Sub: - Submission of tender drawing (Section- 9) for Civil & Hydro-mechanical work

packages of Lodhama-II HEP

The drawings details are tabulated hereunder:-

Drawing Description Sheet No.


General Layout Plan of the Project 1
Profile of water conductor 2
Anchor Block drawing. 3
L-section of the project through 4
penstock
Support system of penstock in between 5
anchor block
Typical section of Water conductor 6
inside Adit-II, outside Adit-II, TRC and
exit channel of spillway.
Plan and section of Forebay Tank with 7
spillway arrangement, junction point of
existing Lodhama tunnel and Adit-II
tunnel for proposed transfer structure.
Power House plan 8
Power House cross section 9
Power House Long Section 10
Long section of Nala near power house 11
showing penstock crossing