GLUE INVESTIGATION

30028 DRUM WEIGHT BEFORE BONDING 270 KG


DRUM WEIGHT AFTER BONDING 102 KG
GLUE CONSUMED 168 KG

ITEMS BONDED LENGTH HEIGHT M2 PER SIDE M2 TOTAL QTY BUILT TOTAL M2
SEMI SIDE WALL 13.5 2.8 37.8 75.6 2 151.2
REAR DOOR 1.2 2.8 3.36 6.72 3 20.16
FRONT WALL 2.5 2.8 7 14 1 14
COLES FLOOR 3.65 2.1 7.665 15.33 4 61.32

M2 TOTAL 246.68
GLUE KG 168
GLUE/M2 0.6810443

B TRAILER BOM LENGTH HEIGHT M2 PER SIDE M2 TOTAL GLUE ALLOCATED


FRONT WALL 2.5 2.8 7 14 4
REAR DOOR KERBSIDE 1.2 2.8 3.36 6.72 6
REAR DOOR ROADSIDE 1.2 2.8 3.36 6.72 6
SIDE WALL KERBSIDE 13.5 2.8 37.8 75.6 32
SIDE WALL ROADSIDE 13.5 2.8 37.8 75.6 32
ROOF PANEL 13.5 2.5 33.75 67.5 32

M2 TOTAL 246.14
GLUE REQ 167.6322 112

GLUE USED BUT NOT ALLOCATED TO JOB 55.632236


HARDENER USED BUT NOT ALLOCATED TO JOB 13.908059

EVERY SEMI TRAILER WE HAVE BUILT HAS UNDER ESTIMATED THE AMOUNT OF GLUE REQUIRED TO MANUFACTURE
THE PANELS. AS THE GLUE /HARDENER IS USED IN A RATIO OF 4:1, PART NUMBER 30027 HAS ALSO BEEN UNDERESTIMATED

THE BOM FOR THESE TRAILERS URGENTLY NEEDS UPDATING TO REFLECT ACTUAL USAGE OF 30028 & 30027

LENGTH HEIGHT M2 PER SIDE M2 TOTAL 30028 30027


33764 FRONT WALL 2.5 2.8 7 14 9.5346198 2.383655
31522 REAR DOOR KERBSIDE 1.2 2.8 3.36 6.72 4.5766175 1.144154
31523 REAR DOOR ROADSIDE 1.2 2.8 3.36 6.72 4.5766175 1.144154
31524 SIDE WALL KERBSIDE 13.5 2.8 37.8 75.6 51.486947 12.87174
31525 SIDE WALL ROADSIDE 13.5 2.8 37.8 75.6 51.486947 12.87174
31526 ROOF PANEL 13.5 2.5 33.75 67.5 45.970488 11.49262

167.63224 41.90806

FINANCIALLY
$/KG $/UNIT
30028 ADHESIVE MACROLAST PART B 5400 $ 6.42 $ 357.16
30027 ADHESIVE MACROLAST PART A 8101 $ 8.24 $ 114.60

COST PER UNIT NOT ALLOCATED $ 471.76