"WELDGRP.

xls" Program
Version 2.1

WELD GROUP ANALYSIS


Using the Elastic Method for up to 24 Total Welds

Job Name: 1 Subject:


Job Number: Originator: Checker:

Input Data: Weld Spec: E70XX

Number of Welds, Nw = 2 400.0


Weld Coordinates:
Start End 350.0

X1 (mm.) Y1 (mm.) X2 (mm.) Y2 (mm.)


300.0
Weld #1 0.000 170.000 0.000 340.000
Weld #2 20.000 170.000 20.000 340.000 250.0

Y - AXIS (mm.)
200.0

150.0

100.0

50.0

0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0

-50.0

X - AXIS (mm.)

WELD GROUP PLOT

+Y 1=Start
2=End
1 2
2
Weld #3
Weld #2
No. of Load Points = 1 Weld #1
Load Point Data: 1
Point #1 1 2
X-Coordmmate (mm.) = 10.000 0 +X
Y-Coordmmate (mm.) = -25.000 Origin
Z-Coordmmate (mm.) = -130.000 +Z
Axial Load, Pz (N) = 49050.00 NOMENCLATURE
Shear Load, Px (N) = 0.00
Shear Load, Py (N) = 0.00
Moment, Mx (N-mm) = 0.00
Moment, My (N-mm) = 0.00
Moment, Mz (N-mm) = 0.00
(continued)

1 of 2 3/15/2019 4:49 PM