DIFFERENCE BETWEEN

PERT & CPM


DIFFERENCE
PERT CPM

• PERT (Programme Evaluation • CPM (Critical Path Method)


& Review Technique) is event is activity oriented.
oriented. • CPM activities are shown as
• PERT activities are shown as a a network of precedence
network of precedence relationships using activity-
relationships using activity-on- on-node network
arrow network construction construction
• PERT treats activity time as a
• CPM requires a single
random variable
deterministic time value for
• PERT focuses exclusively on
each activity.
the time variable
• CPM includes the analysis
of the Time/Cost Trade-off.
PERT CPM

• PERT is a probabilistic • CPM is a deterministic


Model. It uses three model i.e. it dose not take
estimates of the activity into account the
time- optimistic, pessimistic uncertainties. Involved in
and most Likely with a the estimation of time for
view to take into account execution of a job or an
time uncertainty. activity. It completely
• PERT is primarily Ignores the probabilistic
concerned with time. It element of the problem.
helps the manager to • CPM place dual emphasis
schedule and co-ordinate on time and cost and
various activities so that the evaluate the trade off
project can be completed on between project Cost and
schedule time. project time.
PERT CPM

• Suitable for repetitive • Suitable for new projects


projects • Does not demarcate between
• Demarcate critical and critical and & noncritical
noncritical activities activities
• determined on the basis of • Critical path is determined
slack on the basis of float
• Suitable for defense • Suitable for industrial
• Dummies are not required project settings
• Crashing is not applicable • Dummies are compulsory
• Crashing is applicable
CPM analysis
• Draw the CPM network
• Analyze the paths through the network
• Determine the float for each activity
– Compute the activity’s float
float = LS - ES = LF - EF
– Float is the maximum amount of time that this activity can be
delay in its completion before it becomes a critical activity,
i.e., delays completion of the project
• Find the critical path is that the sequence of activities and events
where there is no “slack” i.e.. Zero slack
– Longest path through a network
• Find the project duration is minimum project completion time
CPM Example
• Critical Path f, 15

g, 17 h, 9
a, 6
i, 6

b, 8
d, 13
j, 12

c, 5

e, 9
PERT
• PERT is based on the assumption that an activity’s duration
follows a probability distribution instead of being a single value
• Three time estimates are required to compute the parameters of
an activity’s duration distribution:
– pessimistic time (tp ) - the time the activity would take if
things did not go well
– most likely time (tm ) - the consensus best estimate of the
activity’s duration
– optimistic time (to ) - the time the activity would take if things
did go well

Mean (expected time): te =


tp + 4 tm + to
6

2
ttp-to
p - to
Variance: Vt =2 =
darla/smbs/vit 6
6
PERT analysis
• Draw the network.
• Analyze the paths through the network and find the critical path.
• The length of the critical path is the mean of the project duration
probability distribution which is assumed to be normal
• The standard deviation of the project duration probability
distribution is computed by adding the variances of the critical
activities (all of the activities that make up the critical path) and
taking the square root of that sum
• Probability computations can now be made using the normal
distribution table.
Probability computation

Determine probability that project is completed within specified time

x-
Z=

where  = tp = project mean time


 = project standard mean time
x = (proposed ) specified time
AOA Project Network for House
3
Lay Dummy
foundation
2 0 Build Finish
3 1 house work
1 2 4 6 7
Design house Order and 3 1
and obtain receive Select 1 1 Select
financing materials paint carpet
5

AON Project Network for House


Lay foundations Build house
2 4
Finish work
2 3
7
Start 1 1
3
Design house and 6
3
obtain financing 5 1
1
1 Select carpet
Order and receive
darla/smbs/vit 10
Select paint
materials