JULY to
DECEMBER,
2019
FAITH PLANT
GLOBAL (INT’L) SERVICES LIMITED
PROJECT
MANAGER
ACCOUNTANT
OFFICER
SITE OFFICER SAFETY OFFICER
LAND GEOTECHNICS
QTY SURVEYOR ENGINEER
SITE AGENT
SURVEYOR
Freshly mixed grade M20 concrete mixed with a mobile mixer was used to
cast the slabs. Vibration of the element was done using internal vibrators
(poker vibrator) to vibrate the concrete thereby removing entrapped air
voids.
SURVEY
Environmental
leveling of Glorious
Assembly Ministries
(Atimbo, Calabar)
SOLUTIONS PROVIDED
1. Production of Water Ways
2. Production of Temporary Bumps
3. Clearing/Cleaning of already existing drains
Conclusion 1
My student industrial work experience program ended on
the 21st of December, 2019. In general, the past six
months of the industrial training was a very essential era
of my life as an undergraduate student. This program has
without any element of doubt helped in the aspects of
knowledge and experience. I now understand the
importance of merging practical and theoretical
knowledge together, i.e., it is not worthwhile to have
theoretical knowledge without practical experiences and,
it is also not worthwhile to have practical experiences
without theoretical knowledge. There must be a good
combination of both of those aspects for one to be an
excellent civil engineer.
RECOMMENDATION
Faith Plant Global (Int’l) Services is recommended as a good training
establishment for industrial training students. They take the trainee through the
Basics of civil Engineering works.
Design Softwares should be introduced and taught Students From 200 Level, so
that the Students will have a good understanding of these Softwares before
getting to 400 level, as it is of VERY HIGH demand in the field of Civil Engineering.
Also, Students Should be Taught at least five (5) Softwares before Leaving the
university as anREFEREN
Undergraduate.
CE
Bitumen and Asphalt Concrete
http://www.Wikipedia.com. Retrieved on 2/11/2019