The document summarizes a road construction project in Masbate Province, Philippines for 2019. It outlines two sections of the Asid-Tigbao-Bara-Malbug Road that were planned for construction, totaling 2,865.59 linear meters. However, the programmed section of the road reduced the length of Section B to 261 linear meters, bringing the total net length to be constructed to 1,986.69 linear meters under Project ID P00330358LZ.
The document summarizes a road construction project in Masbate Province, Philippines for 2019. It outlines two sections of the Asid-Tigbao-Bara-Malbug Road that were planned for construction, totaling 2,865.59 linear meters. However, the programmed section of the road reduced the length of Section B to 261 linear meters, bringing the total net length to be constructed to 1,986.69 linear meters under Project ID P00330358LZ.
The document summarizes a road construction project in Masbate Province, Philippines for 2019. It outlines two sections of the Asid-Tigbao-Bara-Malbug Road that were planned for construction, totaling 2,865.59 linear meters. However, the programmed section of the road reduced the length of Section B to 261 linear meters, bringing the total net length to be constructed to 1,986.69 linear meters under Project ID P00330358LZ.
ORGANIZATIONAL OUTCOME 1 ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS ASID-TIGBAO-BARA-MALBUG ROAD MASBATE PROVINCE AS-PLANNED AS-PROGRAMMED SECTION A - STA. 30+721.31 - STA. 32+447.00; L = 1,725.69 l.m. SECTION A - STA. 30+721.31 - STA. 32+447.00; L = 1,725.69 l.m. SECTION B - STA. 32+740.00 - STA. 33+879.90; L = 1,139.90 l.m. SECTION B - STA. 32+740.00 - STA. 33+001.00; L = 261.00 l.m. NET LENGTH - 2,865.59 l.m. NET LENGTH - 1,986.69 l.m. PROJECT ID - P00330358LZ