
• Geological data: On-site inspection, geological mapping the drilling of exploratory
holes and collection of core-sample data by geologists are usually required. These data
reveal the structural ability of the foundation material to withstand the loads that may act
on it and indicate the leakage and erosion problems that may be encountered. The data
also reveal the availability of the fill and aggregate for the construction of the dam.
• Reservoir data: A complete assessment of the area to be inundated by the reservoir
must be made. This includes topographic maps, land ownership, land classification, and
location of roads and public utilities. These data are used to estimate the cost of land
acquisition and relocation of roads and utilities.
4 A.Bulu
1.5. TYPES OF DAMS
Dams are classified according to the material (earth, rock, concrete) from which they are
built and according to the configuration and the way in which they resist the forces
imposed on them.
Thus a gravity dam is one in which gravitational forces (such as the weight of the dam
itself) are great enough to resist the overturning moment and sliding force of the
hydrostatic forces imposed on it (Fig. 1.2.c)
Another type of gravity dam is the buttress dam, in which reinforced concrete slabs
constitute the face of the dam and are supported by vertical buttresses at intervals of 15 to
30 m. In contrast, an arch dam is designed to transfer the imposed loads to adjacent rock
walls on either side of the canyon it is located. Both earthfill and rockfill dams are special
types of gravity dams.
The optimum dam type for a specific site is governed by technical validity and by cost. In
some situations the options are very limited on technical grounds, and the selection of
type is correspondingly straightforward. In many situations options may exist between
types of comparable technical validity, and the decision will rest upon the relative
economics for that site.
5 A.Bulu
Four considerations of cardinal importance are detailed below:
a) Hydraulic gradient: The nominal value of hydraulic gradient for seepage under a
dam varies by at least one order of magnitude according to type.
b) Foundation stress: Nominal stresses transmitted to the foundation vary greatly with
dam type.
c) Foundation deformability: Certain types of dam are better able to accommodate
significant foundation deformation without serious damage.
d) Foundation excavation: Economic considerations dictate that the excavation volume
should be minimized.
Notional stress values for 100 m high dams of different types are shown in Table (1.1).
The situation of a wide valley with deep alluvial deposits is illustrated in Fig. (1.4.a).
Considerations of foundation deformation and the depth of excavation required favor an
earthfill embankment.
The availability of competent rock at shallow depth as shown in Fig. (1.4.b), favors either
a rockfill embankment or, secondly, a concrete gravity or buttress dam. Availability of
rockfill, and thus cost, would dictate the final choice.
A narrow and steep-sided valley in sound rock, as illustrated in Fig. (1.4.c) is suited to an
arch dam. Economic considerations may favor the rockfill embankment.
The situation shown in Fig. (1.4.d), with deep overburden under one half of the site,
could well suggest the composite solution shown. An earthfill embankment is constructed
where settlement may be significant, the spillway being conveniently accommodated on a
concrete gravity section where the required excavation depth is reasonable.
6 A.Bulu
Figure 1.4.a. Wide valley with deep burden: morainic or alluvial deposits over 5-10 m:
favors earth fill embankment
Figure 1.4.b. Valley with little overburden: Figure 1.4.c. Narrow valley steep
suitable for embankment, gravity, or buttress sides, little overburden: suitable
dam for arch, or rockfill embankment
dam
The structural integrity of a dam must be maintained across the range of circumstances or
events likely to arise in service. In all foreseeable circumstances the stability of the dam
and foundation must be assured, with stresses contained at acceptable levels and
watertight integrity essentially unimpaired.
a) Primary loads are identified as those of major importance to all dams, irrespective of
type, e.g. water and related seepage loads, and self-weight loads.
7 A.Bulu
b) Secondary loads are universally applicable although of lesser magnitude (e.g. silt
load) or, alternatively, are of major importance only to certain types of dams (e.g. thermal
effects within concrete dams).
c) Exceptional loads are so designated on the basis of limited general applicability or
having a low probability of occurrence (e.g. tectonic effects, or the inertia loads
associated with seismic activity).
The primary loads and the more important secondary and exceptional sources of loading
are identified schematically on Fig. (1.5) on a gravity dam.
a) Water load. Hydrostatic distribution of pressure with horizontal resultant force P1.
(Note that a vertical component of load will also in the case of an inclined upstream face
and that equivalent tailwater loads may operate on the downstream face).
b) Self-weight load. Determined with respect to an appropriate unit weight of the
material. The resultant, P2, is considered to operate through the centroid of the section.
c) Seepage loads. Equilibrium seepage patterns will establish within and under a dam,
e.g. in pores and discontinuities, with resultant vertical loads identified as internal and
external uplift, P3 and P4, respectively.
a) Seismic load. Horizontal and vertical inertia loads are generated with respect to the
dam and the retained water by seismic disturbance. For the water inertia forces are
simplified equivalent static thrust, P8, is shown.
b) Tectonic effects. Saturation, or disturbance following deep excavation in rock, may
generate loading as a result of slow tectonic movements.
8 A.Bulu
Figure 1.5. Schedule of principal loads: gravity dam profile