Page 1 of 16¥ CONTENTS
5 1.0 SCOPE
8
z 20 REFERENCES
3
73 3.0 WATER
25 4.0 AGGREGATE
gs
bs 5.0 SAND
32 6.0 CEMENT
ao 7.0 STEEL
és 8.0 BRICK
35
ge 9.0 STONE
35 10.0 ADMIXTURES
ak
ra 11.0 WATER BARS
eo
sf 12.0 BITUMEN/BITUMINOUS MATERIALS
eg 13.0 PVC PIPES
ge 14.0 WOOD/TIMBER
as 15.0 EPOXY COMPOUND
£ 16.0 PAINT
g8
as 17.0 ANTITERMITE COMPOUNDS
BE
g 18.0 POLYSULPHIDE SEALANTS
iE
ea
32
gs
zt
5
ENGINEERS INDIA LIMITED MATERIALS SE rcuemnnmettcict |e
NEW DELHI 6-68-0002 5
Page 2 of 16]10 SCOPE
i This specification establishes and defines the requirements of various materials to be
used in Civil and Structural works.
12 ‘Whenever any reference to BIS Codes is made, the same shall be taken as the latest
revision (with all amendments issued thereto) as on the date of submission of the bid.
13 ‘Apart from the BIS Codes mentioned in particular in the various clauses of this
specification, all other relevant codes related to specific job under consideration
regarding quality, tests, testing and/or inspection procedures shall be applicable.
Reference to some of the Codes in the various clauses of this specification does not,
limit or restrict the scope of applicability of other referred or relevant codes.
‘A4-210%297,
14 In case of any variation/contradiction between the provision of BIS Codes and this
specification, the provision given in this specification shall be followed.
15 All materials shall be of standard quality and shall be procured from renowned
sources’ manufacturers approved by the Engineer-in-Charge. It shall be the
responsibility of the Contractor, to get all materials! manufacturers approved by the
Engineer-in-Charge prior to procurement and placement of order.
16 Whenever called for by the Engineer-in-Charge all tests of the materials as specified
by the relevant BIS Codes shall be carried out by the Contractor in an approved
laboratory and test reports duly authenticated by the laboratory, shall be submitted
to the Engineer-in-Charge for his approval. If so desired by the Engineer-in-Charge,
tests shall be conducted in the presence of the Engineer-in-Charge or his authorised
nominee.
1 Quality and acceptability of materials not covered under this specification shall be
governed by the relevant BIS Codes. In case BIS code is not available for the
particular material, other codes e.g. BS or DIN or API/ASTM shall be considered.
‘The decision of Engineer-in-Charge, in this regard, shall be final and binding on the
Contractor.
18 Whenever asked for, the Contractor shall submit representative samples of materials,
to the Engineer-in-Charge for his inspection and approval. Approval of any sample
does not necessarily exempt the Contractor from submitting necessary test reports for
the approved material, as per the specification/relevant BIS Codes.
19 ‘The Contractor shall submit manufacturer's test reports on quality and suitabil
any material procured from them and their recommendation on storage, applic:
workmanship etc. for the intended use. Submission of manufacturer's test reports
does not restrict the Engineer-in-Charge from asking fresh test results from an
approved laboratory of the actual material supplied from an approved
manufacturer/source at any stage of execution of work.
of,
ited way permitted by a written consent given by the lender to the borrower for the intended use, Elk 1641-507.
1.10 All costs relating to or arising out of carrying out the tests and submission of test
reports and or samples to the Engineer-in-Charge for his approval during the entire
tenure of the work shall be borne by the contractor and included in the quoted rates.
Mu Materials for approval shall be separately stored and marked, as directed by the
Engineer-in-Charge and shall not be used in the works till these are approved.
12 All rejected materials shall be immediately removed from the site by the Contractor
at his own cost
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced]
copied, exhibited of used, except in the
NEW DELHI 6-68-0002
Page 3 of 16
} ENGINEERS INDIA LIMITED MATERIALS Sean