AIR RECEIVER
Item No :
Title : Air Receiver
Certification : This Specification is certified to be in compliance with the requirements of Part 2, of the
ASME Boiler and Pressure Vessel Code,2007 Edition, 2009 Addenda, Section VIII, Div. 2
1. GENERAL………………………………………………………………………………………..3
2. RELATED DOCUMENTS...................................................................................................3
3. DESIGN CRITERIA……………………………………………………………………………..3
4. ADDITIONAL REQUIREMENT………………………………………………………………..4
Page 2 of 5
USER'S DESIGN SPECIFICATION
1. GENERAL
1.1 User is PTF, who will own and/or operate the Pressure Vessel Tank,
1.2 This specification, together with the related drawings, data sheets, codes and standards, constitutes
a complete "User's Design Specification" as required by Part 2, Paragraph 2.2, of the
ASME Boiler and Pressure Vessel Code, Section VIII, Division 2.
1.3 Conflicts
1.3.1 If conflicts occur between the User's Design Specification and any other document, drawing, data
sheets, specification, code, or standard, it shall be the responsibility of the Pressure Vessel Manufacturer
to call attention to the discrepancy and request a written ruling or interpretation from the engineer
responsible for the User's Design Specification. The Manufacturer is not at liberty to assume which
institution shall govern.
1.3.2 All applications for exemptions, exceptions, or interpretations sha!l be made in writing and shall
clearly state the extent of and the reasons for the relief requested, Any proposed deviation from this
specification shall be submitted to the engineer responsible for this specification to obtain his written
approval and the Owner's concurrence, by a revision of this specification.
1.4 The related data sheets and drawings contain requirements in addition to the rules of the ASME Code,
Section VIII, Division 2. Brief supplementary requirements that affect the Manufacturer’s Design Report
are given in this User's Design Specification.
2. RELATED DOCUMENTS
2.1. Design Code - .
ASME Boiler and Pressure Vessel Code, Section Vlll, Division 2, 2007 Edition, 2009 Addenda
ASME Boiler and Pressure Vessel Code, Section II, Part D, 2007 Edition, 2009 Addenda
3. DESIGN CRITERIA
3.1. The spherical tank shall be designed in accordance with the ASME Boiler and Pressure Vessel Code, Section
VII1, Division 2, 2007 Edition, 2009 Addenda
3.2. Certification shall be per ASME Code Section Vlll, Division 2, Part Annex 2.A
3.3. Installation site
3.3.1 Location: Maptaphut Rayong
3.3.2 Jurisdiction authority applicable: N/A
3.3.3 Environmental conditions
a) Wind loads
Code: ASCE 7-88
Basic wind speed: 38 m/s
Exposure Category: C
Importance factor: 1.0
Seismic load: UBC 1997 Ground Support
Zone : 1
Factor : 1.0
b) Earthquake design loads: N/A
c) snow loads : N/A
d) Lowest one day mean temperature for location : 25 °C
3.4. Vessel Identification
3.4.1 Vessel number: M-002
3.4.2 Service: Air
3.5. Vessel Dimension
3.5.1 Outline Drawing: N/A
3.5.2 Type: Horizontal
3.5.3 Nozzle
N1 (Inlet) = DN 100
N2 (Vent) = DN 100
N3 (Outlet) = DN 100
N4 (Drain) = DN 50
M1 (Manhole) = DN 600
Page 3 of 5
3.5.4 Inside Diameter: 950 mm
Length 1600 mm(TL-TL)
Volume 1.359 m²
3.5.5 Support: Saddle
3.9.3.2 The pressure vessel fabricator shall furnish and install all attachments welded directly to
the Pressure
Vessel. All attachment welds of non-pressure parts to the spherical tank shall be made with full
penetration ground to a generous and smooth concave contour.
3.9.3.3 The pressure vessel fabricator shall provide full details for shop fabrication. Such details
shall be submitted for approval prior to fabrication and should cover.
a) Welding procedures
b) Heat treatment technique
c) Sequence of fabrication and assemble (including all inspection steps)
d) Hydrostatic testing procedure
e) Quality control procedures (including extent of NDE).
3.9.3.4 The heat treatment of the Pressure Vessel shall be accordance with the requirements of
the ASME Code
3.10 Loads and Load Case: Per code only no special load case combination.
4. ADDITIONAL REQUIREMENTS
4.1 The pressure vessel shall be inspected in accordance with the requirements specified in the ASME
Code and Procedures listed in para. 3.9.3.3
Page 4 of 5
4.2.2. The hydrostatic test pressure shall be held for at least one hour.
Page 5 of 5