You are on page 1of 26

SUMIT HALDER

vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,


Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565

Ref No - Bill No - 16(C-6) Date- 23/09/2015

To,
Sugam Park
Sugam Park Site
Asansol
50% Roof work AT - C-6

Sl Past Present Total Past Present Total


Description Rate Unit Quntity
No Quntity Quntity Amount Amount Amount
1 50 % Roof Work 60 Sf ─ 6937.02 6937.02 ─ 416221.20 416221.20

(Rupees fourLac sixteen thousand two hundread twenty one & twenty paisa only )
SUMIT HALDER
vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,
Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565
SUMIT HALDER
vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,
Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565
SUMIT HALDER
vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,
Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565

Ref No - Bill No - 14(C-6) Date - 29/06/15

To,
Sugam Park
Sugam Park Site
Asansol

¤ LOFT WORK AT BLOCK -C-6 :-


Sl Description of work Quntity Unit Rate Amount
No
1 Shuttering 120.978 m² 275 33268.95
2 Concrete 7.459 m³ 3000 22377.00
3 Plaster 220.48 m² 98 21607.04
4 Steel 0.532 Mt 4200 2234.40
Total = Rs 79487.39

(Rupees Seventy Nine Thousand Four Hundread Eighty Seven & Thirty Nine Only .)

....................................... ....................................

Sing of Site In Charge Sing of Contractor


SUMIT HALDER
vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,
Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565

Ref No - Bill No - 15 (C-6) Date - 06/07/15

To,
Sugam Park
Sugam Park Site
Asansol

ROOF LIFT MACHINE ROOM AT BLOCK - C6

Sl
No Description of work Quntity Unit Rate Amount
1 250 mm Thk Brick Work 9.588 m³ 3015 28907.82
2 125 mm Thk Brick Work 3.938 m² 380 1496.44
3 Chipping 108.00 Sf 1.70 183.6
4 outside plaster 74.181 m² 120 8901.72
5 Shuttering 2.323 m² 275 638.83
6 Inside Plaster 61.879 m² 98 6064.14
7 Concrete 0.098 m³ 3000 294
8 Steel 0.005 Mt 4200 21
9 Door Frame Fixing 1 Nos 150 150
Total Rs = 46657.55

Lifing Added For The Roof Work 5% = 2332.87


Total Amount = ( 46657.55 +2332.87) = 48990.42

(Rupees fourty eight thousand nine hundread ninenty & forty two Paisa only)

....................................... ....................................

Sing of Site In Charge Sing of Contractor


SUMIT HALDER
vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,
Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565

Ref No - Bill No - 17 (C-6) Date - 27/11/15

To,
Sugam Park
Sugam Park Site
Asansol

Block - C-6 Roor Mumpti Room

Sl Description of work Quntity Unit Rate Amount


No
1 250 mm Thk Brick Work 5.125 m³ 3015 15451.88
2 125 mm Thk Brick Work 2.97 m² 380 1128.60
3 Chipping 312.69 Sf 1.70 531.58
4 Inside Plaster 93.42 m² 98 9155.16
5 Concrete 0.126 m³ 3000 378.00
6 Shuttering 2.07 m² 275 569.25
7 outside plaster 59.68 m² 120 7161.60
8 Door Frame Fixing 2 Nos 150 300.00
9 Steel 0.008 Mt 4200 33.60
Total = Rs 34709.66

Lifing Added For The Roof Work 20% = 6941.93

Total Amount = ( 34709.66 + 6941.93) = 41651.59

( Rupees forty one thousand Six hundread fify one & fify nine Paisa only )
....................................... ....................................

Sing of Site In Charge Sing of Contractor


SUMIT HALDER
vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,
Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565

Ref No - Bill No - 18 (C-6) Date - 27/11/15

To,
Sugam Park
Sugam Park Site
Asansol

Block - C-6 Roof Tank work

Sl Description of work Quntity Unit Rate Amount


No
1 I.P.S Floor ( Avg 40 mm Thk) 18.963 Sf 12.30 233.24
2 Plaster With Net Cement 21.18 m² 150 3177.00
3 250 mm Thk Brick Work 2.537 m³ 3015 7649.06
4 outside plaster 34.418 m² 120 4130.16
5 Inside Plaster 33.524 m² 98 3285.35
Total = Rs 18474.81

Lifing Added For The Roof Work 20% = 3694.96

Total Amount = ( 18474.81 + 3694.96) = 22169.77

( Rupees tweenty two Thousand one hundred Sixty nine & seventy Seven paisa only )

....................................... ....................................

Sing of Site In Charge Sing of Contractor


SUMIT HALDER
vill - Badartala , P.o - Boria ,P.s - Diamond Harbour,
Dist - South 24 Paraganas, Pin -743368
Mob - 9734048565

Date- 17/06/2015

....................................... ....................................

Sing of Site In Charge Sing of Contractor


Halder enterprise
MEASURMENT SHEET

Sheet - 1

¤ LOFT WORK AT BLOCK -C-6 :-

Sl Description of work L(m) B(m) H(m) Quntity No T. Quntity Unit


No
1 Shuttering 1.275 1.5 — 1.913 52 99.45 m²
side shuttering 1.275 — 0.075 0.096 2 x52 9.88 m²
side shuttering 1.5 — 0.075 0.113 2 x52 11.648 m²
120.978 m²
2 R.C.C 1.5 1.275 0.075 0.143 52 7.459 m³

3 Plaster (two Side ) 1.5 1.275 — 1.913 2 x52 198.952 m²


Side Plaster 1.275 — 0.075 0.096 2 x52 9.88 m²
Side Plaster 1.5 — 0.075 0.113 2 x52 11.648 m²
220.48 m²

4 . Steel = 1.195 x 11 x 0.395 = 5.192 x 52 Nos = 269.984 Kg


8 ø150c/c 1.42 x 9 x 0.395 x 5.048 x52 Nos = 262.496 Kg
532.48 kg = 0.532 Mt
Halder enterprise
MEASURMENT SHEET

Sheet No -2

LIFT MACHINE ROOM BLOCK -C-9

Sl Description of work L(m) B(m) H(m) Quntity No T. Quntity Unit


No
1 250 mm Thk Brick Work 3.375 0.25 2.5 2.109 2 4.21875 Cum
250 mm Thk Brick Work 3.25 0.25 2.5 2.031 2 4.0625 Cum
250 mm Thk Brick Work 3.375 0.25 0.25 0.211 2 0.421875 Cum
(Machine Room Roof)
250 mm Thk Brick Work 3.25 0.25 0.25 0.203 2 0.40625 Cum
(Machine Room Roof)

250 mm Thk Brick Work(Lif Machine


Room Floor 3.375 0.25 1.1 0.928 1 0.928125 Cum
Bottom )
Deducation for door area 1 0.25 1 0.250 -1 -0.25 Cum
Deducation for window area 0.9 0.25 0.9 0.203 -1 -0.2025 Cum
Total 250 mm Brick work 9.585 Cum

125 mm Thk Brick Work


2 4.375 0.9 — 3.9375 1 3.938 m²
(Stair Raling )

3. Outside Plaster
Out side Plaster Floor Cloum 0.25 — 1.1 0.275 4x2 2.20 sqm
outside plaster 3.875 — 4.65 18.019 1 18.02 sqm
outside plaster 3.75 — 3.55 13.313 2 26.63 sqm
outside plaster 3.75 — 3.55 13.313 1 13.31 sqm
Stair Raling 4.375 — 0.9 3.9375 2 7.88 sqm
Roof Top Plaster 3.375 0.25 — 0.84375 2 1.69 sqm
Roof Top Plaster 3.25 0.25 — 0.8125 2 1.63 sqm
Roof inside Plaster 3.375 — 0.25 0.84375 2 1.69 sqm
Roof inside Plaster 3.25 — 0.25 0.8125 2 1.63 sqm
Ellevison Plaster 1.3 0.45 0.585 2 1.17 sqm
Ellevison Plaster 1.3 — 0.075 0.0975 1 0.10 sqm
Ellevison Plaster 0.45 — 0.075 0.03375 2 0.07 sqm
Deducation for door area 1 1 1 -1 -1.00 sqm
Deducation for window area 0.9 0.9 0.81 -1 -0.81 sqm
Total Outside plaster 74.18 sqm
Halder enterprise
MEASURMENT SHEET
4 InsidePlaster
Inside Plaster 3.375 — 2.7 9.113 2 18.23 sqm
Inside Plaster 3.25 — 2.7 8.775 2 17.55 sqm
celing plaster 3.375 — 3.25 10.969 1 10.97 sqm
Window Plaster 0.9 0.25 0.225 4 0.90 sqm

Sheet no - 3

Floor Wall Plaster 3.375 — 1.1 3.7125 1 3.71 sqm


Floor celing Plaster 3.3 1.5 — 4.95 1 4.95 sqm
Floor Beam Plaster 1.55 0.25 — 0.3875 2 0.78 sqm
Floor Beam Plaster 1.55 0.25 — 0.3875 3 1.16 sqm
Floor Beam Plaster 3.3 0.25 — 0.825 2 1.65 sqm
Stair Bottom 2.25 1.1 — 2.475 1 2.48 sqm
Stair Bottom 1.2 1.1 — 1.32 1 1.32 sqm
Deducation for door area 1 1 1 -1 -1.00 sqm
Deducation for window area 0.9 0.9 0.81 -1 -0.81 sqm
Total Inside Plaster 61.88 sqm
5 Shuttering
Shuttering Elevison 1.3 0.7 — 0.91 2 1.82 sqm
Side Shuttring 1.3 — 0.075 0.098 2 0.195 sqm
Side Shuttring 0.45 — 0.075 0.034 2 0.0675 sqm
Lintel Shuttering 1.2 — 0.1 0.120 2 0.24 sqm
Total shuttering 2.323 sqm
6 RCC Elevison 1.3 0.7 0.075 0.06825 1 0.068 Cum
RCC linel 1.2 0.25 0.1 0.03 1 0.030 Cum
Total RCC 0.098 Cum

7 Steel Elevison = 8 x 0.62 X 0.395 = 1.959 Kg


4 x 1.22 x 0.395 = 1.927 Kg
Liintel = 1.12 x 4 x0.395 Kg = 1.769 Kg
5.655 Kg
0.005 Mt

8 Door Frame Fixing = 1 Nos


Halder enterprise
MEASURMENT SHEET

Sheet -4

¤ Block - C- 9 Mumpti Room : -


Sl Description of work L(m) B(m) H(m) Quntity No T. Quntity Unit
No
1 . 250 mm Thk Brick Work (Mumpty Room ) 2.425 0.250 2.2 1.334 4 5.335 Cum
250 mm Thk Brick Work (Mumpty Room ) 1.55 0.250 2.2 0.853 2 1.705 Cum
250 mm Thk Brick Work (Mumpty Room ) 3.4 0.250 2.2 1.870 2 3.74 Cum

250 mm Thk Brick Work . ((Mumpty Room Cum


Roof ) 2.9 0.25 0.25 0.181 2 0.3625

250 mm Thk Brick Work . ((Mumpty Room Cum


Roof ) 3.7 0.25 0.25 0.231 1 0.23125

250 mm Thk Brick Work . ((Mumpty Room Cum


Roof ) 3.7 0.25 0.4 0.370 1 0.37

250 mm Thk Brick Work . ((Mumpty Room Cum


Roof ) 3.925 0.25 0.4 0.393 2 0.785
Deducation for door area 2.5 0.25 2.2 1.375 -2 -2.75
Deducation for window area 0.9 0.25 2.1 0.473 -2 -0.945
Total 250 mm Brick work 8.834 Cum

2 . 125 mm Thk Brick Work 2.1 – 0.9 1.89 1 1.89 sqm


125 mm Thk Brick Work 1.2 – 0.9 1.08 1 1.08 sqm
Total 125 mm Brick work 2.97 sqm

3 Inside Plaster
Inside Plaster 8.3 – 2.3 19.09 2 38.18 Sqm
Inside Plaster 0.45 – 2.3 1.035 4 4.14 Sqm
Celing Plaster 8.3 3.5 – 29.05 1 29.05 Sqm
Beam Side Plaster 3.5 – 0.275 0.9625 4 3.85 Sqm
Halder enterprise
MEASURMENT SHEET
Beam Side Plaster 2.1 – 0.9 1.89 2 3.78 Sqm
Beam Side Plaster 1.2 – 0.9 1.08 2 2.16 Sqm
Roof Parapit Wall inside Plaster 2.9 – 0.25 0.725 2 1.45 Sqm
Roof Parapit Wall inside Plaster 3.7 – 0.25 0.925 1 0.93 Sqm
Roof Parapit Wall inside Plaster 3.7 – 0.4 1.48 1 1.48 Sqm
Roof Parapit Wall inside Plaster 3.925 – 0.4 1.57 2 3.14 Sqm
Roof Parapit Wali top Plaster 21.05 0.25 – 5.2625 1 5.26 Sqm
Deducation for door area 0.9 2.1 1.89 -1 -1.89 Sqm
Total Insider Plaster 91.53 Sqm

Sheet no -5

4 Outside plaster

Out Side Plaster 8.8 – 2.6 22.88 2 45.76 Sqm


Out Side Plaster 4 – 1.3 5.2 1 5.2 Sqm
Out Side Plaster 0.75 – 2.5 1.875 4 7.5 Sqm
Out Side Plaster 4 – 0.65 2.6 1 2.6 Sqm
Chajja Plaster 1 0.6 – 0.6 4 2.4 Sqm
Out Side Plaster 8.8 – 2.6 22.88 2 45.76 Sqm
Out Side Plaster 4 – 1.3 5.2 1 5.2 Sqm
Out Side Plaster 0.75 – 2.5 1.875 4 7.5 Sqm
Out Side Plaster 4 – 0.65 2.6 1 2.6 Sqm
Chajja Plaster 1 0.6 – 0.6 4 2.4 Sqm
Deducation for door area 0.9 2.1 1.89 -1 -1.89 Sqm
Total plaster 125.03 Sqm

5 RCC Chajja 1.2 0.7 0.075 0.063 2 0.126 m³

6 Shuttering Chajja 1.2 0.7 – 0.84 2 1.68 m²


Side Shuttering 1.2 – 0.075 0.09 2 0.18 m²
Side Shuttering 0.7 – 0.075 0.0525 4 0.21 m²
Total Shuttering 2.07 m²

7 Door Fame Fixing = 2 Nos

8 Steel Chajja = 8 x 0.62 X 0.395 = 1.959 Kg x 2 Nos = 3.918 Kg


5 x 1.12 x 0.395 = 2.212 Kg x 2 = 4.424 Kg
Halder enterprise
MEASURMENT SHEET
8.342 Kg = 0.008 Mt

Sheet No -6

¤ Block - C-9Roof Tank Work :-

Sl Description of work L(m) B(m) H(m) Quntity No T. Quntity Unit


No

1 . P.C.C floor 5.125 3.7 0.05 0.948 1 0.948 m²

2 . Net Cement (wall) 5.125 – 1.2 6.15 2 12.30 m²


Net Cement (wall) 3.7 – 1.2 4.44 2 8.88 m²
Net Cement (floor) 5.125 3.7 – 18.9625 1 18.96
Total Net cement 40.14 m²

3 . 250 mm Thk Brick Work ( Tank Top ) 3.7 0.25 0.25 0.2313 1 0.231 m³
250 mm Thk Brick Work ( Tank Top ) 3.7 0.25 0.9 0.8325 1 0.833 m³
250 mm Thk Brick Work ( Tank Top ) 5.125 0.25 0.575 0.7367 2 1.473 m³
2.537 m³

4 . Outside Plaster
out Side Plaster Tank 3.7 – 1.375 5.0875 2 10.175 Sqm
out Side Plaster Tank 5.125 – 1.375 7.047 2 14.094 Sqm
Out side Plaster ( tank Top Wall outside) 3.7 – 0.25 0.925 1 0.925 Sqm
Out side Plaster ( tank Top Wall outside) 3.7 – 0.9 3.330 1 3.330 Sqm
Out side Plaster ( tank Top Wall outside) 5.125 – 0.575 2.947 2 5.894 Sqm
Total Outside Plaster 67.941 Sqm
5 Intside Plaster
Inside Plaster ( Celing ) 3.7 5.125 – 18.963 1 18.96 Sqm
Halder enterprise
MEASURMENT SHEET
Inside Plaster ( tank Top Wall inSide ) 3.7 – 0.25 0.925 1 0.93 Sqm
Inside Plaster ( tank Top Wall inSide ) 3.7 – 0.9 3.330 1 3.33 Sqm
Inside Plaster ( tank Top Wall inSide ) 5.125 – 0.575 2.947 2 5.89 Sqm
Inside Plaster (tank top wall top ) 17.65 0.25 – 4.4125 1 4.41 Sqm
Total Inside Plaster 33.52 Sqm
Halder enterprise
MEASURMENT SHEET
Halder enterprise
MEASURMENT SHEET
Halder enterprise
MEASURMENT SHEET
Halder enterprise
MEASURMENT SHEET

qm
Halder enterprise
MEASURMENT SHEET

qm
Halder enterprise
MEASURMENT SHEET

`
Halder enterprise
MEASURMENT SHEET

\ MNIO0
SUMIT HALDER
MEASURMENT SHEET
Sheet No -1

■ Block -C-6 Mumpti Room :-

Sl Description Of Work Quntity Unit


No
1 250 mm Thk Brick Work 5.215 m³
2 125 mm Thk Brick Work 2.97 m²
3 Chipping 29.05 m² = 312.694 Sf
4 Inside Plaster 93.42 m²
5 Concrete 0.126 m³
6 Shuttering 2.07 m²
7 Out Side Plaster 59.68 m²
8 Door Frame Fixing 2 Nos
9 Steel 0.008 Mt
SUMIT HALDER
MEASURMENT SHEET

Sheet No - 1

■ Block - C-6 Roof Tank Work :-

Sl
No Description Of Work Quntity Unit
1 I.P.S Floor 18.963 m² = 204.117 Sf
2 Plaster With Net Cement 21.18 m²
3 250 mm Thk Brick Work 2.537 m³
4 Out Side Plaster 34.418 m²
5 Inside Plaster 33.524 m²
SUMIT HALDER
MEASURMENT SHEET

Sl Description Of Work Quntity Unit


No
SUMIT HALDER
MEASURMENT SHEET