You are on page 1of 1

PROJECT:

ASF CITY
MOTORWAY M-9
KARACHI
CLIENT:

HEADQUARTER AIRPORTS SECURITY FORCE


FOUNDATION SECRETARIAT

CONSULTANT ARCHITCT:

MEP CONSULTANTS:(J.V)

S R CONSULTANTS
CONSULTING ENGINEERS & PLANNERS

SRC

TITLE:

PROPOSED
SLEEVES SECTION
& DETAILS
( MASTER PLAN )

REVISION:

NO. DATE DETAILS

01 30/06/18 ISSUED FOR CONSTRUCTION


02 27/07/18 REVISED AS PER UPDATED MATER PLAN
03 --/--/--
04 --/--/--

05 --/--/--
06 --/--/--
DESIGNED BY : APPROVED BY :

KM Z. RAZI
CAD BY : SCALE :

TT NTS
CHECKED BY : DATE:

IA 27-07-2018
DRAWING NO. :

UESI-ASF-MB-EL06
DRAWING STATUS:

CONSTRUCTION DRAWING

LEGENDS

40 Ft. External Lighting Pole


1 or 2 x Heads with 120 Watt
LED Street Light

20 Ft. Solar Column Lighting with


1 No. 52 Watt LED Light

80 Ft. High Mast Tower with


12 Nos. 120 Watt LED Flood Lights

NOTE:
1.0. THE SIZE OF STORM WATER DRAIN SHOWN IN THIS
SECTION IS INDICATIVE ONLY. THE SECTION SHALL BE
FINALIZED AFTER THE APPROVAL OF DRAINS
LOCATION.

NOTE:
2.0. ALL PIPES / SLEEVES ENDS SHALL BE PLUGGED
WITH REQUIRED SIZE OF END CAPS BEFORE BACK
FILLING.
DRAWING REFERENCE:
\\Server-pc\d\UESI\ASF CITY - 2017\04 - DRAWINGS\02 - ELECTRICAL\02 - MASTER PLAN JUNE 2018\12 - 24 JULY 2018\01 - UPDATED DRAWINGSEL06 - SECTION DETAILS..dwg Jul 27, 2018 - 7:35pm

You might also like