You are on page 1of 45

PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦

CONSULTANT GROUPTypsa DATE 25/10/2017


CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 1
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 329.8 MIC 300,314,306,359,370
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 333.2 MIC 325,358,366,311,306
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 343.8 MIC 351,345,334,332,357
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 347.2 MIC 307,354,367,348,360

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 2
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 305 MIC 290,320,302,343,270
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 324.8 MIC 353,326,271,305,369
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 308.4 MIC 289,317,303,297,336
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 315.6 MIC 280,353,363,278,304

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 3
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 341.2 MIC 366,375,305,320,340
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 337.4 MIC 349,335,328,375,300
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 344.8 MIC 365,345,338,321,355
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 337.2 MIC 369,321,355,341,300

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 4
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 352.6 MIC 366,353,370,329,345
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 308.4 MIC 345,297,278,302,320
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 324 MIC 309,323,342,376,270
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 319.8 MIC 294,271,337,357,340

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 5
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 358.2 MIC 370,324,349,376,372
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 349.2 MIC 363,342,370,351,320
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 333.2 MIC 325,358,366,311,306
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 328 MIC 340,305,348,317,330

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUP TYPAS
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 6
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 351.6 MIC 348,315,368,352,375,
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 343.2 MIC 339,345,300,360,372
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 340.8 MIC 298,320,345,369,372
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 318 MIC 348,315,305,295,327

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 7
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 331 MIC 308,337,333,312,365
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 326 MIC 310,335,365,295,325
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 342 MIC 351,345,324,333,357
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 310.6 MIC 323,279,299,314,338

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 8
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 319.6 MIC 279,328,358,335,298
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 329.6 MIC 335,320,308,324,361
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 316.4 MIC 314,333,325,265,345,
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 317.4 MIC 300,295,305,338,349

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 9
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 349.4 MIC 339,325,370,346,367
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 351.2 MIC 317,353,373,363,350
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 326.8 MIC 345,299,374,323,293
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 323.8 MIC 324,370,276,301,348

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 10
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 329.2 MIC 368,300,335,328,315
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 311 MIC 285,300,290,330,350
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 323 MIC 320,298,362,275,360
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 324 MIC 315,308,322,355,320

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 11
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 325 MIC 330,316,295,324,360
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 327.8 MIC 285,366,310,336,342
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 329 MIC 350,338,372,280,305
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 328.8 MIC 305,318,330,341,350

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 12
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 319.8 MIC 311,293,333,358,304
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 342.2 MIC 334,362,370,315,330
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 319 MIC 314,282,360,335,304
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 342.4 MIC 328,373,340,323,348

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 13
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 333.8 MIC 293,357,335,345,339
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 326 MIC 310,369,296,330,325
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 332.8 MIC 315,338,328,368,315
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 347.4 MIC 366,275,355,375,366

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 14
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 328.6 MIC 347,332,313,285,366
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 332.4 MIC 373,323,303,313,350
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 338 MIC 335,365,317,306,367
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 318.4 MIC 370,290,300,337,295

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 15
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 338 MIC 305,353,322,345,365
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 340.4 MIC 333,362,345,312,350
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 328.8 MIC 315,340,354,270,365
4 Plate 4 INTERMEDIATE COAT DFT TANK GUARD 412 338.8 MIC 349,359,348,318,320

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 16
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 349 MIC 332,345,365,329,374
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 338.2 MIC 334,365,348,316,328
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 355.6 MIC 339,360,375,344,360

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 17
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 330.8 MIC 285,319,330,350,370
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 339.8 MIC 315,338,325,368,353
3 Plate 3 INTERMEDIATE COAT DFT TANK GUARD 412 351 MIC 303,335,357,370,390

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 18
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 306.4 MIC 333,289,265,300,345
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 354 MIC 344,354,367,348,357

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 19
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 309.8 MIC 303,283,300,313,350
2 Plate 2 INTERMEDIATE COAT DFT TANK GUARD 412 320 MIC 340,305,314,311,330

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 20
INTERNAL TANK BOTTOM INTERMEDIATE COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 INTERMEDIATE COAT DFT TANK GUARD 412 316.4 MIC 308,320,340,323,291

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water storage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/10/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL TANK GUARD 412 INSPECTION INTERMEDIATE COAT DFT
TANK NO 1 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 21
INTERNAL TANK BOTTOM FINAL COAT DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.265-375mic) REMARK
1 Plate 1 FINAL COAT DFT TANK GUARD 412 328.8 MIC 315,340,354,270,365

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 16.9 24.0◦C 18.5◦c 2.6◦C ACCEPTED
9:00AM 16.3 26.9◦C 21.0c◦ 4.3◦C ACCEPTED
11:30AM 18.3 28.5◦C 25.6c◦ 3.8◦C ACCEPTED
12:30PM 21.2 33.5◦C 29.4◦c 2.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 180◦ to 270◦
CONSULTANT GROUPTypsa DATE 15/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
MARINA 11 CALIBRATION DATE : 25/3/2017,EXP 25/3/2018
LINE NO 22
INTERNAL TANK BOTTOM PRIMER DFT
SL NO Plate No ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 Plate 1 PRIMER DFT PEN GUARD PRIMER 69.4 MIC 69,61,55,76,86

NOT REQURED
25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413
TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 9.4 26.0◦C 26.3◦c 4.0◦C ACCEPTED
9:00AM 15.0◦C 34.9◦C 29.1c◦ 2.2◦C ACCEPTED
11:30AM 19.4◦C 44.6◦C 34.4c◦ 1.7◦C ACCEPTED
4:30PM 11.6◦ 40.5◦C 31.6◦ 3.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 180◦ to270◦
CONSULTANT GROUPTypsa DATE 22/07/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 PLATE 1 PRIMER DFT PEN GUARD PRIMER 62.2 MIC 50,69,65,72,55

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 7.9 26.6◦C 23.3◦c 1.6◦C ACCEPTED
9:00AM 9.6 36.7◦C 30.4c◦ 2.9◦C ACCEPTED
11:30AM 12.3 45.0◦C 28.9.c◦ 2.0◦C ACCEPTED
4:30PM 15.9 39.0◦C 38.0◦c 4.7◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 180◦ to270◦
CONSULTANT GROUPTypsa DATE 22/07/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 PLATE 2 PRIMER DFT PEN GUARD PRIMER 60.6 MIC 45,59,66,73,60

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 7.9 26.6◦C 23.3◦c 1.6◦C ACCEPTED
9:00AM 9.6 36.7◦C 30.4c◦ 2.9◦C ACCEPTED
11:30AM 12.3 45.0◦C 28.9.c◦ 2.0◦C ACCEPTED
4:30PM 15.9 39.0◦C 38.0◦c 4.7◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 180◦ to270◦
CONSULTANT GROUPTypsa DATE 20/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 PLATE 3 PRIMER DFT PEN GUARD PRIMER 63.6 MIC 67,73,70,42,66

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 11.2 26.0◦C 30.3◦c 2.4◦C ACCEPTED
9:00AM 15.2 33.6◦C 28.1◦c 4.0◦C ACCEPTED
11:30AM 18.2 40.0◦C 32.7◦c 3.4◦C ACCEPTED
4:30PM 12.4 39.3◦C 38.4◦c 2.6◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 180◦ to270◦
CONSULTANT GROUPTypsa DATE 19/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 PLATE 4 PRIMER DFT PEN GUARD PRIMER 64.2 MIC 67,80,43,70,61

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITYSURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 8.1 25.2◦C 26.7◦c 1.7◦C ACCEPTED
9:00AM 10.8◦C 29.1◦C 31.0c◦ 2.4◦C ACCEPTED
11:30AM 16.4◦C 35.7◦C 34.1c◦ 1.3◦C ACCEPTED
4:30PM 14.7◦ 32.9◦C 30.7◦ 3.4◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW
CONSULTANT GROUPTypsa
CONTRACTOR Dngo
PAINTING MATERIAL PENGUARD PRIMER
TANK NO 1
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material
1 PLATE 5 PRIMER DFT PEN GUARD PRIMER

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETE


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE
7:00AM 8.1 25.2◦C 26.7◦c
9:00AM 10.8◦C 29.1◦C 31.0c◦
11:30AM 16.4◦C 35.7◦C 34.1c◦
4:30PM 14.7◦ 32.9◦C 30.7◦
.
DNGO INSPECTION QUALITY ( THIRD PARTY )
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
ge Tanks -TGSW Reference 180◦ to270◦
psa DATE 19/7/2017
INSTRUMENT ELCOMETER PF 12576
RIMER INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018

RNAL TANK PRIMER DFT


RESULT (REQ.40-100mic) REMARK
69.8 MIC 70,88,73,65,53

HER TEMPERATIURE REPORT ELCOMETERE RL10413


DEW POINT TEMPERATURE REMARK
1.7◦C ACCEPTED
2.4◦C ACCEPTED
1.3◦C ACCEPTED
3.4◦C ACCEPTED

CTION QUALITY ( THIRD PARTY ) GROUPTypsa


MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
AINTING & COATING INSPECTOR MATERIAL ENGINEER
PROJECT Startegic water stprage Tanks -TGSW Reference 180◦ to270◦
CONSULTANT GROUPTypsa DATE 18/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 PLATE 6 PRIMER DFT PEN GUARD PRIMER 73.4 MIC 86,72,57,79,73

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 8.3 29.1◦C 20.7◦C 6.1◦C ACCEPTED
9:00AM 16.7 33.0◦C 26.1◦C 4.8◦C ACCEPTED
11:30AM 19.2 46.5◦C 24.0◦C 5.0◦C ACCEPTED
4:30PM 15 35.3◦C 27.4◦c 3.7◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 180◦ to270◦
CONSULTANT GROUPTypsa DATE 18/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 PLATE 7 PRIMER DFT PEN GUARD PRIMER 70.2 MIC 66,87,77,58,63

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 8.3 29.1◦C 20.7◦C 6.1◦C ACCEPTED
9:00AM 16.7 33.0◦C 26.1◦C 4.8◦C ACCEPTED
11:30AM 19.2 46.5◦C 24.0◦C 5.0◦C ACCEPTED
4:30PM 15 35.3◦C 27.4◦c 3.7◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 90◦ to180◦
CONSULTANT GROUPTypsa DATE 8/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 1
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-100mic) REMARK
1 PLATE 8 PRIMER DFT PEN GUARD PRIMER 72.6 MIC 86,77,68,72,60

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY
SURFACE TEMPERATUREAIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 13.6 25.9◦C 33.3◦c 3.0◦C ACCEPTED
9:00AM 12.9◦C 30.9◦C 28.6c◦ 2.5◦C ACCEPTED
11:30AM 13.0◦C 42.6◦C 30.9c◦ 3.7◦C ACCEPTED
4:30PM 10.6◦ 38.5◦C 31.0◦ 4.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MANOLITO ARANAS LAZARO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR MATERIAL ENGINEER
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 90◦ to180◦
CONSULTANT GROUPTypsa DATE 8/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 8
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 71.6 MIC 65,73,82,68,70

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 13.6 25.9◦C 33.3◦c 3.0◦C ACCEPTED
9:00AM 12.9◦C 30.9◦C 28.6c◦ 2.5◦C ACCEPTED
11:30AM 13.0◦C 42.6◦C 30.9c◦ 3.7◦C ACCEPTED
4:30PM 10.6◦ 38.5◦C 31.0◦ 4.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 90◦ to180◦
CONSULTANT GROUPTypsa DATE 9/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 9
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 67.2 MIC 55,69,79,70,63

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 14.8 30.5◦C 32.7◦C 2.6◦C ACCEPTED
9:00AM 15.22 35.9 34.9◦C 6.1◦C ACCEPTED
11:30AM 17.2 38.1◦C 33.2◦C 5.0◦C ACCEPTED
4:30PM 9.5 40.3◦C 39.8◦C 1.4◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 90◦ to180◦
CONSULTANT GROUPTypsa DATE 9/5/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 10
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 67.6 MIC 83,67,55,63,70

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:30AM 10.32 20.4◦C 22◦ 5.1◦C ACCEPTED
10:00AM 12.5 25◦C 24.9◦ 7.9◦C ACCEPTED
12:30PM 13.72 37.5◦C 26.7◦ 9.9◦C ACCEPTED
3:00PM 13.35 40◦C 30.8◦ 11.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 90◦ to 180◦
CONSULTANT GROUPTypsa DATE 10/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 10
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 74 MIC 71,66,85,68,80

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 9.8 33.0◦C 25.7◦C 3.1◦C ACCEPTED
9:00AM 11.9 37.9 21.2◦C 2.0◦C ACCEPTED
11:30AM 17.2 43.1◦C 28.5◦C 4.2◦C ACCEPTED
4:30PM 10.7 39.5◦C 30.4◦c 1.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 90◦ to 180◦
CONSULTANT GROUPTypsa DATE 15/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 11
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 71.6 MIC 67,71,64,76,80

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 9.4 26.0◦C 26.3◦c 4.0◦C ACCEPTED
9:00AM 15.0◦C 34.9◦C 29.1c◦ 2.2◦C ACCEPTED
11:30AM 19.4◦C 44.6◦C 34.4c◦ 1.7◦C ACCEPTED
4:30PM 11.6◦ 40.5◦C 31.6◦ 3.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 90◦ to 180◦
CONSULTANT GROUPTypsa DATE 15/7/2017
CONTRACTOR Dngo INSTRUMENT ELCOMETER PF 12576
PAINTING MATERIAL PENGUARD PRIMER INSPECTION PRIMER DFT
TANK NO 1 CALIBRATION DATE : 25/3/217,EXP 25/5/2018
COURSE NO 12
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE PRIMER DFT PEN GUARD PRIMER 74.6 MIC 78,69,65,73,88

25/3/2017 TO 25/3/2018 WEATHER TEMPERATIURE REPORT ELCOMETERE RL10413


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:00AM 9.4 26.0◦C 26.3◦c 4.0◦C ACCEPTED
9:00AM 15.0◦C 34.9◦C 29.1c◦ 2.2◦C ACCEPTED
11:30AM 19.4◦C 44.6◦C 34.4c◦ 1.7◦C ACCEPTED
4:30PM 11.6◦ 40.5◦C 31.6◦ 3.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 26/5/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 4 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 66 MIC 69,62,65,66,68,
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 71.2 MIC 65,78,66,75,72
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 70 MIC 75,78,76,72,79
4 COURSE 5 PRIMER DFT PEN GUARD PRIMER 76 MIC 82,78,89,79,83
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 80.2 MIC 78,79,72,78,76
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 73 MIC 79,72,70,69,78
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 58 MIC 69,58,50,55,59

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:30AM 16.82 22◦C 20◦ 10.1◦C ACCEPTED
10:00AM 18.52 28◦C 22.9◦ 7.9◦C ACCEPTED
12:30PM 18.92 29.5◦C 25.7◦ 8.9◦C ACCEPTED
3:00PM 20.5 36◦C 33.8◦ 10.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 26/4/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 5 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 67.2 MIC 78,68,59,65,66
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 66.6 MIC 66,69,63,65,70
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 67 MIC 70,72,65,66,62
4 COURSE 5 PRIMER DFT PEN GUARD PRIMER 81 MIC 70,81,89,82,83
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 78.4 MIC 81,85,78,79,69
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 81.6 MIC 72,83,82,81,90
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 78.8 MIC 81,86,79,78,70

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:30AM 16.82 22◦C 20◦ 10.1◦C ACCEPTED
10:00AM 18.52 28◦C 22.9◦ 7.9◦C ACCEPTED
12:30PM 18.92 29.5◦C 25.7◦ 8.9◦C ACCEPTED
3:00PM 20.5 36◦C 33.8◦ 10.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 26/4/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 6 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 75.4 MIC 71,79,69,78,80
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 81.4 MIC 72,75,85,86,89
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 84 MIC 72,85,86,88,89
4 COURSE 5 PRIMER DFT PEN GUARD PRIMER 86.2 MIC 87,86,82,91,86
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 64 MIC 63,69,62,61,65
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 84 MIC 79,84,86,82,89,
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 56 MIC 71,82,85,59,56

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:30AM 16.82 22◦C 20◦ 10.1◦C ACCEPTED
10:00AM 18.52 28◦C 22.9◦ 7.9◦C ACCEPTED
12:30PM 18.92 29.5◦C 25.7◦ 8.9◦C ACCEPTED
3:00PM 20.5 36◦C 33.8◦ 10.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/4/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 7 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 87.8 MIC 91,89,88,85,86,
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 92 MIC 96,91,88,99,86,
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 64 MIC 63,62,61,69,65
, COURSE 5 PRIMER DFT PEN GUARD PRIMER 71 MIC 71,74,73,69,68
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 76.4MIC 88,98,65,62,69
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 80.8 MIC 77,79,82,85,81
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 86.2 MIC 87,86,82,91,86

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
20.32 20.4◦C 20◦ 5.1◦C ACCEPTED ACCEPTED
22.5 23◦C 26.9◦ 8.9◦C ACCEPTED ACCEPTED
26.72 30.5◦C 28.7◦ 10.9◦C ACCEPTED ACCEPTED
25.35 32◦C 31.8◦ 11.9◦C ACCEPTED ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 25/5/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 8 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/2017,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 45.6 MIC 40,49,48,42,49
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 56.6 MIC 55,58,56,55,59
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 70.8 MIC 65,68,70,79,72,
4 COURSE 5 PRIMER DFT PEN GUARD PRIMER 63.6 MIC 59,62,69,62,66
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 66.4 MIC 66,65,68,67,66
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 56.4 MIC 59,58,52,53,60
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 76.2 MIC 70,72,79,78,72

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
20.32 20.4◦C 20◦ 5.1◦C ACCEPTED ACCEPTED
22.5 23◦C 26.9◦ 8.9◦C ACCEPTED ACCEPTED
26.72 30.5◦C 28.7◦ 10.9◦C ACCEPTED ACCEPTED
25.35 32◦C 31.8◦ 11.9◦C ACCEPTED ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 23/4/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 9 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 70 MIC 78,70,69,68,65
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 74.2 MIC 65,78,85,68,75
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 67 MIC 70,72,65,66,62
4 COURSE 5 PRIMER DFT PEN GUARD PRIMER 81 MIC 70,81,89,82,83
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 78.4 MIC 81,85,78,79,69
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 64.6 MIC 65,59,68,65,66
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 70 MIC 65,68,69,70,78

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
20.32 20.4◦C 20◦ 5.1◦C ACCEPTED ACCEPTED
22.5 23◦C 26.9◦ 8.9◦C ACCEPTED ACCEPTED
26.72 30.5◦C 28.7◦ 10.9◦C ACCEPTED ACCEPTED
25.35 32◦C 31.8◦ 11.9◦C ACCEPTED ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 23/4/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 10 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 72.2 MIC 75,75,78,68,65
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 61.4 MIC 75,65,50,58,59
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 77.8 MIC 86,85,69,79,70
4 COURSE 5 PRIMER DFT PEN GUARD PRIMER 83.8 MIC 79,80,81,88,91
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 61.8 MIC 71,82,56,55,45
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 81.4 MIC 68,69,70,79,88
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 76.4 MIC 79,80,81,82,85

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:30AM 16.32 20.4◦C 28◦ 4.1◦C ACCEPTED
10:00AM 18.5 25◦C 34.9◦ 6.2◦C ACCEPTED
12:30PM 20.72 32.5◦C 37.7◦ 6.9◦C ACCEPTED
3:00PM 22.35 35◦C 36.8◦ 8.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date
PROJECT Startegic water stprage Tanks -TGSW Reference 270◦ to360◦
CONSULTANT GROUPTypsa DATE 23/4/2017
CONTRACTOR Dngo Report no 1
PAINTING MATERIAL PENGUARD PRIMER INSTRUMENT ELCOMETER PF 12576
MARINA 11 INSPECTION PRIMER DFT
CALIBRATION DATE : 25/3/217,EXP 25/5/2018
INTERNAL TANK PRIMER DFT
SL NO ORIENTATION ACTIVITY PAINTING Material RESULT (REQ.40-75mic) REMARK
1 COURSE 2 PRIMER DFT PEN GUARD PRIMER 66 MIC 69,62,65,66,68,
2 COURSE 3 PRIMER DFT PEN GUARD PRIMER 71.2 MIC 65,78,66,75,72
3 COURSE 4 PRIMER DFT PEN GUARD PRIMER 64.6 MIC 65,59,68,65,66
4 COURSE 5 PRIMER DFT PEN GUARD PRIMER 70 MIC 65,68,69,70,78
5 COURSE 6 PRIMER DFT PEN GUARD PRIMER 76 MIC 65,69,75,85,86
6 COURSE 7 PRIMER DFT PEN GUARD PRIMER 77 MIC 78,72,76,79,80
7 COURSE 8 PRIMER DFT PEN GUARD PRIMER 83.4 MIC 79,84,86,85,83

WEATHER TEMPERATIURE REPORT


TIME RELATIVE HUMIDITY SURFACE TEMPERATURE AIR TEMPERATURE DEW POINT TEMPERATURE REMARK
7:30AM 16.32 20.4◦C 28◦ 4.1◦C ACCEPTED
10:00AM 18.5 25◦C 34.9◦ 6.2◦C ACCEPTED
12:30PM 20.72 32.5◦C 37.7◦ 6.9◦C ACCEPTED
3:00PM 22.35 35◦C 36.8◦ 8.9◦C ACCEPTED
.
DNGO INSPECTION QUALITY ( THIRD PARTY ) GROUPTypsa
NAME ISMAIL AZIZ MOHAMMED SAMIUDDIN MONO LITO
Designation QC ENGINEER QC PAINTING & COATING INSPECTOR
Signature/Date