You are on page 1of 5

SCIENCE PROJECT

PROPOSAL
Due Friday, November 18

Question: How does the (TV) affect the (DV)

1. How does the temperature of the basketball affect the height of the
bounce?
2. Independent variable: temperature of basketball
Dependent variable: height of the bounce
3. List at least 3 constant for your experiment

-same basketball, same surface, dropped from same height, always


measure from the top of basketball

4. Briefly explain what you are going to do in each group.

A. Group 1(control group-what you normally do)

I will let the basketball sit for 10 minutes at room temperature (75 celsius) . I
will drop the ball from 1 meter. I will measure how high the top of the ball
bounces to.

B. Group 2 (experimental/test group(s)-may be more than one)

I will put the basketball in the refrigerator for 10 minutes and then drop it
from 1 meter .

Group 3- I will put the basketball in the oven at 100 fahrenheit for 10 minutes
and then I will drop it from 1 meter.

5.Number of trials for each group (minimum of 20/sec teacher)

Explain: I will drop each temperature group 15 times

6. How are going to measure your results? Be specific !!

I will have a helper hold a meter stick vertically. I will have another
helper drop the ball. I will crouch down so that I can see the meter stick and
tell how high the ball bounces.
PROJECT PROPOSAL

I.Malarayat Watershed Conservation Porgram


II.Mt.Malarayat,Lipa (Via Brgy. Sto Nino,Lipa City)
III.November 2015-March 2016(Every Friday)
IV.Environmental/Ecological Program
V.Department Invoved/College Involved
1.National Service Training Program (NSTP) Office
2.CEAFACS
3.CAS
VI.Project Leader and Coordinators
(Instructor,Leader and All Members with Contact
Information)
VII.Cooperating Agencies/Partners:
1. National Service Training Program (NSTP) Office
2. Gawad Kalinga
3. Brgy.Sto Nino Lipa City
VIII.All residence of Brgy.Sto Nino, Lipa City
1. Out of school Youth
2. Parents
3. Students
IX.Total Cost of the project:
(Please indicate the proposed total cost of the project)
X.Rationale of the project
The initiatives to protect the Malarayat Forest Reserved resulted
the Lipa Water Forum I (September 2004),and reinforced by the
outputs of Lipa water furom II (June 2006),where the stakeholders
identified the boundaries of the watersheds that supply not only the
city’s water sources but also those of the surrounding areas.
In the span of two years since the water forum I,the stockholders
(LGU,the metro-Lipa Water District,involved
barangays,NGOs,business sector,and the church)have put much
effort and resources to come up with a long –term program for the
protection of said forest reserve, including series of meetings,
consultations, workshops. The stakeholders have formed a technical
working group (TWG) with puso’d inc (the NGO that spearheaded
the Water Forums) as the secretariat. Thru Pusod the TWG was
able to tap the help.

November 6, 2016
Rochelle Ancheta
Claveria,Cagayan
Taupo
09123657
Irene Ballesteros
Brgy. Malilitao
Claveria,Cagayan
Taupo

Dear Ms. Irene


After reading your advertisement in the Taupo Times I would like to apply for
the position of store person with your company.
I have been employed with a major company for several years as a retail
assistant, and have some stock control experience. My background with a large
chemical company has also given me experience in handling hazardous material
, and I am aware this would be an aspect of the store person position.
Enclosed is my application form as well as a copy of my CV and several
references.
I lock forward to meeting you and taking about how I can contribute to your
company.

Your sincerely,
Rochelle

November 6,2016
Software Development
Claveria,Cagayan

Dear Sir/Madam,
I am currently looking for job when I was informed that your firm has
vacancies and Im interested in applying for any of your vacant positions . I am
confident that my skills and experience my studies could make a great
contribution in your firm. I am also willing to do work that you willing give to
gain more experience.
I would appreciate the opportunity to discuss my qualification for any of your
vacant position is greater detail with you in person at your earliest convenience
,My resume is attached for your review.
Thank you for consideration.
Respectfully yours,
Debbie Jardiel Viloria

You might also like