Roma

Average Daily Demand (pieces) 154.8


Average Monthly Demand (pieces) 4024.8
Operating Costs (Lire/Piece/Month) 3605
Inventory Costs (Lire/Piece/Month) 1035
Short-Haul transportation Costs (Lire/Piece/Month) 4300
Average Inventory 1200
Distance between Fabriano and Rome (Km) 222
Tariff for tractor trailer (Lire) 420000
Tariff for small truck (Lire) 250000
Capacity for tractor trailer 120
Capacity for small truck 45

No. of working days 26


Net average inventory of all warehouses 14330
Cycle Stock 8598
Safety Stock 5732

Safety Stock at central warehouse as per risk pooling 1390.21420271


Total Stock at central warehouse 9988.21420271

Operating Cost Inventory Cost


Before Transit 1074.84 308.59
Post- Transit 214.97 0.00
Cost Saving
Short-Haul transportation Cost Long-Haul transportation Costs Inventory cost at Central Warehouse
4300 3500.00
4300 3707.02 98.79
Total Cost
9183.4227788
8320.7731459
862.64963
catanzaro

Average Daily Demand (pieces) 58.7


Average Monthly Demand (pieces) 1526.2
Operating Costs (Lire/Piece/Month) 3324
Inventory Costs (Lire/Piece/Month) 1721
Short-Haul transportation Costs (Lire/Piece/Month) 4700
Average Inventory 780
Distance between Fabriano and Rome (Km) 808
Tariff for tractor trailer (Lire) 1100000
Tariff for small truck (Lire) 600000
Capacity for tractor trailer 120
Capacity for small truck 45

No. of working days 26


Net average inventory of all warehouses 14330
Cycle Stock 8598
Safety Stock 5732

Safety Stock at central warehouse as per risk pooling 1390.21420271


Total Stock at central warehouse 9988.21420271

Operating Cost Inventory Cost


Before Transit 1698.81 879.56
Post- Transit 339.76 0.00
Cost Saving
Short-Haul transportation Cost Long-Haul transportation Costs Inventory cost at Central Warehouse
4300 9166.67
4300 25029.48 433.20
Total Cost
16045.031
30102.442
-14057.41
Region Total Avg Demand seHolding cost
Ancona 75 100%
Bari 165.3 100%
Bologna 91.1 100%
Bolzano 30 100%
cagliari 69.7 100%
catania 93.4 100%
catanzaro 65.2 100%
Firenze 108.9 100%
Genova 62.8 100%
Milano 203.5 100%
Napoli 183.1 100%
Padova 99.6 100%
Palermo 98.6 100%
Pescara 65.2 100%
Roma 164.7 100%
Torino 88.8 100%
Udine 21.7 100%
Roma
Average in 1200
Demand fil 154.8
order cycle 8
Current model
operating cost/order cycle/litre/piece
inventory cost
transportation cost
Total cost