PROJECT: FRABELLE SALCEDO

LOCATION:Tordesillas St. cor. Bautista St. Makati City

SAMPLE MONITORING

Sample # Date of
Pouring Supplier Des. (PSI) Agg. Mixture Vol. (m³) Structure Flr. Level Location # Samples 7 Days 14 Days 28 Days Remarks
Sched. For Date of Sched. For Date of Sched. For Date of
Testing Testing Age Results Testing Testing Age Results Testing Testing Age Results
Sample 1 Sample 2 Average Sample 1 Sample 2 Average Sample 1 Sample 2 Average
1 11-Mar-17 MCPI 3000 3/4 PCD 11 Bored Pile #3 4 18-Mar-17 18-Mar-17 7 2510 2510 25-Mar-17 27-Mar-17 16 2920 2920 8-Apr-17
2 13-Mar-17 MCPI 3000 3/4 PCD 28 Bored Pile # 4,8,31 8 22-Mar-17 22-Mar-17 9 2580 2550 2,565 27-Mar-17 27-Mar-17 14 3050 2830 2,940 10-Apr-17
3 14-Mar-17 MCPI 3000 3/4 PCD 14 Bored Pile # 40 8 22-Mar-17 22-Mar-17 8 2440 2480 2,460 28-Mar-17 29-Mar-17 15 2920 3130 3,025 11-Apr-17
4 15-Mar-17 MCPI 3000 3/4 PCD 66 Bored Pile #1,5,9,11,21,32,34 8 22-Mar-17 22-Mar-17 7 2450 2360 2,405 29-Mar-17 29-Mar-17 14 2980 2850 2,915 12-Apr-17
5 16-Mar-17 MCPI 3000 3/4 PCD 37 Bored Pile # 2,7,41 8 23-Mar-17 23-Mar-17 7 2300 2360 2,330 30-Mar-17 3-Apr-17 18 3180 3350 3,265 13-Apr-17 PASSED
6 17-Mar-17 MCPI 3000 3/4 PCD 24 Bored Pile # 10,33,26 8 24-Mar-17 27-Mar-17 10 2410 2510 2460 31-Mar-17 3-Apr-17 17 3440 3230 3,335 14-Apr-17 PASSED
7 18-Mar-17 MCPI 3000 3/4 PCD 53 Bored Pile # 6,12,14,16,42 8 25-Mar-17 27-Mar-17 9 2450 2550 2500 1-Apr-17 3-Apr-17 16 3170 3360 3,265 15-Apr-17 PASSED
8 21-Mar-17 CMI 3000 3/4 PCD 52 Bored Pile # 13,15,22,24,35,37,45 8 28-Mar-17 28-Mar-17 7 2480 2520 2500 4-Apr-17 4-Apr-17 14 3130 3210 3,170 17-Apr-17 PASSED
9 22-Mar-17 MCPI 3000 3/4 PCD 26 Bored Pile # 17,19,27,29 6 29-Mar-17 29-Mar-17 7 2450 2450 5-Apr-17 5-Apr-17 14 2900 3260 3,080 18-Apr-17 PASSED
10 23-Mar-17 MCPI 3000 3/4 PCD 28 Bored Pile # 20,23,36,44 8 1-Apr-17 3-Apr-17 11 2520 2560 2540 6-Apr-17 0 19-Apr-17
11 24-Mar-17 MCPI 3000 3/4 PCD 14 Bored Pile # 18,38 8 31-Mar-17 3-Apr-17 10 2490 2550 2520 7-Apr-17 0 20-Apr-17
12 Bored Pile
24-Mar-17 MCPI 5000 3/4 PCD 4 Build Up #7,10 8 31-Mar-17 3-Apr-17 10 5210 5490 5350 7-Apr-17 0 21-Apr-17 PASSED
13 25-Mar-17 MCPI 3000 3/4 PCD 35 Bored Pile # 25,28,30,39,43 8 1-Apr-17 3-Apr-17 9 2430 2490 2460 8-Apr-17 0 22-Apr-17
14 Bored Pile
29-Mar-17 MCPI 5000 3/4 PCD 3.5 Build Up #21,42 8 5-Apr-17 12-Mar-17 26-Apr-17
15 30-Mar-17 MCPI 5000 3/4 PCD 21 FOOTING GL 5/D(F-6) 8 6-Apr-17 17-Apr-17 27-Apr-17
16 4-Apr-17 MCPI 5000 3/4 ORD 1 PEDESTAL GL 5/D(F-6) 11-Apr-17
PROJECT: FRABELLE SALCEDO
LOCATION:TORDESILLAS ST. COR. BAUTISTA ST. MAKATI CITY
SUBJECT: PDA AND PIT CYLINDER RESULTS MONITORING as of April 3, 2017

PILE DYNAMIC ANALYSIS (PDA)


7 DAYS 14 DAYS 21 DAYS
BP # DATE POURED CONCRETE DESIGN
DATE RESULTS(psi) DATE RESULTS(psi) DATE RESULTS(psi)
7 16-Mar-17 3000 psi 23-Mar-17 2300, 2360 30-Mar-17 3180, 3350
10 17-Mar-27 3000 psi 24-Mar-27 2410, 2510 31-Mar-27 3440, 3230
21 15-Mar-17 3000 psi 22-Mar-17 2450, 2360 29-Mar-17 2980, 2850 5-Apr-17 2860, 3020
42 18-Mar-17 3000 psi 25-Mar-17 2450, 2550 1-Apr-17 3170, 3360

PILE INTEGRETY TEST (PIT)


7 DAYS 14 DAYS 21 DAYS
BP # DATE POURED CONCRETE DESIGN
DATE RESULTS(psi) DATE RESULTS(psi) DATE RESULTS(psi)
4 13-Mar-17 3000 psi 20-Mar-17 2580, 2520 27-Mar-17 3050, 2830 5-Apr-17 4080, 4170
12 18-Mar-17 3000 psi 25-Mar-17 2450, 2550 1-Apr-17 3170, 3360
24 21-Mar-17 3000 psi 28-Mar-17 2480, 2520 4-Apr-17 3130, 3210
27 22-Mar-17 3000 psi 29-Mar-17 2450 5-Apr-17 2900, 3260
30 25-Mar-17 3000 psi 1-Apr-17 2410, 2510 8-Apr-17
32 15-Mar-17 3000 psi 22-Mar-17 2450, 2360 29-Mar-17 2980, 2850 5-Apr-17 2860, 3020
40 14-Mar-17 3000 psi 21-Mar-17 2440, 2480 28-Mar-17 2920, 3130 5-Apr-17 4050, 3690

Prepared by:

Engr. Isagani Añosa


Concreting In-Charge

Noted By:

Engr. Zandro P. Dañes


Project In-Charge
28 DAYS
DATE RESULTS(psi)
13-Apr-17 PASSED
14-Apr-27 PASSED
12-Apr-17
15-Apr-17 PASSED

28 DAYS
DATE RESULTS(psi)
10-Apr-17 PASSED
15-Apr-17 PASSED
18-Apr-17 PASSED
19-Apr-17
22-Apr-17
12-Apr-17
11-Apr-17 PASSED
PROJECT: FRABELLE SALCEDO
LOCATION: TORDESILLAS ST. COR. BAUTISTA ST. MAKATI CITY

DATE DESCRIPTION DESIGN


11-Mar-17 BORED PILE (#3) 3000 3/4 PCD
13-Mar-17 BORED PILE (# 4,8,31) 3000 3/4 PCD
14-Mar-17 BORED PILE (# 40) 3000 3/4 PCD
15-Mar-17 BORED PILE (#1,5,9,11,21,32,34) 3000 3/4 PCD
16-Mar-17 BORED PILE (# 2,7,41) 3000 3/4 PCD
17-Mar-17 BORED PILE (# 10,33,26) 3000 3/4 PCD
18-Mar-17 BORED PILE (# 6,12,14,16,42) 3000 3/4 PCD
21-Mar-17 BORED PILE (# 13,15,22,24,35,37,45) 3000 3/4 PCD
22-Mar-17 BORED PILE (# 17,19,27,29) 3000 3/4 PCD
23-Mar-17 BORED PILE (# 20,23,36,44 3000 3/4 PCD
24-Mar-17 BORED PILE (# 18,38) 3000 3/4 PCD
25-Mar-17 BORED PILE (# 25,28,30,39,43) 3000 3/4 PCD
30-Mar-17 FOOTING (GL 5/D(F-6)) 3000 3/4 PCD
TOTAL VOLUME
11
28
14
66
37
24
53
52
26
28
14
35
21